65-35 108 Street
Queens, NY 11375BBL 4-02173-0001Map
Owner of record: 108 St Forest Hills Corp
65-35 108 Street is an elevator apartment building built in 1950 in Queens, 11375. It has 84 residential units across 6 floors. The owner of record is 108 St Forest Hills Corp. HPD has recorded 258 housing violations here, most recently on February 18, 2026. 30 of the 50 most recent violations are still open.
- HPD violations
- 258
- DOB violations
- 62
- ECB violations
- 13
- HPD complaints
- 516
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 258
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt b10, 2nd story, 1st apartment from west at north
Feb 18, 2026 · Apt B10
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt b10, 2nd story, 1st apartment from west at north
Feb 18, 2026 · Apt B10
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt b10, 2nd story, 1st apartment from west at north
Feb 18, 2026 · Apt B10
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt b10, 2nd story, 1st apartment from west at north
Feb 18, 2026 · Apt B10
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt b10, 2nd story, 1st apartment from west at north
Feb 18, 2026 · Apt B10
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective latch set at apartment entrance door in the entrance located at apt b10, 2nd story, 1st apartment from west at north
Feb 18, 2026 · Apt B10
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt b10, 2nd story, 1st apartment from west at north
Dec 2, 2025 · Apt B10
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt b10, 2nd story, 1st apartment from west at north
Dec 2, 2025 · Apt B10
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 1st story
May 4, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door at north wall leading to stair b at public hall, 6th story
May 4, 2025
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system near mailbox at public hall, 1st story
May 4, 2025
Open — Nov certified late - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door at north wall leading to fire stairs at public hall, 1st story
May 4, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at door at compactor closet, 1st story
May 4, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at fire door at north wall leading to stair b at public hall, 6th story
May 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 6th story
May 4, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 4, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 4, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at door at compactor closet, 6th story
May 4, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt c11, 3rd story
Sep 24, 2024 · Apt C11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt c11, 3rd story
Sep 24, 2024 · Apt C11
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt c11, 3rd story
Sep 24, 2024 · Apt C11
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door to fire stairs at public hall, 1st story
Sep 24, 2024
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximate 4 sq.ft at ceiling and south wall in the bathroom located at apt c11, 3rd story, 1st apartment from south at west
Jul 25, 2023 · Apt C11
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt c11, 3rd story, 1st apartment from south at west
Jul 25, 2023 · Apt C11
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash sink in the bathroom located at apt c11, 3rd story, 1st apartment from south at west
Jul 25, 2023 · Apt C11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 2nd room from east located at apt c11, 3rd story, 1st apartment from south at west
Jul 25, 2023 · Apt C11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt c11, 3rd story, 1st apartment from south at west
Jul 25, 2023 · Apt C11
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximate 4 sq.ft at ceiling and south wall in the bathroom located at apt c11, 3rd story, 1st apartment from south at west original violation 16117764 issued 25-jul-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 25, 2023 · Apt C11
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... at compactor closet, 1st story
May 30, 2023
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Aug 18, 2022
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 18, 2022
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes rug on 2 story balcony at north stack at building front
Jul 27, 2022
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door
Jul 27, 2022
Closed — Violation closed - ANon-hazardous
Refit building entrance door
Jul 27, 2022
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing door stopper at bottom of building entrance door
Jul 27, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c11, 3rd story, 1st apartment from south at west
Jul 17, 2021 · Apt C11
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the kitchen located at apt c11, 3rd story, 1st apartment from south at west
Jul 17, 2021 · Apt C11
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in sink in the kitchen located at apt c11, 3rd story, 1st apartment from south at west
Jul 17, 2021 · Apt C11
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt a1, 1st story, 1st apartment from west at north
Mar 23, 2021 · Apt A1
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt a1, 1st story, 1st apartment from west at north
Mar 23, 2021 · Apt A1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall and all wood trimwork in the 2nd room from east at north located at apt c11, 3rd story, 3rd apartment from east at south
Mar 10, 2020 · Apt C11
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak window frame and east wall in the 2nd room from east at north located at apt c11, 3rd story, 2nd apartment from south at west
Mar 10, 2020 · Apt C11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the bathroom located at apt c11, 3rd story, 2nd apartment from south at west
Mar 10, 2020 · Apt C11
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic files at floor in the kitchen located at apt c11, 3rd story, 2nd apartment from south at west
Mar 10, 2020 · Apt C11
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches at cellar
Apr 5, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 5, 2018
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 5, 2018
Open — Nov sent out
DOB building violations · 62
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2017
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 4, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jul 13, 2015
Dob violation - dismissed
Show 40 more ↓
- Facade safety program facade required
Fisp-facade safety program facade required
Jul 13, 2015
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years
Jun 1, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 1, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2004
Dob violation - resolved - Elevator elevatorrequired
4p2046
Aug 2, 2000
Dob violation - resolved - Elevator elevatorrequired
4p2045
Aug 2, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 13
- Class - 2
Spill switch missing,gas line to burner to be hard piped,missing switch at door to outside for boiler & water htr correct violations & send certificate of correction
Nov 16, 2021 · Penalty $625
Resolve - Class - 2
Boiler is over 8 feet missing ladder & platform missing remote switch by door from outside for boiler & water htr,missing vent liminator,correct violations &send certificate of correction
Nov 16, 2021 · Penalty $1,562
Resolve - Class - 1
Repair emergency stop switch
Mar 11, 2021 · Penalty $1,250
Resolve - Class - 3
2x10,42d6,56m7. (2x)phone inoperative, repair. (42d)wiring on controller unsecured. provide wire not on spliced wires. (56m)provide cable guard on machine.
