104-31 43 Avenue
Queens, NY 11368BBL 4-01986-0167Map
Owner of record: Ziasmin Rahman
104-31 43 Avenue is a walk-up apartment building built in 1965 in Queens, 11368. It has 3 residential units across 3 floors. The owner of record is Ziasmin Rahman. HPD has recorded 53 housing violations here, most recently on May 6, 2026. 29 of the 50 most recent violations are still open.
- HPD violations
- 53
- DOB violations
- 1
- ECB violations
- 3
- HPD complaints
- 33
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 53
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective entrance door in the bathroom located at apt 3rdfl, 3rd story, 1st apartment from north at east
Jul 30, 2024 · Apt 3RDFL
Open — Certification postponment denied - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling in the bathroom located at apt 3rdfl, 3rd story, 1st apartment from north at east
Jul 30, 2024 · Apt 3RDFL
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3rdfl, 3rd story, 1st apartment from north at east
Jul 30, 2024 · Apt 3RDFL
Open — Certification postponment denied - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3rdfl, 3rd story, 1st apartment from north at east
Jul 30, 2024 · Apt 3RDFL
Open — Certification postponment denied - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3rdfl, 3rd story, 1st apartment from north at east
Jul 30, 2024 · Apt 3RDFL
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective porcelain enamel at bathtub in the bathroom located at apt 3rdfl, 3rd story, 1st apartment from north at east
Jul 30, 2024 · Apt 3RDFL
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north and west wall in the bathroom located at apt 3rdfl, 3rd story, 1st apartment from north at east
Jul 30, 2024 · Apt 3RDFL
Open — Certification postponment denied - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Jul 30, 2024
Open — Certification postponment denied
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 3, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 14, 2021
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq. ft at ceiling in the bathroom located at apt 3rdflr, 3rd story, apartment at east original violation 14050939 issued 02-mar-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 2, 2021 · Apt 3RDFLR
Open — First no access to re- inspect violation - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Mar 2, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 2, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Mar 2, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box, 1st story
Mar 2, 2021
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system, 1st story
Mar 2, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Mar 2, 2021
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 1st story
Mar 2, 2021
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq. ft at ceiling in the bathroom located at apt 3rdflr, 3rd story, apartment at east
Mar 2, 2021 · Apt 3RDFLR
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3rdflr, 3rd story, apartment at east
Mar 2, 2021 · Apt 3RDFLR
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors building entrance , 1st story
Mar 2, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Dec 22, 2020
Open — Certification postponment denied - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor
Dec 22, 2020
Open — Certification postponment denied - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Dec 22, 2020
Open — Certification postponment denied - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box
Dec 22, 2020
Open — Certification postponment denied - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3rdflo, 3rd story, apartment at east
Dec 22, 2020 · Apt 3RDFLO
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 22, 2020
Open — Certification postponment denied - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 22, 2020
Open — Certification postponment denied - BHazardous
Remove all encumbrances consisting of house hold items on 3 story public hall
Dec 22, 2020
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors entrance located at apt 3rdflo, 3rd story, apartment at east
Dec 22, 2020 · Apt 3RDFLO
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3rdflo, 3rd story, apartment at east
Dec 22, 2020 · Apt 3RDFLO
Open — Notice of issuance sent to tenant - BHazardous
Properly secure the loose wash basin in the bathroom located at apt 3rdflo, 3rd story, apartment at east
Dec 22, 2020 · Apt 3RDFLO
Open — Not complied with - BHazardous
Remove all obstructions and repair all defects in clogged wash basin in the bathroom located at apt 3rdflo, 3rd story, apartment at east
Dec 22, 2020 · Apt 3RDFLO
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 3rdflo, 3rd story, apartment at east
