Roosevelt Avenue is an office building built in 2020 in Queens, 11368. The owner of record is Make The Road New Yor. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 3
- ECB violations
- 44
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 30, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 30, 2020
Dob violation - dismissed
ECB violations · 44
- Class - 2
Observed suspended c-hook scaffold at exp#2- fully installed and connected. upon request for the following documents, none were provided: design drwing/plan showing location of c-hooks, platform, tie-back point
Aug 5, 2024 · Penalty $1,250
Resolve - Class - 2
Bc 3314.1 scaffolds. unsafe rigging- observed suspended c-hook scaffold at exp#2-fully installed and connected- with the left/inner c-hook tie-back installed at an angle / not perpendicular to the wall, with n
Aug 5, 2024 · Penalty $2,500
Resolve - Class - 2
Observed a sidewalk shed utilized as overhead protection at the adj property rear yard at exp#2 with a large amount of loose debris/garbage, and materials including styrofoam, planks, and metal framing scattere
Aug 5, 2024 · Penalty $1,250
Resolve - Class - 2
Obsvd suspended c-hook scaffold at exp#2.- fully installed and connected. upon initial review of dob records, no notification for c-hooks was found- notification was made by rigger later that same day- at 9:39
Aug 5, 2024 · Penalty $2,500
Resolve - Class - 2
Upon inspection i observed a sidewalk shed installed at exposure 1 contrary to code. no red-light provided on shed extension for adjoining property location of fdny connection (sprinkler system) contrary to cod
Sep 26, 2023 · Penalty $2,400
Resolve - Class - 2
At time of inspection observed pedestrian protection not maintained, plastic/yodock barriers are not filled with sand, water or equivalent, connected to each other or attached to the ground to prevent movement
Jun 8, 2023 · Penalty $2,400
Resolve - Class - 2
At inspection,it was observed supported scaffold at exp.3 connected with angular work platforms on all levels contrary to approved drawing.a section at the lower level was placed on a-frame ladder and not fully
Apr 19, 2023
Resolve - Class - 1
At time of inspection on an active jobsite of 2 story jobsite.upon doing further research on bis, showed that the disability&worker's compensation has expired on (9-30-2022). this is an active jobsite with appr
Oct 4, 2022 · Penalty $625
Resolve - Class - 1
Active jobsite on raining day with unfinished exterior work, it was observed power lines partially protected resting/ laying on sidewalk shed deck and parapet. sidewalk shed purpose to protect pedestrians. powe
Oct 4, 2022 · Penalty $2,400
Resolve - Class - 1
The construction superintendent failed to perform inspections and correct unsafe conditions as required per code. allowed work to take place while worker's compenstation and disability are expire 9-30-2022. pow
Oct 4, 2022 · Penalty $2,500
Resolve
Show 34 more ↓
- Class - 2
Failure to safe guard all persons and property affected by construction operations. at time of inspection observed sidewalk closed routing pedestrians into street where wood ramp with metal mesh for transitioni
Sep 3, 2022 · Penalty $5,000
Resolve - Class - 2
Bc3301.13.1 inadequate site safety plan(ssp).at time of inspection on an active jobsite observed tht ssp does not indicate the pipe scaffoldapprox. 35 ft in height {fitted}at rear & at exp.#4 on top the sidewal
May 12, 2022
Resolve - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection.at time of inspection on a 3 story nb jobsite i observed construction fence installed at exp.1-construction fence not maintained to code due to
Apr 30, 2022
Resolve - Class - 2
Sidewalk shed parapet panel/project info panel.at time of inspection on a 3 story nb jobsite i observed sidewalk shed installed at exp.1 with no parapet panel installed as per bc 3301.9.2.1.1-sidewalk shed para
Apr 30, 2022
Resolve - Class - 1
Permit holder failed to ensure workers receive site safety orientationat time of inspection of 3 story nb,active job site,observed workers performing framing,sheet metal & concrete work.upon request for worker
Feb 16, 2022 · Penalty $625
Resolve - Class - 2
Bc3309.10 protection of roofs.at time of inspection of 3 story nb active job site,observed at exp.#4 adjacent property roof that there is 2 vents/chimny are not protected.there was no overhead protection in pla
Feb 16, 2022 · Penalty $625
Resolve - Class - 1
Bc3301.6.1 no design drawings for overhead protection & pully system. at time of inspection of 3 story nb,active job site,observed overhead protection installed at exp.#2 adjacent roof to protect ac unit.upon
Feb 16, 2022
Resolve - Class - 2
Failure to safeguard all persons & properties during construction.at time of inspection of 3 story nb active site observed pedestrian walkway/pathway not maintained as per code.walkway 5 ft/ramp not maintained
Jan 10, 2022 · Penalty $5,000
Resolve - Class - 2
Pedestrian protection doesn't code compliance at time of my re-inspection,obseved pedestrian walkway not maintained as per code at expos#1,a high volume pedestrian area and the ramp for wheel chair people not m
Jan 3, 2022
Resolve - Class - 2
3301.6 no dd for temp platforms.at the time of my re-inspection 3 story nb active site observed a wood made platform at 3 flr and a ladder in place to go to the bulkhead ladder and platform was open for use upo
Jan 3, 2022
Resolve - Class - 1
Failure to maintain/display onsite documents required by bc chapter 33.at time of inspection observed active construction plumbing draming in progress.asked for documents none were provided-no update daily insp
Dec 21, 2021 · Penalty $625
Resolve - Class - 2
Construction superintendent failed to perform duties per code.at time of inspection observed 3 story building under construction requested construction superintendent or competent person none made available at
Dec 21, 2021 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments-at time of inspection observed suspended scaffold at exp #3 suspended scaffold use of cut frame used to support outrigger beam
