1829 Cornelia Street
Queens, NY 11385BBL 4-03463-0034Map
Owner of record: Jose R Ochoa
1829 Cornelia Street is a walk-up apartment building built in 1911 in Queens, 11385. It has 6 residential units across 3 floors. The owner of record is Jose R Ochoa. HPD has recorded 187 housing violations here, most recently on September 2, 2026. 28 of the 50 most recent violations are still open.
- HPD violations
- 187
- DOB violations
- 20
- ECB violations
- 0
- HPD complaints
- 178
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 187
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective secondary egress door hinges and latch in the entrance located at apt 2r, 2nd story, 1st apartment from west at north
Sep 2, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Replace with new the missing door knob or handle for re-entry from roof to building at 1st public hall bulkhead from north at west
Aug 26, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule at public hall, 1st story
Aug 26, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at sink drain pipe in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Feb 10, 2026 · Apt 3R
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from north at east
Feb 10, 2026 · Apt 3R
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Feb 10, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Feb 10, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Feb 10, 2026 · Apt 3R
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 3r, 3rd story, 1st apartment from north at east
Feb 10, 2026 · Apt 3R
Open — Not complied with
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Nov 30, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at public hall, 3rd story
Nov 30, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of hook and eye installed on vestibule door to public hall , 1st story
Nov 11, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and latch vestibule to public hall , 1st story
Nov 11, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Nov 11, 2025
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Nov 11, 2025
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Nov 11, 2025
Open — Not complied with - BHazardous
Remove all encumbrances consisting of construction and household items , 1st story
Nov 11, 2025
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective latch assembly vestibule door to public hall , 1st story
Nov 11, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Nov 1, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Open — Not complied with - BHazardous
Repair the roof so that it will not leak ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Oct 3, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 2nd egress door in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at apartment entrance door in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Refit upper sash at west 1 window in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing (2) in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules additional needed in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Oct 3, 2025 · Apt 3R
Open — Not complied with - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Sep 2, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3r, 3rd story, 1st apartment from west at north
Jun 18, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Jun 18, 2025 · Apt 3R
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Jun 18, 2025 · Apt 3R
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
Jun 18, 2025 · Apt 3R
Open — Not complied with - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Jun 18, 2025 · Apt 3R
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective upper window sash spring balance at window to fire escape. in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Jun 18, 2025 · Apt 3R
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at bulkhead at public hall, 3rd story
May 19, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wooden floor panels in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
May 19, 2025 · Apt 3R
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color above room entrance door in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
May 19, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
May 19, 2025 · Apt 3R
Open — Not complied with - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires from light fixture at ceiling to switch at south wall in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
May 19, 2025 · Apt 3R
Open — Not complied with - BHazardous
Refit door and frame at door in the entrance located at apt 3r, 3rd story, 1st apartment from west at north
May 19, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead at public hall, 3rd story
May 19, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door to roof at bulkhead at public hall, 3rd story
May 19, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at bulkhead at public hall, 3rd story
May 19, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
May 19, 2025
Open — Not complied with
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 10 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Outside building
Gutter/leader
Jul 13, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 13, 2026 · Apt BLDG
Close - Outside building
Gutter/leader
Jul 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
Feb 6, 2026 · Apt 3R
Open - Electric
No lighting
Feb 6, 2026 · Apt 3R
Open - Safety
Carbon monoxide detector
Feb 6, 2026 · Apt 3R
Open - Heat/hot water
Apartment only
Feb 6, 2026 · Apt 3R
Open - Flooring/stairs
Floor
Feb 6, 2026 · Apt 3R
Open - Door/window
Door
Feb 6, 2026 · Apt 3R
Open
Show 40 more ↓
- Flooring/stairs
Floor
Feb 6, 2026 · Apt 3R
Open - General
Cabinet
Feb 6, 2026 · Apt 3R
Open - Door/window
Door frame
Feb 6, 2026 · Apt 3R
Open - Door/window
Door
Dec 8, 2025 · Apt 2R
Close - Door/window
Door
Dec 8, 2025 · Apt 2R
Close - General
Signage missing
Dec 8, 2025 · Apt BLDG
Close - General
Signage missing
Dec 8, 2025 · Apt BLDG
Close - General
Signage missing
Dec 8, 2025 · Apt BLDG
Close - General
Signage missing
Dec 8, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 8, 2025 · Apt 3L
Close - Unsanitary condition
Pests
Dec 8, 2025 · Apt 3L
Close - Door/window
Door
Dec 8, 2025 · Apt 3L
Close - Door/window
Door
Dec 8, 2025 · Apt 3L
Close - Unsanitary condition
Pests
Dec 8, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Dec 8, 2025 · Apt 2R
Close - Unsanitary condition
Mold
Dec 8, 2025 · Apt 2R
Close - Outside building
Roofing
Dec 8, 2025 · Apt BLDG
Close - Outside building
Roof door/hatch
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 28, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 30, 2025 · Apt 2L
Close - Water leak
Damp spot
Sep 22, 2025 · Apt 3R
Close - Flooring/stairs
Floor
Sep 22, 2025 · Apt 3R
Close - Safety
Carbon monoxide detector
Sep 22, 2025 · Apt 3R
Close - General
Cabinet
Sep 22, 2025 · Apt 3R
Close - Flooring/stairs
Floor
Sep 22, 2025 · Apt 3R
Close - Plumbing
Basin/sink
Sep 22, 2025 · Apt 3R
Close - Door/window
Window frame
Sep 22, 2025 · Apt 3R
Close - Door/window
Window frame
Sep 22, 2025 · Apt 3R
Close - Electric
Lighting
Sep 22, 2025 · Apt 3R
Close - Plumbing
Basin/sink
Aug 27, 2025 · Apt 3R
Close - Door/window
Door
Aug 27, 2025 · Apt 3R
Close - Electric
No lighting
Aug 27, 2025 · Apt 3R
Close - Door/window
Window frame
Aug 27, 2025 · Apt 3R
Close - Flooring/stairs
Floor
Aug 27, 2025 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Jun 15, 2025 · Apt 3R
Close - Plumbing
Basin/sink
Jun 15, 2025 · Apt 3R
Close - General
Mailbox
Jun 15, 2025 · Apt 3R
Close - Flooring/stairs
Floor
Jun 15, 2025 · Apt 3R
Close - General
Cabinet
Jun 15, 2025 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1911
- Floors
- 3
- Residential units
- 6
- Building area
- 5,600 ft²
- Lot area
- 2,742 ft²
- Zoning
- R6B
- Community board
- 405
- Council district
- 30
- Block / lot
- 3463 / 34
- Assessed value
- $373,500
- Landmark / historic district
- Ridgewood South Historic District
HPD registration #407987, last renewed Feb 5, 2026.
Questions about 1829 Cornelia Street
Who owns 1829 Cornelia Street?
The owner of record in NYC Department of City Planning PLUTO data is Jose R Ochoa.
Does 1829 Cornelia Street have violations?
Yes. NYC HPD has recorded 187 housing violations at this property.
Is 1829 Cornelia Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1829 Cornelia Street built?
City records list 1911 as the year it was built.
How many apartments are in 1829 Cornelia Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.