112-02 Northern Boulevard
Queens, NY 11368BBL 4-01727-7501Map
Owner of record: Unavailable Owner
112-02 Northern Boulevard is a condominium built in 2009 in Queens, 11368. It has 33 residential units across 6 floors. The owner of record is Unavailable Owner. HPD has recorded 84 housing violations here, most recently on April 21, 2025. 42 of the 50 most recent violations are still open.
- HPD violations
- 84
- DOB violations
- 11
- ECB violations
- 5
- HPD complaints
- 17
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 84
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch on fire stair exit on south wall (labeled as stair b, 7th floor) at public hall, 6th story
Apr 21, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch on fire stair exit door on south wall (labeled as stair b, 7th floor) at public hall, 6th story
Apr 21, 2025
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling stairway b at public hall stairs, 6th story original violation 17111626 issued 05-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 5, 2024
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective latch at compactor closet, 6th story
Jul 5, 2024
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at bulkhead stairway b , 6th story, section at east
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling stairway b at public hall stairs, 6th story
Jul 5, 2024
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling stairway b at public hall stairs, 6th story
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at bulkhead , 6th story, section at west
Jul 5, 2024
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at bulkhead , 6th story, section at west
Jul 5, 2024
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak west wall at public hall, 1st story
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department west wall at public hall, 1st story
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 1st story
Jul 5, 2024
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening illegal fastening consisting of an unacceptabe electromagnetic locking device installed at street entance door to building , 1st story
Jul 5, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at compactor closet, 2nd story
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling stairway b at public hall stairs, 5th story
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling at stairway b at public hall stairs, 5th story
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at stairway b at public hall stairs, 5th story
Jul 5, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at compactor closet, 5th story
Jul 5, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door latch at compactor closet, 5th story
Jul 5, 2024
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at stairway b at public hall stairs, 6th story
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at stairway b at public hall stairs, 6th story
Jul 5, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material all walls and ceiling at bulkhead stairway b , 6th story, section at east
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at bulkhead stairway b , 6th story, section at east
Jul 5, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective stairway b fire door latch at public hall, 6th story
Jul 5, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective stairway b fire door latch at public hall, 6th story
Jul 5, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 6th story
Jul 5, 2024
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak ceiling at public hall, 6th story
Jul 5, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 6th story
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and north wall at public hall, 6th story
Jul 5, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bulkhead door latch , 6th story, section at west
Jul 5, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bulkhead door latch , 6th story, section at west
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling bulkhead , 6th story, section at west
Jul 5, 2024
Open — Nov sent out - ANon-hazardous
Replace with new the missing outlet safety covers at east and south wall at public hall, 1st story
Jul 5, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 2nd story
Jul 5, 2024
Closed — Violation closed - BHazardous
Provide security in the event of power outage by means of acceptable mechanical heavy duty lock and latch set at street enterance door to public hall, 1st sty at public hall, 1st story
May 17, 2024
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of unacceptable electromagnetic locking device installed at street enterance door to public hall at public hall, 1st story
May 17, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 17, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
May 17, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 17, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 17, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 17, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 17, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 22, 2023
Open — Nov sent out
DOB building violations · 11
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 8, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2015
Dob violation - resolved
Show 1 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2014
Dob violation - resolved
ECB violations · 5
- Class - 2
Work w/o a permit.note: a flex sign installed at front facade of bldg w/o a permit. remedy: obtain a permit or restore to prior legal condi tion.
Oct 24, 2012 · Penalty $800
Resolve - Class - 2
Work w.o permit.expired permit. nb 402504214 has expired as of 5/2/2009. at time of inspection approx 15 men working at above premise under provided application number. stop all work. remedy: renew permit. call
Jun 2, 2009 · Penalty $400
Resolve - Non-hazardous
Work w/o a permit expired permit noted job 402593403-fn on place with expired permit as of 12/31/07 remedy: renew permit
Jan 11, 2008 · Penalty $2,500
Active - Non-hazardous
Work w/o a permit expired permit as noted fully erected plywood construction fence around a excavation site approx. 100'x100' has an expired permit as of 12/31/07 as per appl. 402504214 remedy: renew permit
Jan 3, 2008 · Penalty $500
Resolve - Hazardous
Failed to comply w/safety requirements during bldg operations as per 27-203. defect noted: at time of inspection, 2 workers were cutting steel beams w/a torch w/o burner permits. also noted tanks were not
Dec 18, 2007 · Penalty $1,500
Resolve
Complaints
- Plumbing
Water supply
May 16, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 18, 2023 · Apt 6TH
Close - Water leak
Damp spot
Aug 18, 2023 · Apt 6TH
Close - Safety
Window guard broken/missing
May 28, 2019 · Apt 3A
Close - Safety
Window guard broken/missing
Apr 3, 2019 · Apt 3A
Close - Heat/hot water
Entire building
Jun 8, 2016 · Apt BLDG
Close - General
Cooking gas
Jun 8, 2016 · Apt BLDG
Close - Plumbing
Water supply
Jun 8, 2016 · Apt BLDG
Close - General
Cooking gas
Jun 7, 2016 · Apt 6C
Close - Heat/hot water
Entire building
Jun 7, 2016 · Apt 6C
Close
Show 7 more ↓
- General
Cooking gas
Jun 6, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 4, 2016 · Apt BLDG
Close - General
Cooking gas
Jun 4, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 3, 2016 · Apt PHC
Close - General
Cooking gas
Jun 3, 2016 · Apt PHC
Close - Heat/hot water
Entire building
Jun 3, 2016 · Apt BLDG
Close - General
Cooking gas
Jun 3, 2016 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2009
- Floors
- 6
- Residential units
- 33
- Building area
- 44,694 ft²
- Lot area
- 14,192 ft²
- Zoning
- R6A
- Community board
- 403
- Council district
- 21
- Block / lot
- 1727 / 7501
- Assessed value
- $4,244,402
- Landmark / historic district
- No
HPD registration #431418, last renewed Jul 16, 2025.
Questions about 112-02 Northern Boulevard
Who owns 112-02 Northern Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 112-02 Northern Boulevard have violations?
Yes. NYC HPD has recorded 84 housing violations at this property.
Is 112-02 Northern Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 112-02 Northern Boulevard built?
City records list 2009 as the year it was built.
How many apartments are in 112-02 Northern Boulevard?
It has 33 residential units and 35 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.