roofy

789 Seneca Avenue

Queens, NY 11385BBL 4-03462-0001Map

Owner of record: Seneca Elite LLC

789 Seneca Avenue is a mixed residential and retail building built in 1931 in Queens, 11385. It has 5 residential units across 3 floors. The owner of record is Seneca Elite LLC. HPD has recorded 9 housing violations here, most recently on September 8, 2015.

HPD violations
9
DOB violations
29
ECB violations
5
HPD complaints
15

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Sep 8, 2015

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 9

  • C

    Replace with new the broken or defective lower sash pane glass at east-1 window in the 2nd room from north at east located at apt 3f, 3rd story, 1st apartment from south at west

    Sep 8, 2015 · Apt 3F

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Sep 8, 2015

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 4; located at apt 3f, 3rd story, 1st apartment from south at west

    Sep 8, 2015 · Apt 3F

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west

    Sep 8, 2015 · Apt 3F

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective water closet tank cover in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west

    Sep 8, 2015 · Apt 3F

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at west window frame,ceiling and west wall ( ceramic tiles ) total 3 sq.ft in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west

    Sep 8, 2015 · Apt 3F

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling light fixture in the 3rd room from north at east located at apt 3f, 3rd story, 1st apartment from south at west

    Sep 8, 2015 · Apt 3F

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 3f, 3rd story, 1st apartment from south at west

    Sep 8, 2015 · Apt 3F

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector inoperable located at apt 3f, 3rd story, 1st apartment from south at west

    Sep 8, 2015 · Apt 3F

    Closed — Violation dismissed

DOB building violations · 29

  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
Show 19 more ↓
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 internal high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 external high pressure boiler inspection

    Mar 16, 2020

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 internal high pressure boiler inspection

    Mar 16, 2020

    Dob violation - active
  • Plumbing none

    The dob intends to revoke all approvals and permits under plumbing job #402599560 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit

    Aug 29, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued for failure to file 2015 annual high pressure boiler inspection

    Jun 23, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued for failure to file 2014 annual high pressure boiler inspection

    Dec 16, 2016

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued for failure to file 2013 annual high pressure boiler inspection

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Failure to maintain building in code compliant manner. at time of inspection in crystal cleaner i observed illegal pvc piping and jim cap on waste line., repair and/or replace

    Dec 18, 2020 · Penalty $312

    Resolve
  • Class - 2

    18a,18b,50a,50b,50c: (50a)base of chimney dirty. (50b) flue pipe goinginto chimney not sealed. (50c) oil burner transforer leaking insulati on (tar)

    Apr 30, 2010 · Penalty $250

    Resolve
  • Non-hazardous

    50a/50b/.fulton v.t boiler,ghp,nb34551,oil fired,1978.50a-no drain line on the gauge glass assembly.50b-no wheel on gauge glass steam shut off valve.

    Mar 28, 2007 · Penalty $350

    Resolve
  • Non-hazardous

    50a/50b fulto nv.t boiler 6ho nb34551 oil 1978 50a-improper arrangement of the blowdown valves install a screw -type (slow) valve at the outlet end of hte blowdown line 50b-no discharge pipe on the safety

    May 14, 2005

    Resolve
  • Non-hazardous

    49 1)hand holes welded-left side bottom hole leaking from welding 2)blow down and water column drains reduced need two valves in each line also they will not be connected to domestic sewer line.

    Sep 19, 2000

    Resolve

Complaints

  • Water leak

    Heavy flow

    Dec 18, 2020 · Apt 1STFL

    Close
  • Safety

    Window guard broken/missing

    Aug 20, 2015 · Apt 3F

    Close
  • Unsanitary condition

    Mold

    Aug 20, 2015 · Apt 3F

    Close
  • Heating

    Heat related

    Dec 17, 2011 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 19, 2010 · Apt 3R

    Close
  • General

    Windows

    Nov 19, 2010 · Apt 3R

    Close
  • Electric

    Wiring

    Nov 19, 2010 · Apt 3R

    Close
  • Plumbing

    Water-leaks

    Nov 19, 2010 · Apt 3R

    Close
  • General

    Doors

    Nov 19, 2010 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Nov 19, 2010 · Apt 3R

    Close
Show 5 more ↓
  • Paint/plaster

    Wall

    Nov 19, 2010 · Apt 3R

    Close
  • Electric

    Bell-buzzer/intercom

    Nov 19, 2010 · Apt 3R

    Close
  • Nonconst

    Vermin

    Nov 19, 2010 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 19, 2010 · Apt 3R

    Close
  • Heating

    Heat related

    Oct 17, 2009 · Apt 3R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1931
Floors
3
Residential units
5
Building area
5,400 ft²
Lot area
2,255 ft²
Zoning
R6B
Community board
405
Council district
34
Block / lot
3462 / 1
Assessed value
$572,400
Landmark / historic district
No

HPD registration #404757, last renewed Jul 29, 2026.

Questions about 789 Seneca Avenue

Who owns 789 Seneca Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Seneca Elite LLC.

Does 789 Seneca Avenue have violations?

Yes. NYC HPD has recorded 9 housing violations at this property.

Is 789 Seneca Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 789 Seneca Avenue built?

City records list 1931 as the year it was built.

How many apartments are in 789 Seneca Avenue?

It has 5 residential units and 6 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.