roofy

56-09 Van Cleef Street

Queens, NY 11368BBL 4-01968-0076Map

Owner of record: Van Cleef Group, LLC

56-09 Van Cleef Street is a walk-up apartment building built in 1989 in Queens, 11368. It has 6 residential units across 3 floors. The owner of record is Van Cleef Group, LLC. HPD has recorded 18 housing violations here, most recently on September 6, 2019.

HPD violations
18
DOB violations
0
ECB violations
0
HPD complaints
30

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Sep 6, 2019

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 18

  • B

    Properly repair the broken or defective bell-buzzer/intercom system in the foyer located at apt 3f, 3rd story, 1st apartment from north at east

    Sep 6, 2019 · Apt 3F

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story

    Aug 20, 2019

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Aug 20, 2019

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 20, 2019

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story

    Aug 20, 2019

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 20, 2019

    Closed — Violation dismissed
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination .... at public hall, 2nd story

    Aug 20, 2019

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cylinder lock at exterior metal door, front entrance to building. , 1st story

    Aug 20, 2019

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st living room from east located at apt 3f, 3rd story, 1st apartment from west at north

    Aug 20, 2019 · Apt 3F

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak at ceiling in the 1st living room from east located at apt 3f, 3rd story, 1st apartment from west at north

    Aug 20, 2019 · Apt 3F

    Closed — Violation dismissed
Show 8 more ↓
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north

    Aug 20, 2019 · Apt 3F

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north

    Aug 20, 2019 · Apt 3F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north

    Aug 20, 2019 · Apt 3F

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective ventilation system at ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from west at north

    Aug 20, 2019 · Apt 3F

    Closed — Violation dismissed
  • A

    Properly secure the loose ceramic towel bar in the bathroom located at apt 3f, 3rd story, 1st apartment from west at north

    Aug 20, 2019 · Apt 3F

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 3f, 3rd story, 1st apartment from west at north

    Aug 20, 2019 · Apt 3F

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at stove range in the kitchen located at apt 2f, 2nd story, apartment at south

    Feb 27, 2014 · Apt 2F

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2f, 2nd story, apartment at south

    Feb 27, 2014 · Apt 2F

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Pests

    Aug 22, 2024 · Apt 3F

    Close
  • Flooring/stairs

    Floor

    Aug 22, 2024 · Apt 3F

    Close
  • Plumbing

    Toilet

    Aug 22, 2024 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2024 · Apt 3F

    Close
  • Plumbing

    Water supply

    Sep 27, 2022 · Apt 3F

    Close
  • Plumbing

    Toilet

    Sep 24, 2022 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Sep 24, 2022 · Apt 3F

    Close
  • Plumbing

    Bathtub/shower

    Sep 24, 2022 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Sep 24, 2022 · Apt 3F

    Close
  • Door/window

    Window frame

    Feb 28, 2022 · Apt 2

    Close
Show 20 more ↓
  • Plumbing

    Basin/sink

    Sep 3, 2019 · Apt 3F

    Close
  • General

    Ventilation system

    Sep 3, 2019 · Apt 3F

    Close
  • General

    Bell/buzzer/intercom

    Sep 3, 2019 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Sep 3, 2019 · Apt 3F

    Close
  • Water leak

    Slow leak

    Sep 3, 2019 · Apt 3F

    Close
  • Unsanitary condition

    Mold

    Aug 14, 2019 · Apt 3F

    Close
  • Water leak

    Slow leak

    Aug 14, 2019 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2019 · Apt 3F

    Close
  • Electric

    No lighting

    Feb 10, 2018 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2016 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Feb 26, 2014 · Apt 2F

    Close
  • Heating

    Heat related

    Feb 26, 2014 · Apt 2F

    Close
  • Nonconst

    Vermin

    Feb 15, 2014 · Apt 2F

    Close
  • Nonconst

    Vermin

    Feb 15, 2014 · Apt 2F

    Close
  • Nonconst

    Vermin

    Feb 15, 2014 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Feb 15, 2014 · Apt 2F

    Close
  • General

    Windows

    Feb 15, 2014 · Apt 2F

    Close
  • Heating

    Heat related

    Feb 15, 2014 · Apt 2F

    Close
  • Heating

    Heat related

    Feb 15, 2014 · Apt 2F

    Close
  • Heating

    Heat related

    Feb 7, 2014 · Apt 2F

    Close

Sales history

DatePriceTypeUnits
Jun 12, 2026$1,192,500Rentals - walkup apartments6

Building details

Building type
Walk-up apartment building (C2)
Year built
1989
Floors
3
Residential units
6
Building area
4,600 ft²
Lot area
2,500 ft²
Zoning
R6B
Community board
404
Council district
21
Block / lot
1968 / 76
Assessed value
$508,050
Landmark / historic district
No

HPD registration #424429, last renewed Aug 25, 2025.

Questions about 56-09 Van Cleef Street

Who owns 56-09 Van Cleef Street?

The owner of record in NYC Department of City Planning PLUTO data is Van Cleef Group, LLC.

Does 56-09 Van Cleef Street have violations?

Yes. NYC HPD has recorded 18 housing violations at this property.

Is 56-09 Van Cleef Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 56-09 Van Cleef Street built?

City records list 1989 as the year it was built.

How many apartments are in 56-09 Van Cleef Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.