roofy

16-50 Hancock Street

Queens, NY 11385BBL 4-03549-0040Map

Owner of record: 1621 Hancock LLC

16-50 Hancock Street is a walk-up apartment building built in 1931 in Queens, 11385. It has 5 residential units across 2 floors. The owner of record is 1621 Hancock LLC. HPD has recorded 45 housing violations here, most recently on April 25, 2024.

HPD violations
45
DOB violations
0
ECB violations
4
HPD complaints
136

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 25, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 45

  • C

    Replace or repair the self-closing the doors that is missing or defective building entrance door latch at public hall, 1st story

    Apr 25, 2024

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective building entrance door latch assembly at public hall, 1st story

    Apr 25, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 30, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 8, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 3, 2022

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 3, 2022

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 3, 2022

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 23, 2016

    Closed — Violation dismissed
Show 35 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 3, 2015

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of rodents rats at cellar

    Nov 5, 2014

    Closed — Violation closed
  • C

    Cleanse and disinfect to the satisfaction of this department after removing the raw sewage,rubbish and water at cellar

    Nov 5, 2014

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2r, 2nd story, apartment at west

    Oct 23, 2014 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair the broken or defective bottom sash west window. in the kitchen located at apt 2r, 2nd story, apartment at west

    Oct 23, 2014 · Apt 2R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2r, 2nd story, apartment at west

    Oct 23, 2014 · Apt 2R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 2r, 2nd story, apartment at west

    Oct 23, 2014 · Apt 2R

    Closed — Violation closed
  • C

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet bowl in the bathroom located at apt 2r, 2nd story, apartment at west

    Oct 23, 2014 · Apt 2R

    Closed — Violation closed
  • C

    Replace with new the missing lower sash and glass east window. in the 1st bedroom from north located at apt 2r, 2nd story, apartment at west

    Oct 23, 2014 · Apt 2R

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Feb 27, 2013 · Apt 1R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Feb 27, 2013 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair the broken or defective paving to building at front areaway

    Nov 23, 2012

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimun

    Nov 23, 2012

    Closed — Violation closed
  • B

    Replace with new the missing wood baluster 1 at public hall stairs, 1st story

    Sep 12, 2012

    Closed — Violation closed
  • B

    Replace with new the missing wood baluster 1 at public hall, 2nd story

    Sep 12, 2012

    Closed — Violation closed
  • B

    Properly repair the broken or defective lower sash spring balance at 1st window north in the 1st room from north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 12, 2012 · Apt 2R

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 12, 2012 · Apt 2R

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the 1st room from north located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 12, 2012 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective lower sash spring balance at 2nd window south in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 12, 2012 · Apt 2R

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 12, 2012 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 12, 2012 · Apt 2R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector inoperative located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 12, 2012 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair the broken or defective or inoperative lock at building entrance door 1st at south

    Sep 12, 2012

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in drain pipe at bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Sep 12, 2012 · Apt 2R

    Closed — Violation closed
  • B

    Replace with new the missing door knob at vestibule at public hall, 1st story

    Aug 23, 2012

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following at least 100 watts at building front

    Aug 23, 2012

    Closed — Violation closed
  • B

    Properly repair the broken or defective lower and upper window sash in the bathroom located at apt 1l, 1st story, 1st apartment from west at north

    Aug 23, 2012 · Apt 1L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and wals in the bathroom located at apt 1l, 1st story, 1st apartment from west at north

    Aug 23, 2012 · Apt 1L

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the 2nd room from east located at apt 1l, 1st story, 1st apartment from west at north

    Aug 23, 2012 · Apt 1L

    Closed — Violation closed
  • B

    Properly repair the broken or defective counter balance at lower and upper window sash in the kitchen located at apt 1l, 1st story, 1st apartment from west at north

    Aug 23, 2012 · Apt 1L

    Closed — Violation closed
  • B

    Replace with new the missing vestibule door knobs at public hall, 1st story

    Aug 18, 2012

    Closed — Violation closed
  • C

    Properly repair the broken or defective building entrance door lock at public hall, 1st story

    Aug 18, 2012

    Closed — Violation closed
  • A

    Replace with new the missing handle at entrance door from vestibule to , 1st story

    Jan 25, 2011

    Closed — Violation closed
  • A

    Refit hinges at entrance door from vestibule to public hall , 1st story

    Jan 25, 2011

    Closed — Violation closed
  • A

    Properly repair the broken or defective locks at mail boxes at vestibule , 1st story

    Jan 25, 2011

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 4

  • Class - 2

    Failure to maintain bldg in code cokmpliant manner. defects noted: at rear yard at front of cellar steps section of concrete slab cracked & sunken not yet repaired stored fire hazard debris attach to dwelling

    Sep 26, 2014 · Penalty $2,500

    Active
  • Class - 2

    Work w/o permit. work noted: at rear attach to dwelling erected woodendeck approx 14'x12'x8'h w/steps & guard rails. nov issued on 8-24-12 #34985249x for the same deck but no c of c filed w/dob. no filing in

    Sep 26, 2014 · Penalty $4,000

    Active
  • Class - 2

    Work without a permit. noted:at rear yard,found wood frame deck approx14' x 12' x 8'h with steps & guard rails installed without a permit. rem:obtain a permit or restore premises to legal conditions.

