120-10 Queens Boulevard
Queens, NY 11415BBL 4-03358-0001Map
Owner of record: The Home Savings Bank
120-10 Queens Boulevard is a walk-up apartment building built in 1923 in Queens, 11415. It has 32 residential units across 5 floors. The owner of record is The Home Savings Bank. HPD has recorded 33 housing violations here, most recently on April 7, 2023.
- HPD violations
- 33
- DOB violations
- 25
- ECB violations
- 12
- HPD complaints
- 113
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts at 201, vacate # 227454, effectove date 04/10/2023, date posted and mailed 04/07/2023 in the entire apartment located at apt, 2nd story, 2nd apartment from south at west
Apr 7, 2023
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective fire door in the entrance located at apt 301, 3rd story, 2nd apartment from south at west
Apr 3, 2023 · Apt 301
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective fire door, at bulkhead to roof.
Apr 3, 2023
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 201, 2nd story, 2nd apartment from south at west
Apr 3, 2023 · Apt 201
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 25, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 301, 3rd story, 2nd apartment from south at west
Nov 25, 2021 · Apt 301
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of consisting of household items at public hall stairs, 1st story
Sep 14, 2021
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 102, 1st story, 1st apartment from north at east
Jun 10, 2019 · Apt 102
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west and east walls in the 1st room from north at east located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed
Show 23 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from north at west located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - BHazardous
Properly repair the broken or defective spring balance lower sash north window in the 1st room from north at west located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - BHazardous
Properly repair the broken or defective spring balance lower sash north window in the 1st room from north at east located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west and east walls in the bathroom located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 102, 1st story, 1st apartment from north at east
Mar 27, 2019 · Apt 102
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of mice located at apt 107, 2nd story, 1st apartment from north at east
Feb 2, 2019 · Apt 107
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the 1st room from north located at apt 107, 1st story, apartment at east
Jan 28, 2019 · Apt 107
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at north located at apt 407, 4th story, apartment at east
Nov 10, 2018 · Apt 407
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from east at north located at apt 407, 4th story, apartment at east
Nov 10, 2018 · Apt 407
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 407, 4th story, apartment at east
Nov 10, 2018 · Apt 407
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperative located at apt 407, 4th story, apartment at east
Nov 10, 2018 · Apt 407
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum allowable operating temperature of 130 f (found 140 f). thermometer #3482. in the entire apartment located at apt 201, 2nd story
Dec 10, 2017 · Apt 201
Closed — Violation closed - ANon-hazardous
Refit the door in the entrance located at apt 208, 2nd story, 1st apartment from south at west
Nov 9, 2017 · Apt 208
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling, north & west walls in the bathroom located at apt 208, 2nd story, 1st apartment from south at west
Nov 9, 2017 · Apt 208
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 208, 2nd story, 1st apartment from south at west
Nov 9, 2017 · Apt 208
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector deffective in the entire apartment located at apt 102, 1st story
Mar 8, 2014 · Apt 102
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). ... in the entire apartment located at apt 102, 1st story
Mar 8, 2014 · Apt 102
Closed — Violation dismissed
DOB building violations · 25
- Construction other optional
Boro commissioner has issued a swo for #q00487459-il due to intent to revoke approval and permit.
Jan 29, 2026
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - dismissed - Construction other optional
Notice of order to stop work immediately due to applicant suspended, application job # q00487459-i1. the percentage of work is 0% completed. (unable to gain access)
Aug 15, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
Show 15 more ↓
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Construction other optional
C-construction other optional
May 9, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
May 9, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
May 9, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
May 9, 2002
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
May 9, 2002
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
May 9, 2002
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Dec 13, 1983
Dob violation - dismissed
ECB violations · 12
- Class - 2
Failure to conduct or file a final inspection of permitted work with the department. atoi observed renovation to pizzeria store has been completed. they are open and operable. permit #00999118-i1-gc, expired on
Aug 5, 2025 · Penalty $1,530
Resolve - Class - 2
//bc 3314.4.5.4//at the time of my inspection i observed mohammed ullah using/working on chook suspended scaffold uppon request to see scaffold training certificate/card-32 hour suspended scaffold training cert
Apr 19, 2024 · Penalty $2,500
Resolve - Class - 1
//bc 3314.1//chook scaffold installed in unsafe manner//observed chooks with no 3 points of support on parapet wall(1-moved to side),lifelines attached to railings,tieback in angles,no protection for lifelines/
Apr 19, 2024 · Penalty $5,000
Resolve - Class - 2
At the time of my inspection uppon asking foreman for pre/post installation letters,daily maintenance log book(1sheet provided from 3/1/24),parapet wall stability report for parapet clamps installed , design dr
Apr 19, 2024 · Penalty $1,250
Resolve - Class - 2
At the time of my inspection of active facade restoration job site observed sidewalk shed installed in conjunction with facade work-uppon asking foreman for sidewalk shed drawings,daily maintenance log book,ins
Apr 19, 2024 · Penalty $1,250
Resolve - Class - 2
//1rcny-1041-20(k)//certificate of fitness//-at the time of inspection observed mohammed ullah and walter andrade using/working on suspended scaffold -uppon asking them for certificates of fitness -none were pr
Apr 19, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner.atoi observed facade@exp1 deteriorated allowing water to enter.damage facade open to weather conditions.repair &or replace
Dec 8, 2022
Resolve - Class - 2
Work w/o a permit. noted: at front side of 80-45 kew gardens rd awningwhich reads "the chicken house" size of awjning approx 3'by 30'feet by3feet wide, remedy: obtain all required permits.