Dec 26, 2017 · Penalty $230
Resolve - Class - 2
05x10,52k11,70o02,06m07. 05x10-repair door zone lock; 52k11-rusted hoist ropes replace; 70o02,06m07-missing one regular door gib.
Oct 28, 2015
Resolve - Class - 1
Failure to provide safety measures such as sidewalk sheds,fence etc toprotect public from unsafe conditions as per 1rcny 103-04 & as per notification of unsafe conditions complaint #4624726 by ra/pe dated 7-10-
Aug 6, 2015 · Penalty $2,400
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Jan 26, 2015 · Penalty $400
Resolve - Class - 3
Failure to maintain building walls or appurtenances. noted: at south side of premises bottom of ramp outside garage door drainage grille loose & uneven due to deteriorated concrete. remedy: maintain building.
Aug 24, 2009 · Penalty $500
Resolve - Non-hazardous
49 -no relief valve on tankless coil water line.
Jan 22, 2001
Resolve - Non-hazardous
49 -relief valve on tankless coil water line plugged.
Jan 22, 2001
Resolve
Show 3 more ↓
- Non-hazardous
15l,57o,73o.
Jul 10, 1996
Resolve - Non-hazardous
28h,09m.#28-eliminate excessive side movement in car #09 provide two gibs.
Jul 27, 1995
Resolve - Non-hazardous
09m.#09-provide two gibs.
Jul 27, 1995
Resolve
Complaints
- Water leak
Damp spot
Dec 12, 2025 · Apt B10
Close - Unsanitary condition
Mold
Dec 12, 2025 · Apt B10
Close - Water leak
Slow leak
Nov 28, 2025 · Apt B10
Close - Unsanitary condition
Garbage/recycling storage
Oct 30, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
May 4, 2025 · Apt UNKNOW
Close - Heat/hot water
Entire building
May 4, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 20, 2024 · Apt C11
Close - Plumbing
Water supply
Oct 12, 2023 · Apt B7
Close - Water leak
Damp spot
Jul 21, 2023 · Apt C11
Close - Plumbing
Water supply
Jun 21, 2023 · Apt F5
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Apr 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2023 · Apt BLDG
Close - Plumbing
Water supply
Dec 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2022 · Apt 11A
Close - Heat/hot water
Entire building
Oct 13, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2022 · Apt A15
Close - Heat/hot water
Entire building
Oct 2, 2022 · Apt D3
Close - Heat/hot water
Entire building
Oct 2, 2022 · Apt D3
Close - Heat/hot water
Entire building
Aug 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 9, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 20, 2022 · Apt B5
Close - Heat/hot water
Entire building
Apr 26, 2022 · Apt BLDG
Close - General
Signage missing
Mar 9, 2022 · Apt BLDG
Close - Plumbing
Water supply
Mar 9, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 12, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 12, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 12, 2021 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 14, 2021 · Apt C11
Close - Unsanitary condition
Pests
Jul 14, 2021 · Apt C11
Close - Heat/hot water
Entire building
Jun 11, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 9, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 5, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 20, 2021 · Apt A1
Close - Heat/hot water
Entire building
Feb 24, 2021 · Apt E5
Close - Plumbing
Water supply
Feb 24, 2021 · Apt E5
Close - Plumbing
Water supply
Feb 24, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 22, 2021 · Apt F5
Close - Heat/hot water
Entire building
Jan 22, 2021 · Apt F5
Close - Heat/hot water
Apartment only
Jan 18, 2021 · Apt A1
Close - Heat/hot water
Entire building
Jan 11, 2021 · Apt F5
Close - Heat/hot water
Entire building
Jan 11, 2021 · Apt BLDG
Close - Water leak
Damp spot
Mar 4, 2020 · Apt C11
Close - Paint/plaster
Wall
Mar 4, 2020 · Apt C11
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 20, 2026 | $290,000 | Coops - elevator apartments | — |
| Feb 24, 2026 | $270,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1950
- Floors
- 6
- Residential units
- 84
- Building area
- 78,001 ft²
- Lot area
- 28,000 ft²
- Zoning
- R6A
- Community board
- 406
- Council district
- 29
- Block / lot
- 2173 / 1
- Assessed value
- $4,600,800
- Landmark / historic district
- No
HPD registration #405491, last renewed Jul 23, 2026.
Questions about 65-35 108 Street
Who owns 65-35 108 Street?
The owner of record in NYC Department of City Planning PLUTO data is 108 St Forest Hills Corp.
Does 65-35 108 Street have violations?
Yes. NYC HPD has recorded 258 housing violations at this property.
Is 65-35 108 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 65-35 108 Street built?
City records list 1950 as the year it was built.
How many apartments are in 65-35 108 Street?
It has 84 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.