109-19 72 Road
Queens, NY 11375BBL 4-03258-7502Map
Owner of record: Unavailable Owner
109-19 72 Road is a condominium built in 2017 in Queens, 11375. It has 46 residential units across 7 floors. The owner of record is Unavailable Owner. HPD has recorded 25 housing violations here, most recently on June 11, 2025. 8 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 74
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7e, 7th story, 3rd apartment from south at west
Jun 11, 2025 · Apt 7E
Open — Invalid certification - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jun 11, 2025
Open — Invalid certification - CImmediately hazardous
Remove the illegal fastening consisting of thumbturn key operated lock installed at east bulkhead door to roof at public hall, 7th story
Jun 11, 2025
Open — Invalid certification - CImmediately hazardous
Remove the illegal fastening consisting of thumbturn key operated lock installed at west bulkhead door to roof at public hall, 7th story
Jun 11, 2025
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at east bulkhead door to roof at public hall, 7th story
Jun 11, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at west bulkhead door to roof at public hall, 7th story
Jun 11, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall near fire stairs exit b at public hall, 1st story
Jun 11, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall near fire stairs exit b at public hall, 1st story
Jun 11, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak north wall near fire stairs exit b at public hall, 1st story
Jun 11, 2025
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kickdown door stopper installed at door leading to parking garage at cellar
Jun 11, 2025
Closed — Violation closed
Show 15 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to first fire stairs from west leading to cellar at north wall (labeled stair b) at public hall, 1st story
May 12, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to first fire stairs leading to cellar at west wall (labeled stair a) at public hall, 1st story
May 12, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7e, 7th story, 3rd apartment from west at north
Sep 17, 2024 · Apt 7E
Open — Invalid certification - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 25, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 25, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 25, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 25, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 25, 2023
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 6d, 6th story, 4th apartment from north at east
Apr 21, 2022 · Apt 6D
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 6d, 6th story, 4th apartment from north at east
Apr 21, 2022 · Apt 6D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 2e, 2nd story, 1st apartment from west at north
Oct 23, 2019 · Apt 2E
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 23, 2019
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Oct 23, 2019
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 23, 2019
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 23, 2019
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
May 11, 2025 · Apt 7A
Close - Heat/hot water
Entire building
May 11, 2025 · Apt BLDG
Close - Plumbing
Water supply
May 11, 2025 · Apt BLDG
Close - Plumbing
Water supply
Sep 16, 2024 · Apt 7E
Close - Plumbing
Water supply
Sep 16, 2024 · Apt 7E
Close - Heat/hot water
Entire building
May 24, 2023 · Apt 2H
Close - Heat/hot water
Entire building
May 24, 2023 · Apt 3H
Close - Heat/hot water
Entire building
May 24, 2023 · Apt 2H
Close - Water leak
Slow leak
Sep 12, 2022 · Apt 6D
Close - Water leak
Slow leak
Sep 6, 2022 · Apt 6D
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Apr 19, 2022 · Apt 6D
Close - Water leak
Slow leak
Apr 19, 2022 · Apt 6D
Close - Heat/hot water
Apartment only
Feb 4, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 29, 2022 · Apt 2B
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 29, 2020 · Apt 7A
Close - Unsanitary condition
Garbage/recycling storage
Dec 18, 2019 · Apt 2E
Close - Unsanitary condition
Garbage/recycling storage
Nov 1, 2019 · Apt 2E
Close - Paint/plaster
Wall
Oct 12, 2019 · Apt 2E
Close - Unsanitary condition
Pests
Oct 12, 2019 · Apt 2E
Close - Heat/hot water
Entire building
Oct 18, 2015 · Apt 3F
Close - Plumbing
Water supply
Dec 23, 2013 · Apt 2R
Close - Heating
Heat related
Dec 22, 2013 · Apt 2R
Close - Appliance
Refrigerator
Dec 16, 2013 · Apt 2R
Close - Appliance
Electric/gas range
Dec 16, 2013 · Apt 2R
Close - Electric
Wiring
Dec 16, 2013 · Apt 2R
Close - General
Windows
Dec 16, 2013 · Apt 2R
Close - General
Locks
Dec 16, 2013 · Apt 2R
Close - General
Mailbox
Dec 16, 2013 · Apt 2R
Close - Plumbing
Water-leaks
Dec 16, 2013 · Apt 2R
Close - Paint/plaster
Ceiling
Dec 16, 2013 · Apt 2R
Close - Paint/plaster
Wall
Dec 16, 2013 · Apt 2R
Close - Nonconst
Vermin
Dec 16, 2013 · Apt 2R
Close - Nonconst
Vermin
Dec 16, 2013 · Apt 2R
Close - Nonconst
Vermin
Dec 16, 2013 · Apt 2R
Close - Nonconst
Vermin
Sep 4, 2013 · Apt 5R4
Close - Nonconst
Vermin
Oct 18, 2012 · Apt 3F4
Close - General
Floor
Oct 18, 2012 · Apt 3F4
Close - General
Floor
Oct 3, 2012 · Apt 3F
Close - Paint/plaster
Wall
Oct 3, 2012 · Apt 3F
Close - Nonconst
Vermin
Oct 3, 2012 · Apt 3F
Close - Plumbing
Water-leaks
May 22, 2012 · Apt 3F
Close - Nonconst
Smoke detector
May 22, 2012 · Apt 3F
Close - Nonconst
Carbon monoxide
May 22, 2012 · Apt 3F
Close - Nonconst
Rubbish
May 22, 2012 · Apt 3F
Close - General
Mold
May 22, 2012 · Apt 3F
Close - Plumbing
Water supply
May 22, 2012 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2017
- Floors
- 7
- Residential units
- 46
- Building area
- 57,231 ft²
- Lot area
- 13,000 ft²
- Zoning
- C4-4A
- Community board
- 406
- Council district
- 29
- Block / lot
- 3258 / 7502
- Assessed value
- $5,462,104
- Landmark / historic district
- No
HPD registration #433462, last renewed Sep 2, 2025.
Questions about 109-19 72 Road
Who owns 109-19 72 Road?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 109-19 72 Road have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 109-19 72 Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 109-19 72 Road built?
City records list 2017 as the year it was built.
How many apartments are in 109-19 72 Road?
It has 46 residential units and 71 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.