79-00 Queens Boulevard
Queens, NY 11373BBL 4-02453-0040Map
Owner of record: 7900 Development LLC
79-00 Queens Boulevard is a hotel built in 1963 in Queens, 11373. It has 215 residential units across 7 floors. The owner of record is 7900 Development LLC. HPD has recorded 54 housing violations here, most recently on May 7, 2026. 6 of the 50 most recent violations are still open.
- HPD violations
- 54
- DOB violations
- 67
- ECB violations
- 102
- HPD complaints
- 281
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 54
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from north located at apt br 336, 3rd story, 10th apartment from east at south
Apr 22, 2026 · Apt BR 336
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the kitchenette located at b-room 504, 5th story, 5th b-room from east at south
Mar 7, 2026 · Apt 504
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 618, 6th story, 12th apartment from north at east
Jan 5, 2026 · Apt 618
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 605, 7th story, 4th apartment from east at south
Oct 26, 2025 · Apt 605
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Oct 26, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchenette located at b-room 625, 6th story, 5th b-room from west at north , section ''620-637''
Oct 13, 2025 · Apt 625
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north located at b-room 625, 7th story, 4th b-room from west at north
Jan 6, 2025 · Apt 625
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north located at b-room 629, 7th story, 1st b-room from west at north
Jan 6, 2025 · Apt 629
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Oct 25, 2024 · Apt 525
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchenette located at b-room 320, 3rd story, 10th b-room from north at east
Oct 14, 2024 · Apt 320
Closed — Violation closed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Aug 1, 2022 · Apt 531
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water of 150 degrees; exceeding the maximum allowable temperature of 130 degrees in the entire apartment located at apt 619, 6th story, 11th apartment from west at north
Jul 18, 2022 · Apt 619
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at bath tub in the bathroom located at apt 134, 1st story, 11th apartment from north at east
Feb 18, 2022 · Apt 134
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 627, 7th story, 3rd apartment from west at north
Jan 29, 2021 · Apt 627
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 627, 7th story, 3rd apartment from west at north
Jan 29, 2021 · Apt 627
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 328, 3rd story, 2nd apartment from west at north , section ''west''
Dec 6, 2019 · Apt 328
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated locks installed at east & west doors of the building front entrance.
Jul 2, 2019
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water in the kitchen and in the bathroom located at apt 118, 1st story, 4th apartment from west at north
Nov 20, 2017 · Apt 118
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 604, 6th story, 4th apartment from east at south , section at east
Nov 20, 2016 · Apt 604
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at b-room 517, 3rd b-room from west at north
Jan 20, 2016 · Apt 517
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window lower counter balances near elevator bank at public hall, 7th story
Jan 20, 2016
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at b-room 614, 6th b-room from west at north
Jan 20, 2016 · Apt 614
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at b-room 222, 3rd story, 8th b-room from west at north , section at northwest
Jan 20, 2016 · Apt 222
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at b-room 127, 2nd story, 3rd b-room from west at north , section at northwest
Jan 20, 2016 · Apt 127
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at b-room 123, 2nd story, 7th b-room from west at north , section at northwest
Jan 20, 2016 · Apt 123
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at b-room 120, 2nd story, 10th b-room from west at north , section at northwest
Jan 20, 2016 · Apt 120
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the bathroom located at b-room 607, 6th b-room from west at north
Jan 20, 2016 · Apt 607
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective lower sash window counter balance in the room located at b-room 634, 7th story, 4th b-room from east at south , section at west
Jan 20, 2016 · Apt 634
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at b-room 636, 7th story, 2nd b-room from east at south , section at west
Jan 20, 2016 · Apt 636
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective reglaze bathtub in the bathroom located at b-room 532, 6th story, 6th b-room from east at south , section at west
Jan 20, 2016 · Apt 532
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective reglaze bathtub in the bathroom located at b-room 432, 5th story, 6th b-room from east at south , section at west
Jan 20, 2016 · Apt 432
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective reglaze bathtub in the bathroom located at b-room 436, 5th story, 2nd b-room from east at south , section at west
