40-06 82 Street
Queens, NY 11373BBL 4-01493-0003Map
Owner of record: Roosevelt Avenue Enterprises LLC
40-06 82 Street is a store building built in 1925 in Queens, 11373. It has 4 residential units across 3 floors. The owner of record is Roosevelt Avenue Enterprises LLC. HPD has recorded 321 housing violations here, most recently on July 27, 2026. 1 of the 50 most recent violations are still open.
- HPD violations
- 321
- DOB violations
- 87
- ECB violations
- 97
- HPD complaints
- 215
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 321
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Jul 27, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Replace with new the missing scuttle ladder to roof at public hall, 3rd story
Apr 13, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of sealed shut scuttle hatch opening at ceiling at public hall, 3rd story
Apr 13, 2026
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Apr 13, 2026 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building front at fire escape
Apr 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 2; wg to repair = 0; in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Apr 6, 2026 · Apt 3R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
May 20, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of household items restricting access to window with fire escape located at apt 3r, 3rd story, 1st apartment from east at south
May 20, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of flower pot 2nd story balcony rear stack at fire escape
May 13, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items 3rd story balcony rear stack at fire escape
May 13, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items throughout at roof
May 13, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective coping stone air shaft area at roof
May 13, 2025
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint rear stack at fire escape
May 13, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of chain link fence erected at parapit wall gateway opening resrticting access to rear fire escape at roof
May 13, 2025
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration gas hot water heater replaced with electric hot water heater
May 13, 2025
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration public hall stairs to roof bulkhead installed inside front apartment 3f , 3rd story
May 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges bulkhead to roof , 3rd story
May 13, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of 15th stair tread to landing from bottom not in uniform height at public hall stairs, 2nd story
May 13, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of 18th stair tread to landing from bottom not in uniform height at public hall stairs, 1st story
May 13, 2025
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
May 13, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the 3rd room from north at west located at apt 3r, 3rd story, 1st apartment from east at south
Feb 19, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Feb 19, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3r, 3rd story, 1st apartment from east at south
Feb 19, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story , 1st story
Feb 19, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Feb 19, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 1st apartment from north at east
Feb 11, 2025 · Apt 2F
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 2, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 2, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 2, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2019
Closed — Violation dismissed
DOB building violations · 87
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Corrective action plan req'd.obsvd @ exp2/3 cracked/bulging stucco in the shared courtyard @ exp1 obsvd bulging masonry @ 2fl above the lintel & some deteriorated mortar joints.immed comply w/commissioner's order 348209 & 050125pi404-5sb to provide a corrective action plan repr bldg under permit
Aug 5, 2025
Dob violation - active - Construction other optional
Ftc w/commissioner's order control#348210 vio#050125pi40406sb dated 05/01/25 requiring the owner to submit a corrective action plan w/in 30 days from date of p.i insp as of today 06/27/25 a corrective action plan was not rec'd. immed comply w/commissioner's order control#348210 vio#050125pi40406sb to submit corrective action plan
Jun 27, 2025
Dob violation - active - Construction other optional
Ftc w/commissioner's order control#348208 vio#050125pi40404sb dated 05/01/25 requiring owner to submit a corrective ac tion plan w/in 30 days from dated of p.i insp as of today 06/27/25 a corrective action plan was not rec'd. immed comply w/commissioner's order control#348208 vio#050125pi40404sb to submit corrective action plan
Jun 27, 2025
Dob violation - active - Construction other optional
Ftc w/commissioner's order control#348207 vio#050125pi40403sb dated 05/01/25 requiring owner to submit a corrective action plan w/in 30 days from date of p.i insp. as of today 06/27/25 a corrective action plan was not rec'd. immed comply w/commissioner's order control#348207 vio#050125pi40403sb to submit corrective action plan
Jun 27, 2025
