108-10 50 Avenue
Queens, NY 11368BBL 4-02006-0001Map
Owner of record: Chen, Hang
108-10 50 Avenue is a walk-up apartment building built in 2018 in Queens, 11368. It has 3 residential units across 4 floors. The owner of record is Chen, Hang. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 5
- ECB violations
- 29
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 5
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 27, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 27, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 14, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 25, 2017
Vp*-violation unserved ecb- dismissed
ECB violations · 29
- Class - 2
Job site not maintained pursuant to subsection.@ time of inspection i observed a jobsite fence @ exp#1,2 & 4 of the building with the following conditions:-nails portuding out of fence @ exp#2 in multiple place
Dec 15, 2018
Resolve - Class - 2
Bc 3303.4.1 sidewalk not maintained.@time of inspection i observed theside walk @ exp#1 of the building with the following conditons:-broken-cracked -uneven.these condiotns create a tripping hazard for pedestri
Dec 15, 2018 · Penalty $625
Resolve - Class - 2
Bc3301.7 failure to provide pe approved design drawings. as noted: at time of inspection at an active construction site. observed floor #3, rear side approx. (12'-0" x 13'-0") wood joint temporary platform. fai
Aug 21, 2018
Resolve - Class - 1
Sec. 3301.2 overhead protection. at time of inspection observed activejob site. overhead protection was not provided at exp#4 adjacent property 4 sty new bldg 4 fl level under construction. failure to protect
Jul 9, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety measure at job site. guardrails. at time of inspection observed active job site. the guardrails system along the permiter edge of the bldg on the 4th fl level has not mainta
Jul 9, 2018 · Penalty $2,500
Resolve - Class - 1
Sidewalk shed where required note:@the time of my insp of a 4 story bldg @the 4th fl level w/wall erected @this fl contracting work in progress.i observed that there were no sidewalk shed inplace @exp#1 as requ
May 24, 2018 · Penalty $10,000
Resolve - Class - 1
Bc 3301.2 failure to maintain/institute safety measures-fall protection note:@the time of my insp of active jobsite,i observed four workers doing masonry work @the 4th level, @the edge of the bldg @ exp#3 @a he
May 24, 2018 · Penalty $2,500
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. at thetime of inspection it was observed that owner had installed rakers an waters at exp#1 & 4 while on a notice of a stop work order full meanin
Jan 19, 2018 · Penalty $12,000
Resolve - Class - 1
Unsafe storage of combustible material & equipment. @the time of insp it was observed on a active const site contractor cutting the rebar w/chainsaw next to (5) gallon gasoline plastic container.observed metal
Oct 3, 2017
Resolve - Class - 1
Bc 3304.4.4 failure to provide 3 foot 6 inch guardrail or solid enclosure around open & accessible sides of excavation.@the time of insp observed an active const site of approx 8ft deep w/out any guardrail syst
Oct 3, 2017
Resolve
Show 19 more ↓
- Class - 1
Missing rebar cap @the time of insp it was observed an active const site contractor working inside excavated area of approx 8ft deep working on rebar installation w/out any rebar caps in place preventing worke
Oct 3, 2017
Resolve - Class - 1
Failure to notify dob w/in 24-48 hrs of the insp observed an active const site w/soe support of excavation installed w/out obtaining dob notification conformation #.contractor failed to call prior to (commencem
Oct 3, 2017
Resolve - Class - 1
Bc 3304.7 failure to provide adequate means of exit from excavation.@the time of insp it was observed an active const site w/out a ladder installed from excavated area for the nb foundation wall. workers were w
Oct 3, 2017
Resolve - Class - 1
Work does not conform to approved const docs & approved docs.@the time of insp it was observed an active const site where contractor did notwork according to plan missing raker (and) (waler) @exp#4 to support e
Oct 3, 2017
Resolve - Class - 1
Failure to provide pedestrian protection for sidewalks & walkways.@thetime of insp it was observed on a active site that the sidewalk in front of jobsite @exp#1.#1 was damaged due to work that was being done in
