roofy

51-28 48 Street

Queens, NY 11377BBL 4-02305-0039Map

Owner of record: Begum, Momtaz

51-28 48 Street is a two-family home built in 1930 in Queens, 11377. It has 2 residential units across 2 floors. The owner of record is Begum, Momtaz. HPD has recorded 21 housing violations here, most recently on November 29, 2023. 1 of the 21 most recent violations are still open.

HPD violations
21
DOB violations
0
ECB violations
0
HPD complaints
8

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 29, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 21

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2023

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door frame from north at east wall, 1st door frame from south at west wall, north wall, south wall, east wall in the 2nd room from east located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the foyer located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, 1st closet from north at east wall door frame, 1st door frame from north at east wall in the 4th room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Open — Nov certified late
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • B

    Replace with new the missing washbasin in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd room from east located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
Show 11 more ↓
  • C

    Abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees (f) at all fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department .. ceiling, 1st window frame from east at south wall in the 2nd room from east located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department .. south wall in the foyer located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department .. ceiling, north wall, east wall, south wall, west wall, 1st closet from north at east wall door, 1st closet from north at east wall wall in the 4th room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department .. ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall in the 1st room from east located at apt 1stflo, 1st story, 1st apartment from south at west

    Nov 20, 2022 · Apt 1STFLO

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2022

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cylinder key operated lock at front entrance door to building

    Feb 4, 2012

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at south wall at 1 story public hall vestibule.

    Feb 4, 2012

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Dec 22, 2022 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2022 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 17, 2022 · Apt 1STFLO

    Close
  • Unsanitary condition

    Pests

    Nov 17, 2022 · Apt 1STFLO

    Close
  • Unsanitary condition

    Pests

    Nov 17, 2022 · Apt 1STFLO

    Close
  • Electric

    Electric-supply

    Jan 14, 2012 · Apt 1ST

    Close
  • Heating

    Heat related

    Jan 14, 2012 · Apt 1ST

    Close
  • Heating

    Heat related

    Dec 28, 2011 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B1)
Year built
1930
Floors
2
Residential units
2
Building area
1,649 ft²
Lot area
1,900 ft²
Zoning
R4
Community board
402
Council district
26
Block / lot
2305 / 39
Assessed value
$54,480
Landmark / historic district
No

HPD registration #924760, last renewed Jan 27, 2024.

Questions about 51-28 48 Street

Who owns 51-28 48 Street?

The owner of record in NYC Department of City Planning PLUTO data is Begum, Momtaz.

Does 51-28 48 Street have violations?

Yes. NYC HPD has recorded 21 housing violations at this property.

Is 51-28 48 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 51-28 48 Street built?

City records list 1930 as the year it was built.

How many apartments are in 51-28 48 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.