Jan 20, 2016 · Apt 436
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in bathtub in the bathroom located at b-room 332, 4th story, 6th b-room from east at south , section at west
Jan 20, 2016 · Apt 332
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective at entrance located at b-room 622, 7th story, 8th b-room from west at north , section at northwest
Jan 20, 2016 · Apt 622
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at b-room 625, 7th story, 5th b-room from west at north , section at northwest
Jan 20, 2016 · Apt 625
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at b-room 129, 2nd story, 1st b-room from west at north , section at northwest
Jan 20, 2016 · Apt 129
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in bathtub in the bathroom located at b-room 617, 3rd b-room from west at north
Jan 20, 2016 · Apt 617
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic wall tiles at north wall around bathtub in the bathroom located at b-room 237, 3rd story, 1st b-room from east at south , section at west
Jan 20, 2016 · Apt 237
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at b-room 324, 4th story, b-room at north , section at northwest
Jan 20, 2016 · Apt 324
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at b-room 133, 2nd story, 6th b-room from east at south , section at west
Jan 20, 2016 · Apt 133
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east, located at b-room 504, 5th story, 5th b-room from east at south
May 6, 2015 · Apt 504
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of double cylinder lock at front entrance door from street at 1 sty at public hall
May 4, 2015
Closed — Violation closed - CImmediately hazardous
Remove all obstructions from water closet ... in the bathroom located at apt 235, 2nd story, 1st apartment from east at south
Apr 30, 2015 · Apt 235
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 505, 5th story, 3rd apartment from west at north
Mar 10, 2015 · Apt 505
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 505, 5th story, 3rd apartment from west at north
Mar 10, 2015 · Apt 505
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures located at b-room 504, 6th story, 5th b-room from west at north
Dec 4, 2014 · Apt 504
Closed — Violation closed
DOB building violations · 67
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 30, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2018
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2018
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2015
Oct 25, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Oct 16, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 14, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 19, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jun 30, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jun 30, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 29, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 29, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 29, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2011
Dob violation - resolved
ECB violations · 102
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for 39185884l., file a certificate of correction
Oct 5, 2026 · Penalty $1,250
Active - Class - 1
Observed at time of inspection 2 boilers not working due to cracked heat tubes. tenants have no hot water or heat. per bc 28-301.1 failure to maintain building in code-compliant manner., repair and/replace
Apr 23, 2026 · Penalty $12,500
Active - Class - 1
Found federal model fst150 oil fired boiler ceased used due to hazardous condition. (combustion chamber full of water) do not operate boiler until all hazardous conditions are immediately corrected and dob is n
Feb 9, 2026 · Penalty $2,530
Active - Class - 1
Class 1 cease use item: door zone restrictor inoperative. this is a safety feature which ensures passenger safety. remedy: to restore service, email the d.o.b. [email protected]. for a reinspection.
Dec 9, 2025 · Penalty $1,250
Resolve - Class - 2
Observed fire department connection lacking clearances, inadequate sprinkler coverage through the building, unprotected standpipe threads and improper installed sprinkler heads 4th floor. vent terminals is not
Dec 5, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code compliant manner. at time of inspection i observed no sprinkler protection in individual rooms and on the hallways. sprinkler system is required by 903.2.8 of nyc bc, repair
Aug 27, 2025
Resolve - Class - 1
The only elevator in building (or section of building) out of service. upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy: restore to service imm
Jul 22, 2025 · Penalty $1,250
Resolve - Class - 1
The only elevator in building (or section of building) out of service. upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy: restore to service imm
Jul 22, 2025 · Penalty $1,250
Resolve - Class - 1
The only elevator in building (or section of building) out of service. upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy: restore to service imm
Jul 22, 2025 · Penalty $6,250
Resolve - Class - 1
The only elevator in building (or section of building) out of service. upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy: restore to service imm