Oct 3, 2017
Resolve - Class - 1
Bc 3307.7 failure to provide an adequate const fence. inadequates noted:@the time of insp it was observed on active const site the const fence was opening outside causing hazardous condition to passing public p
Oct 3, 2017
Resolve - Class - 2
Bc 3308.6 failure to monitor (adjointing) structures for movement in all direction during excavation related activity that may adversely affect (adjoining) structures.@the time of insp observed an active const
Oct 3, 2017
Resolve - Class - 2
Bc 3307.7 failure to provide an adequate const fence.inadequacies noted.@the time of insp it was observed on active const site the const fence was not opening inside causing hazardous condition to passing publi
Oct 3, 2017 · Penalty $800
Resolve - Class - 2
Bc 3309.6 failure to monitor (adjoining) structures for movement in all directions during excavation related activity that may adversely affect (adjoning) structures.@the time of wwhere monitoring reports for f
Oct 3, 2017 · Penalty $800
Resolve - Class - 1
Missing rebar cap..@the time of insp it was observed that on active const site contractor working inside excavated area of approx 8ft deep working on rebar installation w/out any rebar caps in place preventing
Oct 3, 2017 · Penalty $2,400
Resolve - Class - 1
Const superintendent failed to perform (outies) as per rule.@the time of insp it was observed on a active site where contractor was working there was no super @site,no logbook @site showing he was ever here.und
Oct 3, 2017 · Penalty $12,500
Resolve - Class - 1
Work does not conform to approved construction documents and approved documents.at the time of inspection it was observe an active construction site where contractor did not work according to plan missing raker
Oct 3, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to notify dob within 24-48 hrs of the start of excavtion.at the time of inspction observed an active construction site with soe support of excavtion installed without obtaining dob notification excavati
Oct 3, 2017 · Penalty $1,200
Resolve - Class - 1
Bc3304.7/failrue to provide adequate means of exit from excavation.at the time of inspection it was observed an active construction site withou a ladder installed from excavated area for the new building founda
Oct 3, 2017 · Penalty $1,600
Resolve - Class - 1
Unsafe storage of combustible material and equipment.at the time of inspection it was observed on an active construction site contractor cutting he rebar wire iwh a chainsaw next to a 5 gallon of gasoline
Oct 3, 2017 · Penalty $2,400
Resolve - Class - 1
Bc3304.4.4/failure to provide 3 foot 6 inch guardrail or solid enclosure around open and accessible sidew of excavation.at the time of inspection it was observed an active construction site of approx.8ft deep w
Oct 3, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to provide pedestrian protection for sidewalks and walkways.atthe time of inspection it was observed on a active site that the sidewalk in front of jobsite at expo#1 was damaged due to work that was bei
Oct 3, 2017 · Penalty $800
Resolve - Class - 1
Failure to maintain sidewalk noted:i observed sidewalk to be cracked,has holes and missing an entire flag of concrete in front of job site,creatng a severe tripping and falling hazard for pedestrians and worker
Mar 25, 2017 · Penalty $1,600
Resolve - Class - 2
Job site fence not constructed to code:no fence viewing panels.noted at time of inspection,i observed that the jobsite fence did not have viewing panels.remedy:conform fence to code.
Mar 25, 2017 · Penalty $800
Resolve
Complaints
- Heat/hot water
Apartment only
Mar 30, 2023 · Apt 4
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2018
- Floors
- 4
- Residential units
- 3
- Building area
- 3,252 ft²
- Lot area
- 1,500 ft²
- Zoning
- R6B
- Community board
- 404
- Council district
- 21
- Block / lot
- 2006 / 1
- Assessed value
- $112,020
- Landmark / historic district
- No
Questions about 108-10 50 Avenue
Who owns 108-10 50 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Chen, Hang.
Does 108-10 50 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 108-10 50 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 108-10 50 Avenue built?
City records list 2018 as the year it was built.
How many apartments are in 108-10 50 Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.