92-19 54 Avenue
Queens, NY 11373BBL 4-01869-0050Map
Owner of record: Bairagi, Suves C
92-19 54 Avenue is a walk-up apartment building built in 1920 in Queens, 11373. It has 3 residential units across 2 floors. The owner of record is Bairagi, Suves C. HPD has recorded 35 housing violations here, most recently on May 6, 2026. 2 of the 35 most recent violations are still open.
- HPD violations
- 35
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 10
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door knob at entrance door leading to fire escape window in the 1st room from north located at apt 2, 2nd story, 1st apartment from south at west
Jul 18, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2, 2nd story, 1st apartment from south at west
Jul 18, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story
Jul 18, 2023
Open — Violation will be reinspected - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Jul 18, 2023
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling ceiling in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
May 25, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 25, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 3;missing window stops and one way screws in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 25, 2023 · Apt 2
Closed — Violation closed
Show 25 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
May 25, 2023 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
May 25, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
May 25, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlets at west walls in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
May 25, 2023 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
May 25, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 25, 2023 · Apt 2
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , south wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Feb 25, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Feb 25, 2023 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Feb 25, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Feb 25, 2023 · Apt 2
Open — Violation will be reinspected - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Feb 25, 2023 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 3rd room from north located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall, ceiling in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the kitchen , the 1st room from north at east, the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from south at west
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 3, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 14, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 14, 2021
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Heavy flow
Jul 30, 2023 · Apt 2NDFLO
Close - Water leak
Heavy flow
Apr 21, 2023 · Apt 2
Close - Electric
Lighting
Apr 21, 2023 · Apt 2
Close - Electric
No lighting
Apr 21, 2023 · Apt 2
Close - Water leak
Heavy flow
Feb 22, 2023 · Apt 2
Close - Water leak
Heavy flow
Sep 16, 2022 · Apt 2
Close - Safety
Smoke detector
Sep 16, 2022 · Apt 2
Close - Paint/plaster
Wall
Sep 16, 2022 · Apt 2
Close - Safety
Carbon monoxide detector
Sep 16, 2022 · Apt 2
Close - Nonconst
Vermin
Sep 3, 2005 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2
- Residential units
- 3
- Building area
- 1,755 ft²
- Lot area
- 2,500 ft²
- Zoning
- R4
- Community board
- 404
- Council district
- 25
- Block / lot
- 1869 / 50
- Assessed value
- $77,100
- Landmark / historic district
- No
HPD registration #416759, last renewed Aug 24, 2025.
Questions about 92-19 54 Avenue
Who owns 92-19 54 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bairagi, Suves C.
Does 92-19 54 Avenue have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 92-19 54 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 92-19 54 Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 92-19 54 Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.