1683 Palmetto Street
Queens, NY 11385BBL 4-03448-0043Map
Owner of record: Soo Fung Dong, Trustee
1683 Palmetto Street is a mixed residential and retail building built in 1930 in Queens, 11385. It has 4 residential units across 3 floors. The owner of record is Soo Fung Dong, Trustee. HPD has recorded 54 housing violations here, most recently on June 24, 2025. 38 of the 50 most recent violations are still open.
- HPD violations
- 54
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 170
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 54
- ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stack at all balcony at east side at fire escape
Jun 24, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items at 2nd story balconys 1st and 2nd stack from south at east (building front)
Dec 20, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 1, 2020
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing lock and assembly at north building entrance door
Apr 7, 2020
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 2nd stack from east at north , at 2nd story balcony (building front)
Jan 9, 2020
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall stairs, 3rd story
Dec 19, 2019
Open — Invalid certification - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 19, 2019
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of rodents rats at basement
Jun 13, 2019
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination .. at public hall, 3rd story
May 30, 2019
Open — Invalid certification
Show 40 more ↓
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing , 1st story
May 30, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
May 30, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing , 1st story
May 30, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. , 1st story
May 30, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
May 30, 2019
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
May 30, 2019
Closed — Violation dismissed - BHazardous
Provide approved wire mesh above and below the skylight
May 20, 2019
Open — Nov certified late - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the stairs at public hall stairs, 3rd story
May 20, 2019 · Apt BLDG
Open — Nov certified late - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 20, 2019 · Apt BLDG
Open — Invalid certification - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 20, 2019 · Apt BLDG
Open — Invalid certification - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
May 20, 2019 · Apt BLDG
Open — Invalid certification - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
May 20, 2019 · Apt BLDG
Open — Invalid certification - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
May 20, 2019 · Apt BLDG
Open — Invalid certification - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 20, 2019 · Apt BLDG
Open — Invalid certification - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
May 20, 2019 · Apt BLDG
Open — Nov certified late - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stacks building front all stories
May 20, 2019 · Apt BLDG
Open — Invalid certification - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 2nd stack from east at north ( building front ) at 2nd story balcony
May 20, 2019 · Apt BLDG
Open — Nov certified late - BHazardous
Remove all encumbrances consisting of household articles at stairs from bulkhead to roof
Jul 16, 2014
Open — Nov certified late - ANon-hazardous
Section 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder , at 1st fire escape from north, at west wall. at fire escape
May 19, 2011
Open — Nov certified late - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing , bottom of strings deformed at drop ladder, at 1st fire escape from north, at west wall. at fire escape
May 19, 2011
Open — Nov certified late - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes , house articles at 2nd story balcony of 1st fire escape from north, at west wall. at fire escape
May 19, 2011
Open — Nov certified late - BHazardous
Properly repair the broken or defective pilot light at oven in the kitchen located at apt 3l, 3rd story
May 30, 2003 · Apt 3L
Open — Nov certified late - BHazardous
Remove all encumbrances consisting of house hold items bulkhead stairs at public hall, 3rd story
Apr 18, 2003
Open — Nov certified late - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3l, 3rd story
Feb 2, 2003 · Apt 3L
Open — Nov certified late - BHazardous
Properly repair the broken or defective oven at gas range in the kitchen located at apt 3l, 3rd story
Feb 2, 2003 · Apt 3L
Open — Nov certified late - BHazardous
Abate the nuisance consisting of vermin mice droppings in the kitchen located at apt 3l, 3rd story
Feb 2, 2003 · Apt 3L
Open — Nov certified late - BHazardous
Remove all encumbrances consisting of rubbish and house hold articles at bulkhead at public hall
Feb 2, 2003
Open — Nov certified late - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts required fixture present light not on
Feb 6, 2002
Open — Nov certified late - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the fecal matter cellar south at open space, cellar
May 17, 2000
Open — Nov certified late - BHazardous
M/d law abate the nuisance consisting of concealed ceiling leak cellar thruout.
Jun 29, 1994
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective plaster ceiling cellar thruout.
Jun 29, 1994
Open — Nov certified late - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 2 sty apt 2l. , section '' ''
Nov 14, 1988 · Apt 2L
Open — Nov certified late - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 2 sty apt 2l. , section '' ''
Nov 14, 1988 · Apt 2L
Open — Nov certified late - CImmediately hazardous
M/d law abate the nuisance consisting of double cylinder lock entry door 2 sty apt 2l. , section '' ''
Nov 14, 1988 · Apt 2L
Open — Nov certified late - BHazardous
Provide adequate lighting cellar thruout.
Oct 12, 1988
Open — Nov certified late - BHazardous
Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition garment manufacturing plant 1 sty & cellar.
Oct 12, 1988
Open — Nov sent out - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods north west stack.
Sep 17, 1987
Open — Nov certified late - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing bent & distorted dropladder north west stack er1.
Sep 17, 1987
Open — Nov certified late - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing guide rods northwest stack er1.
Sep 17, 1987
Open — Nov certified late - BHazardous
D26-19.05 adm code provide adequate light of not less than 60 watts incandescent or equivalent illumination 1 sty pub hall vestibule.
Apr 21, 1987
Open — Nov certified late
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Safety
Fire escape
Feb 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2021 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 10, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2021 · Apt 2R
Close - Heat/hot water
Entire building
Feb 7, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2021 · Apt 2L
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt BLDG
Close - Safety
Fire escape
Jan 29, 2021 · Apt 2
Close - Heat/hot water
Entire building
Jan 29, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2021 · Apt 2
Close - Heat/hot water
Entire building
Jan 29, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 29, 2021 · Apt 2
Close - Heat/hot water
Entire building
Jan 26, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2021 · Apt 3L
Close - Heat/hot water
Entire building
Jan 21, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Jan 12, 2021 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1930
- Floors
- 3
- Residential units
- 4
- Building area
- 5,616 ft²
- Lot area
- 2,400 ft²
- Zoning
- R6B
- Community board
- 405
- Council district
- 34
- Block / lot
- 3448 / 43
- Assessed value
- $621,900
- Landmark / historic district
- No
HPD registration #407420, last renewed Nov 17, 2025.
Questions about 1683 Palmetto Street
Who owns 1683 Palmetto Street?
The owner of record in NYC Department of City Planning PLUTO data is Soo Fung Dong, Trustee.
Does 1683 Palmetto Street have violations?
Yes. NYC HPD has recorded 54 housing violations at this property.
Is 1683 Palmetto Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1683 Palmetto Street built?
City records list 1930 as the year it was built.
How many apartments are in 1683 Palmetto Street?
It has 4 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.