Aug 14, 2017 · Penalty $800
Resolve - Class - 2
Work does not conform to approved const documents/amendments. for alt 2 401718566 plan dated 5/1/04. noted: (1) cellar entrance found below working cabinet headroom approx 2 1/2' & at one stage head room of sta
Jan 15, 2010 · Penalty $2,500
Active - Non-hazardous
Work without a permit.noted;installed approx.100 feet of plastic signage across the front at 2nd fl.facade installed elen flags(approx 3.0 above parapet)remedy;obtain permit or restore premises to prior condit
Mar 30, 2005
Resolve
Show 2 more ↓
- Hazardous
Plumbing work with out a permit remedy:obtain a permnit if feasible orrestore to prior legal condition
Jun 29, 2004 · Penalty $800
Resolve - Non-hazardous
Emergency lighting is inoperative or defective in various locations through out. remedy: repair and make emergency lighting operable through out.
Mar 3, 1991 · Penalty $400
Resolve
Complaints
- Safety
Fire escape
Mar 5, 2025 · Apt B6
Close - Unsanitary condition
Pests
Mar 5, 2025 · Apt B6
Close - Unsanitary condition
Pests
Mar 5, 2025 · Apt B6
Close - Heat/hot water
Entire building
Mar 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2022 · Apt 301
Close - Heat/hot water
Entire building
Dec 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2021 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 19, 2021 · Apt 301
Close - Unsanitary condition
Garbage/recycling storage
Sep 7, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 29, 2020 · Apt 401
Close - Heat/hot water
Entire building
Dec 26, 2020 · Apt 302
Close - Heat/hot water
Entire building
Nov 24, 2020 · Apt 401
Close - Heat/hot water
Entire building
Jan 14, 2020 · Apt 401
Close - Heat/hot water
Entire building
Jan 8, 2020 · Apt 303
Close - Heat/hot water
Entire building
Dec 17, 2019 · Apt 408
Close - Heat/hot water
Apartment only
Dec 10, 2019 · Apt 107
Close - Heat/hot water
Entire building
Nov 21, 2019 · Apt 107
Close - Heat/hot water
Apartment only
Nov 20, 2019 · Apt 107
Close - Heat/hot water
Apartment only
Nov 8, 2019 · Apt 301
Close - Paint/plaster
Window/frame
Nov 8, 2019 · Apt 301
Close - Heat/hot water
Entire building
Nov 6, 2019 · Apt 107
Close - Heat/hot water
Entire building
Oct 30, 2019 · Apt 407
Close - Flooring/stairs
Floor
Mar 21, 2019 · Apt 102
Close - Plumbing
Radiator
Mar 21, 2019 · Apt 102
Close - Heat/hot water
Apartment only
Mar 21, 2019 · Apt 102
Close - Heat/hot water
Apartment only
Feb 16, 2019 · Apt 102
Close - Heat/hot water
Apartment only
Feb 15, 2019 · Apt 102
Close - Heat/hot water
Entire building
Feb 11, 2019 · Apt 203
Close - Heat/hot water
Apartment only
Jan 31, 2019 · Apt 107
Close - Heat/hot water
Apartment only
Jan 24, 2019 · Apt 107
Close - Heat/hot water
Apartment only
Jan 19, 2019 · Apt 107
Close - Heat/hot water
Apartment only
Jan 3, 2019 · Apt 301
Close - Heat/hot water
Apartment only
Jan 2, 2019 · Apt 107
Close - Heat/hot water
Apartment only
Dec 15, 2018 · Apt 107
Close - Heat/hot water
Entire building
Dec 4, 2018 · Apt 301
Close - Heat/hot water
Apartment only
Nov 30, 2018 · Apt 107
Close - Heat/hot water
Entire building
Nov 23, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2018 · Apt 303
Close - Heat/hot water
Entire building
Nov 18, 2018 · Apt 201
Close - Heat/hot water
Entire building
Nov 8, 2018 · Apt 407
Close - Heat/hot water
Entire building
Feb 3, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 9, 2017 · Apt 107
Close - Heat/hot water
Entire building
Dec 7, 2017 · Apt 201
Close - Heat/hot water
Entire building
Nov 26, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt 402
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1923
- Floors
- 5
- Residential units
- 32
- Building area
- 52,011 ft²
- Lot area
- 23,000 ft²
- Zoning
- C4-4
- Community board
- 409
- Council district
- 29
- Block / lot
- 3358 / 1
- Assessed value
- $3,393,450
- Landmark / historic district
- No
HPD registration #400969, last renewed Nov 7, 2025.
Questions about 120-10 Queens Boulevard
Who owns 120-10 Queens Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is The Home Savings Bank.
Does 120-10 Queens Boulevard have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 120-10 Queens Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 120-10 Queens Boulevard built?
City records list 1923 as the year it was built.
How many apartments are in 120-10 Queens Boulevard?
It has 32 residential units and 43 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.