Dob violation - active - Immediate emergency anythingoptional
Remedy: erect construction fence
May 2, 2025
Dob violation - dismissed - Immediate emergency anythingoptional
Remedy: erect construction fence
May 2, 2025
Dob violation - dismissed - Construction other optional
Corrective action plan req'd. obsvd @ exp2/3 cracked/bulging stucco @ shared courtyard. owner to inned retain reg design prof to eval entire bldg & to submit corrective action plan to [email protected] w/in 30 days addressing all conditions w/plans,photos recommending time frame and repairs to be completed
May 1, 2025
Dob violation - active - Construction other optional
Correction action plan req'd obsvd @ exp2/3 cracked/bulging stucco in the shared courtyard.@ exp1 obsvd bulging masonry @ 2fl above lintel & some deteriorated mortar joints. owner to immed retain a reg design prof to eval entire bldg & submit corrective action plan to [email protected] w/in 30 days adressing all conditions
May 1, 2025
Dob violation - active
Show 40 more ↓
- Construction other optional
Correction action plan req'd. obsvd @ exp3 shared courtyard cracked/ bulging stucco. owner to immed retain reg design prof to eval entire bldg&submit correction action plan to [email protected] w/in 30 days addressing all cond w/plans,photos recommending time frame & repairs t/be compl.bldg t/be repaired under permit
May 1, 2025
Dob violation - active - Construction other optional
Correction action plan req'd. obsvd @ exp1 bulging bricks @ the corner of the lintels on 2fl. @ exp2/3 obsvd cracked/bulging stucco in the shared courtyard. owner to immed retain reg design prof to eval the entire bldg & to submit corrective action plan w/in 30 days addressing all cond with plan,photos,recommending time frame & repairs t/be compl
May 1, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 16, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
Owner to hire nyspe to submit report to [email protected] w/in 30 days, addressing all conditions w/plans, photos, recommending time frame and repairs to be completed. tel #718-278-3460
Jan 6, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Construction other optional
Emerg wrk order.bldg is 3st+cell,wood joists/steel framing over solid masonry walls.mid bear walls removed at 2ndfl leav 3rdfl framin improp support&bear wall at 3rdfl discontinous w/o clearload path.remedy:own immed engage prof eng&cont'r eval bldg&prov shor/reinstate strl integ of bear wall.shor wrk filed w/2bus days.stop wrk once shor is complete
Jun 14, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 8, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 26, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Feb 1, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
ECB violations · 97
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39096119j., file a certificate of correction
Aug 3, 2026 · Penalty $1,250
Resolve - Class - 2
Handrail missing post to staircase that going from ground floor to cellar floor, repair and/or replace
Jun 17, 2026 · Penalty $1,250
Active - Class - 2
Work with out a permit creating small room at rear of ground floor and front. at rear 3 room with massage tables and at front 2 small businesses. no permit on record., obtain all permits
Jun 17, 2026 · Penalty $1,250
Active - Class - 2
During inspection of sidewalk shed, dob records revealed that there was no active permit prior to the install of the sidewalk shed which is required prior to the install of construction equipment. obtain and ma
Apr 3, 2026 · Penalty $1,250
Active - Class - 1
Failure to comply with commissioner's order. vio #080525pi40404sb control #34819 dated 8/5/25. no compliance on file for corrective action plan. remedy: comply with commissioner's order.
Nov 21, 2025 · Penalty $6,250
Active - Class - 1
Failure to comply with the commissioner order violation#050125pi40403sb and control#348207,dated 05/01/25.as of today no compliance on file for a correction action plan.rem:comply with commissioners order and/o
Aug 25, 2025 · Penalty $2,500
Active - Class - 1
Failure to comply with commissioners order.violation#050125pi40406sb and control#348210 dated 05/01/25.as of today no compliance on file fora correction action plan.rem:comply with commissioners order and/or fi
Aug 25, 2025 · Penalty $2,500
Active - Class - 1
Failure to comply with commissioner's order violation#050125pi40404sb and control#348208,dated 05/01/25.as of today no compliance on file for a correction action plan.rem:comply with commissioners order and/or
Aug 25, 2025 · Penalty $2,500
Active - Class - 1
Electrical work in cellar level. service/panel upgrade all meters and panes open and wires exposed or being worked on.. service wire connection being worked on from next door, obtain permit
Jun 25, 2025 · Penalty $800
Resolve - Class - 1
Electrical service work on going in cellar level with out permits on file. service being connected to adjacence property (40-10 83rd st), obtain permit
Jun 25, 2025 · Penalty $1,600
Active
Show 40 more ↓
- Class - 2
Failure to certify and submit certificate of correction for violation # 39129364l, file a certificate of correction
Jun 9, 2025
Resolve - Class - 1
Failure to obtain permits and submit certificate of correction for violation # 39121978j, comply with commissioner's order