Jul 21, 2025 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 1
The only elevator in building (or section of building) out of service. upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy: restore to service imm
Jul 21, 2025 · Penalty $6,250
Resolve - Class - 1
The only elevator in building (or section of building) out of service. upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy: restore to service imm
Jul 21, 2025 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the only device in the section of the building is found to be out of service, creatin
Jul 2, 2025 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the only device in the section of the building is found to be out of service, creatin
Jul 2, 2025 · Penalty $3,125
Resolve - Class - 2
Failure to submit certificate of correction for violation # 39139514r, file a certificate of correction
Jun 11, 2025 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner. upon inspection, the device in a family shelter, with 216 dwelling units and 600 - 700 residents at any given time, is found to be out of service. remedy:
Apr 2, 2025 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner. upon inspection, the device in a family shelter, with 216 dwelling units and 600 - 700 residents at any given time, is found to be out of service. remedy:
Apr 2, 2025 · Penalty $1,250
Active - Class - 2
Unlawful acts: failure to comply with commissioner's order as stated in ecb# 39072210y issued on 10/18/2022 and correct violating conditions and submit a corrected certificate of correction. photos taken., file
Feb 25, 2025
Resolve - Class - 2
I observed two 400 amp disconnects in the main electrical room improperly bonded beyond the service disconnect switches 1 and 2. as per ec there shall be no bonding nor grounding beyond the load side of the mai
Feb 25, 2025 · Penalty $2,000
Resolve - Class - 2
I observed the improper crossing of line and load in the elevator switch . the passing of line and load conductors through the same raceway negates the fuse protection. photos taken., provide protection against
Feb 25, 2025 · Penalty $2,400
Resolve - Class - 2
I observed in the elevator motor room the use of the disconnect switch as a raceway to supply power to a circuit breaker enclosure. the feeder for the enclosure shall not pass through the switch, but have its i
Feb 25, 2025 · Penalty $2,000
Resolve - Class - 2
I observed in the elevator motor room the failure to support the conduit from the disconnect to the elevator control panel. photos taken., properly secure/support emt; support raceways as required.
Feb 25, 2025 · Penalty $500
Resolve - Class - 2
Unlawful acts: failure to comply with commissioner's order as stated in ecb #39072209r issued on 10/18/2022 and correct the violating conditions and file a certificate of correction. photos taken, file a certif
Feb 25, 2025
Resolve - Class - 2
Unlawful acts failure to comply with commissioner's order as stated in ecb# 39072207n issued on 10/18/2022 and correct the violating conditions. photos taken., file a certificate of correction; submit a correct
Feb 25, 2025
Resolve - Class - 1
Unlawful acts: failure to comply with commissioner's order as stated in ecb# 39072206l issued on 10/18/2022 and correct the violating conditions and submit a correct c of c. photos taken., comply with commissio
Feb 25, 2025
Resolve - Class - 2
Class 2 items: in-car communication inoperative. top of car lighting inoperative. replace car door retainers (gibs) adjust steady plates andreduce excessive movement. repair oil leak on hoist machine and clean
Feb 25, 2025 · Penalty $655
Resolve - Class - 2
Class 2 items: in-car communication inoperative. top of car lighting inoperative. replace car door retainers. (gibs)
Feb 25, 2025 · Penalty $655
Resolve - Class - 2
Class 2 item: failure to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service.
Feb 25, 2025 · Penalty $625
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations throughout building in the servers room on each floor,
Feb 25, 2025 · Penalty $2,500
Resolve - Class - 2
Exit door not self-closing. observed non self closing doors throughout building. potential fire hazard., repair/replace door
Feb 25, 2025 · Penalty $625
Active - Class - 1
I observed in the common halls the failure to provide gfci outlets as required by ll39/2015 for outlets below 44" accessible to children. photos taken.; ll39/2015, comply with ec code; provide/ maintain tamper
Feb 25, 2025 · Penalty $4,000
Resolve - Class - 1
I observed in the in the common halls convenience receptacles not of the tamper type or tamper resistant as required in areas accessible to children. as per ll 39 and nec 406.12 photos taken; 406.12, comply wit
Oct 18, 2022 · Penalty $1,600
Resolve - Class - 1
Observed newly installed gas piping to three new water heaters that are located in the boiler room that is in the basement/cellar. no permits were found on file at the department of buildings., obtain permit
Oct 18, 2022 · Penalty $2,500
Resolve - Class - 2
I observed in the main electrical room the bonding of two 400 amp disconnect switches after service switches 1 & 2. no bonding or grounding is permitted after the load side of the main disconnects. photos taken
Oct 18, 2022 · Penalty $400