Dec 22, 2020 · Apt 3RDFLO
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3rdflo, 3rd story, apartment at east
Dec 22, 2020 · Apt 3RDFLO
Open — Not complied with - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3rdflo, 3rd story, apartment at east
Dec 22, 2020 · Apt 3RDFLO
Open — Not complied with - CImmediately hazardous
Arrange and make self-closing the doors building entrance
Dec 22, 2020
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 23, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 1, 2017
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hasp & staple at scuttle cover at public hall, 3rd story
Jan 16, 2011
Open — Nov certified late - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the 3rd room from north at east located at apt 3f, 3rd story, 1st apartment from north at east
Apr 26, 2006 · Apt 3F
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the 1st room from north at west located at apt 3f, 3rd story, 1st apartment from north at east
Apr 26, 2006 · Apt 3F
Open — Certification postponment granted - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at basement at lobby, basement
Aug 4, 2000
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible at baseement at lobby, basement
Aug 4, 2000
Open — Nov sent out
DOB building violations · 1
- Construction other optional
C-construction other optional
Nov 17, 2000
Vw*-violation - work w/o permit dismissed
ECB violations · 3
- Non-hazardous
Residence altered for occupancy as adwelling for more than the legally approved # of fa. c of o#185301 indicates residence legally approved for occupancy by 2 fa.reidence now altered for occupancy by 3 fa. alt
Nov 17, 2000 · Penalty $1,800
Resolve - Hazardous
Occupancy contrary to that allowed by cofo#185301.illegal occupancy noted: legal 2 fa. converted to an illegal 3 fa. dwelling. note: at 1st fl rec room & part of garage converted to class a apt. w/ ktchn & gas
Nov 17, 2000
Resolve - Hazardous
Work without permit. work noted: at cellar level partition erected creating rooms, gas line in wall uncapped & residential sink. also stand up shower & plumbing lines & drain (pvc) in wall. installed withoutper
Nov 17, 2000
Resolve
Complaints
- Flooring/stairs
Stairs
Oct 11, 2025 · Apt 3RDFLO
Close - Electric
Power outage
Oct 11, 2025 · Apt 3RDFLO
Close - Heat/hot water
Apartment only
Oct 11, 2025 · Apt 3RDFLO
Close - Unsanitary condition
Sewage
Jul 26, 2024 · Apt 3RDFL
Close - Door/window
Door
Jul 26, 2024 · Apt 3RDFL
Close - Unsanitary condition
Mold
Jul 26, 2024 · Apt 3RDFL
Close - Unsanitary condition
Pests
Dec 21, 2020 · Apt 3RDFLO
Close - Plumbing
Basin/sink
Dec 21, 2020 · Apt 3RDFLO
Close - Paint/plaster
Ceiling
Dec 21, 2020 · Apt 3RDFLO
Close - Plumbing
Basin/sink
Dec 1, 2020 · Apt 3RDFLO
Close
Show 23 more ↓
- Heat/hot water
Apartment only
Dec 1, 2020 · Apt 3RDFLO
Close - Unsanitary condition
Pests
Dec 1, 2020 · Apt 3RDFLO
Close - Paint/plaster
Ceiling
Dec 1, 2020 · Apt 3RDFLO
Close - Heating
Heat related
Jan 12, 2011 · Apt 3FL
Close - Paint/plaster
Ceiling
May 23, 2006 · Apt 3F
Close - Paint/plaster
Wall
May 23, 2006 · Apt 3F
Close - Paint/plaster
Ceiling
May 23, 2006 · Apt 3F
Close - Plumbing
Radiator
Apr 26, 2006 · Apt 3F
Close - Electric
Wiring
Apr 26, 2006 · Apt 3F
Close - Nonconst
Vermin
Apr 26, 2006 · Apt 3F
Close - Plumbing
Bathtub/shower
Apr 26, 2006 · Apt 3F
Close - Paint/plaster
Ceiling
Apr 26, 2006 · Apt 3F
Close - General
Floor
Apr 26, 2006 · Apt 3F
Close - Plumbing
Water-leaks
Apr 26, 2006 · Apt 3F
Close - Plumbing
Water-leaks
Apr 26, 2006 · Apt 3F
Close - Nonconst
Vermin
Apr 26, 2006 · Apt 3F
Close - Nonconst
Vermin
Apr 26, 2006 · Apt 3F
Close - Plumbing
Bathtub/shower
Apr 26, 2006 · Apt 3F
Close - General
Ceramic-tile
Apr 26, 2006 · Apt 3F
Close - Paint/plaster
Ceiling
Apr 23, 2006 · Apt 3F
Close - Heating
Heat related
Apr 5, 2006 · Apt 3F
Close - Heating
Heat related
Mar 21, 2006 · Apt 3F
Close - Heating
Heat related
Mar 19, 2006 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1965
- Floors
- 3
- Residential units
- 3
- Building area
- 3,363 ft²
- Lot area
- 1,967 ft²
- Zoning
- R5
- Community board
- 404
- Council district
- 21
- Block / lot
- 1986 / 167
- Assessed value
- $81,720
- Landmark / historic district
- No
HPD registration #426891, last renewed Oct 27, 2025.
Questions about 104-31 43 Avenue
Who owns 104-31 43 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Ziasmin Rahman.
Does 104-31 43 Avenue have violations?
Yes. NYC HPD has recorded 53 housing violations at this property.
Is 104-31 43 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 104-31 43 Avenue built?
City records list 1965 as the year it was built.
How many apartments are in 104-31 43 Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.