Jun 9, 2025 · Penalty $2,500
Resolve - Class - 2
Violation #35555656j written for work without a permit on 03/19/2021. no coc found on dob records, file a certificate of correction
Dec 16, 2024 · Penalty $1,250
Active - Class - 2
Violation #35137107p written for operation of place of assembly without a current c of o on 11/19/2016. no coc found on dob records., file a certificate of correction
Dec 16, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner noted: at time of inspection observed horizontal step cracks above windows at exp#1., repair and/or replace
Nov 8, 2024 · Penalty $625
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. noted: at time of inspection observed work continue against stop work order issued under complain #4544295 construction work is 100% complete., co
Nov 4, 2024 · Penalty $5,000
Active - Class - 1
Work without permit noted: at time of inspection observed enclosed structures created for small business attached to building at exp# 1&2, no permits on file in dob system, obtain permit
Aug 14, 2024 · Penalty $2,530
Resolve - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 39022333z issued on 05/15/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply
Mar 15, 2024
Resolve - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 39022339j issued on 05/15/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply
Mar 15, 2024
Resolve - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 39022335m issued on 05/15/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply
Mar 15, 2024
Resolve - Class - 1
Failure to comply with commissioner order contained in violation#39022333z issued on 5-15-2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply with commissioner's order; f
Feb 6, 2024
Resolve - Class - 1
Failure to comply with commissioner order contained in violation#39022339j issued on 5-15-2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply with commissioner's order; f
Feb 6, 2024
Resolve - Class - 1
Failure to comply with commissioner order contained in violation#39022335m issued on 5-15-2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply with commissioner's order; f
Feb 6, 2024
Resolve - Class - 1
Failure to maintain building code compliant. noted: at the front facade there is cracked and separating brick masonry extending to the parapet with loose and missing mortar joints., obtain permit; comply with c
Jan 6, 2024 · Penalty $1,250
Active - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 39022335m issued on 05/15/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. responde
Dec 19, 2023
Resolve - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 39022333z issued on 05/15/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure
Dec 15, 2023
Resolve - Class - 1
Summons issued for failure to maintain due to multiple cracks in brick facade along missing mortar throughout exterior wall at exposure #1., repair and/replace
Oct 1, 2023 · Penalty $1,250
Resolve - Class - 1
Contrary to dob records - overcrowding observed at time of inspection where approx 110 occupants observed, discontinue illegal occupancy or amend c of o
Mar 25, 2023
Resolve - Class - 1
Failure to maintain building in a code compliant manner - failure to provide clear passageway - debris at the 2nd mens of egress partially blocked along with illegal hardware, remove obstruction
Mar 25, 2023 · Penalty $1,250
Resolve - Class - 2
Illegal use in a commercial district.unlicenced physical treatment establishment of 2nd floor front doing business as mom berenice's beauty salon prohibited use per zr 12-10 operating in a cr6-pleneral resident
Mar 23, 2022
Resolve - Class - 2
Work without a permit illegal work noted:at 2nd floor front a physicaltreatment named as mom berenice's beauty salon erected partition wallsto create 4 massage rooms.rem:obtain all permits.
Mar 23, 2022 · Penalty $1,250
Resolve - Class - 2
Occupancy contrary to that allowed by cofo 402032830 illegal occupancynoted:at 2 floor front converted/occupied as physical culture establishment massage parlor with 4 massage bed and room.rem:discontinue illeg
Nov 19, 2021 · Penalty $1,250
Resolve - Class - 2
At 2 floor front occupied as adult physical culture establishment and physical culture establishment as per zr 12-10 massage parlor with bsaapproval as raymond per zr 7336.rem:discontinue illegal occupancy.
Nov 19, 2021
Resolve - Class - 2
At second floor(front)occupied as adult physical culture establishmentand physical culture establishment as per 12-10 777 day spa without bsa approval as required per zr 73-36.rem:discontinue illegal use.
Sep 17, 2021
Resolve - Class - 2
Work without a permit.work noted:at second floor(front)erected partition walls to create 3 extra rooms.rem:obtain required permit.
Sep 17, 2021 · Penalty $625
Resolve - Class - 2
Occupancy contrary to that allowed by the cofo#46995 illegal occupancynoted:at second floor front has been converted/occupied as adult physical culture establishment and physical culture establishment doing bus
Sep 17, 2021 · Penalty $625
Resolve - Class - 3
Work without a permit.i observed an illuminated grey awning with greenletting that reads"tecolote sport bar."the awning is approx 14ft in length and 3ft in height.no permits on file at the dob for this awning.
