62-67 61 Street
Queens, NY 11385BBL 4-03519-0001Map
Owner of record: Our Lady-The Miraculo
62-67 61 Street is a school building built in 1918 in Queens, 11385. The owner of record is Our Lady-The Miraculo. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 17
- ECB violations
- 5
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Immediate emergency anythingoptional
Install approximately 130 linear feet of sidewalk shed with a return to provide overhead protection for both entry ways along 61 street
Jul 26, 2023
Dob violation - active - Construction other optional
Premises rendered non compliant due to lightning strike. noted: approximately 15 linear feet of crenulated parapet wall has been displaced by lightning strike along 61st street frontage.
Jul 25, 2023
Dob violation - dismissed - Construction other optional
Premises rendered non compliant due to lightning strike. noted: approximately 15 linear feet of crenulated parapet wall has been displaced by lightning strike along 61st street frontage. as noted in dob vio23-02143
Jul 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed
Show 7 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed
ECB violations · 5
- Class - 2
Temporary construction equipment on site-expired permit. noted; at time of inspection observed a construction fence erected around site with permit # q00379798 expired on 7/21/2021. no new permit on filed for t
Mar 10, 2025
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 40000083102n0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Dec 16, 2024 · Penalty $625
Active - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 40000083102n0005 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Dec 16, 2024 · Penalty $625
Active - Class - 2
Constructed fence not maintained to code. at time of inspection on a 3sty demo site, i observed a construction fence installed at exp#1,2&4.the construction fence is not being maintained due to the following ob
Mar 5, 2022 · Penalty $1,000
Active - Non-hazardous
34a,34b,44a,50,50a,50b.44a-illegal steam pressure gauge must be 'o' tp'30' psi steam gauge with syphon loop(pig tail).50.missing side outlet and discharge pipe for boiler for pop safety valve.2" valve.50a-missi
Oct 27, 2004 · Penalty $180
Active
Complaints
- Unsanitary condition
Pests
Jan 23, 2023 · Apt BUILDI
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W2)
- Year built
- 1918
- Floors
- 5
- Residential units
- —
- Building area
- 69,200 ft²
- Lot area
- 91,965 ft²
- Zoning
- R5B
- Community board
- 405
- Council district
- 30
- Block / lot
- 3519 / 1
- Assessed value
- $6,661,800
- Landmark / historic district
- No
Questions about 62-67 61 Street
Who owns 62-67 61 Street?
The owner of record in NYC Department of City Planning PLUTO data is Our Lady-The Miraculo.
Does 62-67 61 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 62-67 61 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 62-67 61 Street built?
City records list 1918 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.