Resolve - Class - 2
I observed in the boiler and elevator machine rooms conduits not supported as required. photos taken, properly secure/support emt
Oct 18, 2022
Resolve - Class - 2
I observed in the elevator motor room the use of the motor disconnects to pass branch circuit wiring not terminated by the operation of the switch all circuitry passing through the switch must be controlled by
Oct 18, 2022
Resolve - Class - 2
I observed in the elevator, boiler and main electrical room convenience receptacles not of the gfci type or gfci protected. this necessary for the protection of property and personnel. photos taken, install gfc
Oct 18, 2022 · Penalty $1,200
Resolve - Class - 2
At first floor, main entrance, metal shed with loose, lost, detached parts throughout the access area to the building, repair and/or replace
May 31, 2022
Resolve - Class - 1
I observed in the hallways convenience receptacles not of the tamper resistant/proof type as required where accessible to children. this is an immediate shock hazard., comply with ec; install tamper resistant r
May 31, 2022 · Penalty $1,600
Resolve - Class - 2
Barometric damper not working,soot on burner & boiler,missing vent liminator clean out door not closing,correct violation & send in certificate of correction
Feb 9, 2022
Resolve - Class - 2
Missing cover for low water cut off,missing vent liminator,soot on boiler & burner correct violation & send in certificate of correction
Feb 9, 2022
Resolve - Class - 2
Glass missing in rear of boiler to sight fire and oil leak at compressor
Feb 11, 2021
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application install dlm and perfor
Sep 22, 2020 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application install dlm and perfor
Sep 22, 2020 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application install dlm and perfor
Sep 22, 2020 · Penalty $1,250
Resolve - Class - 2
Found 1 federal fst 150 oil fired hot water bioler. 1- missing thermal spill switch. 2- defective sail switch at combustion air fan. correct all violating conditions and submit a certificate of correction.
Feb 25, 2020 · Penalty $312
Resolve - Class - 2
Found 1 federal fst 150 oil fired hot water boiler. 1- missing thermal spill switch. 2- unused opening in chimney. correct all violating conditions and submit a certificate of correction.
Feb 25, 2020 · Penalty $625
Resolve - Class - 2
I observed in front stair b and room #129, an exit light that is being fed with hardwired flexible extension cord, violating section 400.8 in the national electrical code. flexible cords can not be used as a pe
Feb 13, 2020 · Penalty $400
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35434213j issued on 07/01/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failed to file a certific
Sep 30, 2019 · Penalty $1,280
Resolve - Class - 2
Work w/o a permit. observed in cellar violating condition outlined in summons#35415209n for plumbing union fitting illegally installed on gas piping because of its location corrected & removed w/o a permit bein
Jul 1, 2019
Resolve
Complaints
- Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Jul 7, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 19, 2026 · Apt 231
Close - Heat/hot water
Entire building
May 11, 2026 · Apt 312
Close - Heat/hot water
Entire building
May 9, 2026 · Apt 231
Close - Heat/hot water
Entire building
May 8, 2026 · Apt 231
Close - Heat/hot water
Entire building
Apr 28, 2026 · Apt 328
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt 336
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt 200
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2026 · Apt 231
Close - Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt THE WH
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 25, 2026 · Apt 504
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt 504
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 320
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 319
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 102
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 516
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 105
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt 615
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 231
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 231
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2026 · Apt 516
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H9)
- Year built
- 1963
- Floors
- 7
- Residential units
- 215
- Building area
- 88,000 ft²
- Lot area
- 46,000 ft²
- Zoning
- C4-2
- Community board
- 404
- Council district
- 30
- Block / lot
- 2453 / 40
- Assessed value
- $10,727,100
- Landmark / historic district
- No
HPD registration #420396, last renewed Oct 11, 2025.
Questions about 79-00 Queens Boulevard
Who owns 79-00 Queens Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 7900 Development LLC.
Does 79-00 Queens Boulevard have violations?
Yes. NYC HPD has recorded 54 housing violations at this property.
Is 79-00 Queens Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 79-00 Queens Boulevard built?
City records list 1963 as the year it was built.
How many apartments are in 79-00 Queens Boulevard?
It has 215 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.