    Aug 24, 2012 · Penalty $800

    Active
  • Class - 2

    Failure to maintain bldg. noted:at rear yard in front of cellar steps found section of concrete slab approx 2'x 2' cracked & sunk in create a hazardous condition. rem:repair defects forthwith & maintain bldg.

    Aug 24, 2012 · Penalty $500

    Active

Complaints

  • Door/window

    Door

    Mar 7, 2022 · Apt 1L

    Close
  • Electric

    Wiring

    Mar 7, 2022 · Apt BLDG

    Close
  • Door/window

    Door

    Mar 7, 2022 · Apt BLDG

    Close
  • Door/window

    Door

    Mar 3, 2022 · Apt 2R

    Close
  • Plumbing

    Water supply

    Mar 3, 2022 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2015 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2015 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Nov 2, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2014 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Oct 21, 2014 · Apt 1R

    Close
Show 40 more ↓
  • Door/window

    Door

    Oct 21, 2014 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Oct 21, 2014 · Apt 1R

    Close
  • Water leak

    Heavy flow

    Oct 21, 2014 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2014 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2014 · Apt 1R

    Close
  • Water leak

    Heavy flow

    Oct 21, 2014 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Oct 20, 2014 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Oct 15, 2014 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Jul 3, 2014 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jul 3, 2014 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jul 3, 2014 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 3, 2014 · Apt BLDG

    Close
  • Nonconst

    Vermin

    Feb 26, 2013 · Apt 1R

    Close
  • Nonconst

    Vermin

    Feb 26, 2013 · Apt 1R

    Close
  • Nonconst

    Rubbish

    Nov 13, 2012 · Apt 1L

    Close
  • Construction

    Pavement

    Nov 13, 2012 · Apt 1L

    Close
  • Electric

    Lighting

    Nov 13, 2012 · Apt 1L

    Close
  • Plumbing

    Sewer

    Nov 13, 2012 · Apt 1L

    Close
  • General

    Windows

    Nov 13, 2012 · Apt 1L

    Close
  • General

    Windows

    Nov 13, 2012 · Apt 1L

    Close
  • Plumbing

    Water-leaks

    Nov 13, 2012 · Apt 1L

    Close
  • Plumbing

    Water-leaks

    Nov 13, 2012 · Apt 1L

    Close
  • Heating

    Heat related

    Nov 3, 2012 · Apt NA

    Close
  • Nonconst

    Vermin

    Sep 3, 2012 · Apt 2R

    Close
  • General

    Windows

    Sep 3, 2012 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Sep 3, 2012 · Apt 2R

    Close
  • Nonconst

    Vermin

    Sep 3, 2012 · Apt 2R

    Close
  • General

    Locks

    Sep 3, 2012 · Apt 2R

    Close
  • Electric

    Lighting

    Aug 20, 2012 · Apt 1L

    Close
  • General

    Doors

    Aug 20, 2012 · Apt 1L

    Close
  • Plumbing

    Sewer

    Aug 20, 2012 · Apt 1L

    Close
  • Nonconst

    Rubbish

    Aug 20, 2012 · Apt 1L

    Close
  • Nonconst

    Vermin

    Aug 20, 2012 · Apt 1L

    Close
  • Nonconst

    Rubbish

    Aug 20, 2012 · Apt 1L

    Close
  • Nonconst

    Rubbish

    Aug 13, 2012 · Apt 1L

    Close
  • Plumbing

    Sewer

    Aug 13, 2012 · Apt 1L

    Close
  • Plumbing

    Water-leaks

    Aug 13, 2012 · Apt 1L

    Close
  • General

    Doors

    Aug 13, 2012 · Apt 1L

    Close
  • Paint/plaster

    Wall

    Aug 13, 2012 · Apt 1L

    Close
  • General

    Locks

    Aug 13, 2012 · Apt 1L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
2
Residential units
5
Building area
2,800 ft²
Lot area
2,500 ft²
Zoning
M1-4D
Community board
405
Council district
34
Block / lot
3549 / 40
Assessed value
$321,300
Landmark / historic district
No

HPD registration #412987, last renewed Sep 8, 2025.

Questions about 16-50 Hancock Street

Who owns 16-50 Hancock Street?

The owner of record in NYC Department of City Planning PLUTO data is 1621 Hancock LLC.

Does 16-50 Hancock Street have violations?

Yes. NYC HPD has recorded 45 housing violations at this property.

Is 16-50 Hancock Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 16-50 Hancock Street built?

City records list 1931 as the year it was built.

How many apartments are in 16-50 Hancock Street?

It has 5 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.