roofy

16-11 Hancock Street

Queens, NY 11385BBL 4-03548-0108Map

Owner of record: 1611 Hancock LLC

16-11 Hancock Street is a walk-up apartment building built in 1931 in Queens, 11385. It has 4 residential units across 2 floors. The owner of record is 1611 Hancock LLC. HPD has recorded 48 housing violations here, most recently on August 26, 2026. 39 of the 48 most recent violations are still open.

HPD violations
48
DOB violations
0
ECB violations
4
HPD complaints
26

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 26, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 48

  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 26, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 26, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Aug 26, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Aug 26, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 26, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 26, 2026

    Open — Nov sent out
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at wash basin ,water closet and shower stall at cellar

    May 27, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at bsmt-apt 1r lower level, 1st bsmt-apt from east at south

    May 27, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at bsmt-apt 1r lower level, 1st bsmt-apt from east at south

    May 27, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from north at east

    May 27, 2026 · Apt 1R

    Open — Nov sent out
Show 38 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from north at east

    May 27, 2026 · Apt 1R

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2025

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 2, 2024

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2023

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2022

    Open — Info nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard

    May 29, 2022

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 4, 2022

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 4, 2022

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 15, 2021

    Open — Info nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak celing in the bathroom located at apt 1r, 1st story, 1st apartment from west at north

    Oct 22, 2020 · Apt 1R

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Oct 22, 2020 · Apt 1R

    Open — Notice of issuance sent to tenant
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from west at north

    Oct 22, 2020 · Apt 1R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 1r, 1st story, 1st apartment from west at north

    Oct 22, 2020 · Apt 1R

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Oct 22, 2020 · Apt 1R

    Open — Notice of issuance sent to tenant
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 5, 2017

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2016

    Closed — Violation dismissed
  • B

    Replace with new the missing electrical ceiling light fixture, in the 6th room from north located at apt 1r, 1st story, 2nd apartment from west at north

    Nov 28, 2012 · Apt 1R

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out
  • B

    Abate the nuisance consisting of roaches located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from east at south wall in the 6th room from north located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, east wall in the private hallway located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door from east at south wall, 1st door frame from east at south wall, 1st window frame from west at north wall in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from east at south wall, 1st window frame from west at north wall in the kitchen located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st wall cabinet from south at west wall in the 4th room from north located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at west wall in the 5th room from north located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out
  • B

    Abate the nuisance consisting of mice located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 6th room from north located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out
  • A

    Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also heavy-duty dead bolt and latch set located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out
  • B

    Replace or repair the self-closing doors that is missing or defective ,, in the entrance located at apt 1r, 1st story, 2nd apartment from west at north

    Oct 11, 2012 · Apt 1R

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 4

  • Class - 2

    Failure to comply with commissioner's order contained in summons #35671360z issued on 10/13/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert

    Jan 29, 2025 · Penalty $1,250

    Active
  • Class - 3

    Failure to maintain building in code-compliant manner. note - atoi observed metal banister attached to concrete steps that were loose. metal banister was loose and not properly secured to step/building. for fur

    Oct 13, 2023 · Penalty $500

    Active
  • Class - 2

    Work w/o a permit - work noted at cellar level - full height partitions erected subdividing cellar creating rooms. remedy: obtain permit.

    May 21, 2012

    Resolve
  • Class - 2

    Residence altered for occupancy as a dwelling for more than the legally approved # of families. dob records indicate bldg legally approved for 4 family (2nd and 2 apt, 2nd flr) cellar no occupancy, storage &

    May 21, 2012 · Penalty $600

    Active

Complaints

  • Unsanitary condition

    Mold

    Aug 13, 2026 · Apt 1L

    Close
  • Unsanitary condition

    Sewage

    Aug 13, 2026 · Apt 1L

    Close
  • Water leak

    Slow leak

    Aug 13, 2026 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    May 20, 2026 · Apt 1R

    Close
  • Electric

    Wiring

    May 20, 2026 · Apt 1R

    Close
  • Electric

    Power outage

    Apr 7, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Apr 7, 2026 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Feb 28, 2026 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    Feb 28, 2026 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Feb 27, 2026 · Apt 2L

    Close
Show 16 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Jul 21, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 28, 2022 · Apt 1234

    Close
  • Heat/hot water

    Entire building

    Nov 2, 2020 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Oct 19, 2020 · Apt 1R

    Close
  • General

    Mold

    Jan 4, 2013 · Apt IR

    Close
  • Paint/plaster

    Wall

    Jan 4, 2013 · Apt IR

    Close
  • Paint/plaster

    Wall

    Nov 17, 2012 · Apt 1R

    Close
  • Electric

    Wiring

    Nov 17, 2012 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Oct 31, 2012 · Apt IR

    Close
  • Electric

    Wiring

    Oct 31, 2012 · Apt IR

    Close
  • Nonconst

    Vermin

    Oct 4, 2012 · Apt 1R

    Close
  • Nonconst

    Vermin

    Sep 15, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Sep 15, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Sep 15, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Sep 15, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Sep 15, 2012 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1931
Floors
2
Residential units
4
Building area
3,250 ft²
Lot area
2,508 ft²
Zoning
R5B
Community board
405
Council district
34
Block / lot
3548 / 108
Assessed value
$373,050
Landmark / historic district
No

HPD registration #404842, last renewed Sep 10, 2019.

Questions about 16-11 Hancock Street

Who owns 16-11 Hancock Street?

The owner of record in NYC Department of City Planning PLUTO data is 1611 Hancock LLC.

Does 16-11 Hancock Street have violations?

Yes. NYC HPD has recorded 48 housing violations at this property.

Is 16-11 Hancock Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 16-11 Hancock Street built?

City records list 1931 as the year it was built.

How many apartments are in 16-11 Hancock Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.