Dec 21, 2021 · Penalty $625
Resolve - Class - 1
Bc3314.1 thru bc3314.20 supported scaffold not erected or maintained per code or design drawings at site-permit #800525098-12-sf.at time of inspection observed supported scaffold at exp #3 #4 pin missing on sid
Dec 21, 2021 · Penalty $2,500
Resolve - Class - 1
Work contrary to plan (supp scf (illegible)) atoi of active proposed 3stynb w/aprx20workers onsite i observed supported pipe scf (illegible)in place from cellar to roof level.upon insp i observed secondary towe
Nov 12, 2021 · Penalty $2,500
Resolve - Class - 1
Manufacture spec (material hoist lift) atoi of active proposed 3stynb@roof level w/aprx20workers onsite i observed betamax hoist lift attached to supported pipe scf&stair tower for purpose of hoisting materials
Nov 12, 2021 · Penalty $625
Resolve - Class - 2
Construction superintendent failed to perform duties per code.at time of in inspection on an active jobsite,observed 3 sty at roof level.upon request for site superintendent inspection log observed that there w
Aug 27, 2021 · Penalty $625
Resolve - Class - 1
Work does not conform to approved construction documents/plans and or approved amendments.at time of inspection on an active jobsite,observed 3 story nb at roof level.non-conformity noted:(1)ssp is missing egre
Aug 27, 2021
Resolve - Class - 1
Documents to be kept at site.at time of inspection on an active jobsite,of a 3 story nb currently at roof level observed an approx 50 feet in height stair tower and sidewalk sand installed partially at exp#1.up
Aug 27, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrail netting.at time of inspection on an active jobsite of 3 story nb currently at roof level,observed guardrail netting
Aug 27, 2021 · Penalty $2,500
Resolve - Class - 2
Inadequate drainage-stading water.at time of inspection on an active jobsite,observed 3 standing water,at the 2nd floor court yard at rear.standing water creates a hazot hazard as a breeding ground for mosquito
Aug 27, 2021 · Penalty $625
Resolve - Class - 1
Unsafe storage of combustible material and equipment.at time of inspection on an active jobsite,observed 70 wtbet diesel generator(45 kva nband straral emergency generators in use.upon request for fdny permit w
Aug 27, 2021 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection does not meet code speciifcations noted at the time of my inspection observed the yodocks/jersey water barriers at exposure 1 had several that were not filled at least halfway with water o
Feb 11, 2021 · Penalty $6,000
Resolve - Class - 1
Failure to maintain on-site documents required by chapter 33.at time of inspection of a proposed 3 story new building under construction,i observed bolt raisers and holes in rowers and whackrs.no complete,up-to
Sep 16, 2020 · Penalty $1,250
Resolve - Class - 2
Construction fence no constructed or maintained purusant to subsectionat time of inspection of a proposed 3 story new building under construction,at excavation/foundation level i observed that there were missin
Sep 16, 2020
Resolve - Class - 2
Custruction superintendent failed to perform duties per code.at time of inspection of a proposed 3 story new building work construction active site.upon request for the up-do date construction superintendent's
Sep 16, 2020 · Penalty $2,500
Resolve - Class - 1
Does not conform to approved construction documents approved amendments.at time of inspection of a proposed 3 story new building under construction,at excavation foundation stage,observed the following conditio
Sep 16, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to notify the dept of an accident/incident that resulted in a fatality or an injury. an excavator hit a worker in the head causing the worker to fall and be transported to a hospital by an ambulance. as
Sep 12, 2020
Resolve - Class - 1
Failure to institue & maintain safety equipment measures & temporary construction note @time my inspection responding to compliant of a workers got hit by excavation inspection (reveal) that excavator was being
Jul 2, 2020
Resolve - Class - 1
Failure to comply with manufacturer specification note @time of my inspection responding to compliant of a worker got hit by exterior & excavator operator name christopher michael lucehese upon request for
Jul 2, 2020
Resolve - Class - 2
Pedestrian protection does not meet code specificiatoins.at time of inspection,i observed a pedestrian walkway at exp1 with the following conditions.-yodocs barriers not filled with water/sand at least half way
Feb 3, 2020 · Penalty $2,400
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. at time of inspection of proposed 3 sty jobsite where a construction fence was in place,i observed a project which had an active new bldg per
Sep 5, 2019
Resolve - Class - 2
Viewing panels.at the time of my inspection of a 3 story nb,at crane level ,job not started jobsite fence doors not have viewing panels lot width approx 75 feet and fence is painted brown not hunter green.maint
Feb 20, 2019 · Penalty $800
Resolve - Non-hazardous
Occupancy contrary to certificate of occupancy. c of o #187038 indicates building to be used for factory, office and loading areas. illegal occupancy noted: building now used for whole sale warehouse. remedy:
Jun 20, 2005 · Penalty $800
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O2)
- Year built
- 2020
- Floors
- 3
- Residential units
- —
- Building area
- 24,993 ft²
- Lot area
- 9,171 ft²
- Zoning
- R6B
- Community board
- 403
- Council district
- 21
- Block / lot
- 1776 / 62
- Assessed value
- $2,515,050
- Landmark / historic district
- No
Questions about Roosevelt Avenue
Who owns Roosevelt Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Make The Road New Yor.
Does Roosevelt Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is Roosevelt Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was Roosevelt Avenue built?
City records list 2020 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.