Mar 19, 2021 · Penalty $500
Active - Class - 1
Observed on 5/5/20 at 840 am in the cellar pvc drain piping and a fernco coupling serving a 3 compartment sink . pvc is not an approved material as per pc code 701.10., repair and/replace
May 15, 2020 · Penalty $1,250
Active - Class - 1
Observed at 835 am at 5/15/20 in the 1st floor store ,plumbing work without a permit . a new 1/2 copper water line and ball valve installed to service a coffee station . a new 3 compartment sink was installed a
May 15, 2020 · Penalty $1,250
Resolve - Class - 1
Observed at 835 am on 5/5/20 1st fl store new electrical boxes installed with wiring and conduit piping to service a coffee station and under counter outlets new recessed ceiling lighting installed and a new ro
May 15, 2020 · Penalty $1,600
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39008653r issued on 8/28/19 & to file a certificate of correction pursuant toi 28-201.1 and 1rcny 102-01.unlawfully continued work
Oct 16, 2019 · Penalty $625
Resolve - Class - 1
Work on 2nd floor ongoing contrary to a stop work order, comply with stop work order
Aug 28, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/ violation #35333108p issued on 06/13/18 and to file a certificate of correction pursuant to28-201.1 and 1rcny 102-01.at second story remov
May 11, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35333108p issued on 6/13/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. at 2nd story,removed wood
Mar 2, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/ violation #35333108p issued on 6/13/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit
Jan 11, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35333108p issued on 06/13/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. at 2nd sty,work w/o permit. remedy: comply w/comm's order &/or
Oct 13, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/violation #35333108p issued on 06/13/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01 for work w/o permit. rmdy: com
Sep 4, 2018 · Penalty $2,500
Resolve - Class - 1
Work without a permit.noted:at 2nd story front,removed wood frame bearing wall accepting 3rd story supporting girder abd floor joists.girderis deflecting and 3rd story floor is sagging.also 3rd story front part
Jun 13, 2018 · Penalty $1,600
Resolve - Class - 1
Sec: operation of a place of assembly w/out a current c of o. defect noted: @ time of insp bar doing business as "el gato verde" is operating w/out a pa permit. c of o# 402032830f states establishment to be cov
Nov 19, 2016 · Penalty $1,600
Resolve - Class - 2
Work w/o a permit. noted: in 1st fl commercial space installing new ceiling w/drops also relocating electrical wires,fixtures. dept records indicate no permits obtained for this work. stop all work.
Sep 8, 2015
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 17, 2025 · Apt 3R
Close - Plumbing
Basin/sink
Aug 21, 2023 · Apt 2R
Close - Water leak
Heavy flow
Aug 21, 2023 · Apt 2R
Close - Unsanitary condition
Pests
Aug 21, 2023 · Apt 2R
Close - Flooring/stairs
Floor
Aug 21, 2023 · Apt 2R
Close - Heat/hot water
Apartment only
Aug 21, 2023 · Apt 2R
Close - Appliance
Electric/gas range
Feb 14, 2023 · Apt 1FBLAC
Close - Heat/hot water
Apartment only
Feb 14, 2023 · Apt 1FBLAC
Close - Electric
No lighting
Feb 14, 2023 · Apt 1FBLAC
Close - Unsanitary condition
Mold
Feb 14, 2023 · Apt 1FBLAC
Close
Show 40 more ↓
- Plumbing
Basin/sink
Feb 14, 2023 · Apt 1FBLAC
Close - Electric
Outlet/switch
Feb 14, 2023 · Apt 1FBLAC
Close - Heat/hot water
Apartment only
Feb 14, 2023 · Apt 1FBLAC
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt 2F
Close - Heat/hot water
Entire building
Jan 21, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2019 · Apt 2F
Close - Heat/hot water
Entire building
Jan 7, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2019 · Apt 2F
Close - Heat/hot water
Entire building
Dec 7, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2018 · Apt BLDG
Close - Water leak
Heavy flow
Sep 28, 2018 · Apt 3F
Close - Paint/plaster
Ceiling
Sep 18, 2018 · Apt 3F
Close - Water leak
Heavy flow
Sep 18, 2018 · Apt 3F
Close - General
Cooking gas
Mar 26, 2018 · Apt 2F
Close - Heat/hot water
Entire building
Feb 25, 2018 · Apt 2R
Close - Water leak
Heavy flow
Mar 4, 2016 · Apt 2R
Close - Water leak
Heavy flow
Mar 4, 2016 · Apt 2R
Close - Water leak
Heavy flow
Mar 4, 2016 · Apt 2R
Close - Water leak
Damp spot
Feb 19, 2016 · Apt 2RJ
Close - Water leak
Damp spot
Feb 19, 2016 · Apt 2RJ
Close - Water leak
Heavy flow
Feb 19, 2016 · Apt 2RJ
Close - Paint/plaster
Ceiling
Feb 16, 2016 · Apt 2RJ
Close - Water leak
Heavy flow
Feb 16, 2016 · Apt 2RJ
Close - Water leak
Heavy flow
Feb 16, 2016 · Apt 2RJ
Close - Water leak
Heavy flow
Feb 16, 2016 · Apt 2RJ
Close - Door/window
Window frame
Feb 16, 2016 · Apt 2RJ
Close - Paint/plaster
Ceiling
Feb 16, 2016 · Apt 2RJ
Close - Heat/hot water
Entire building
Jan 20, 2015 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 9, 2015 · Apt 2F
Close - Paint/plaster
Ceiling
Jan 9, 2015 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 9, 2015 · Apt 2F
Close - Heat/hot water
Entire building
Jan 9, 2015 · Apt 2F
Close - Outside building
Roofing
Jan 9, 2015 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 9, 2015 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K2)
- Year built
- 1925
- Floors
- 3
- Residential units
- 4
- Building area
- 35,438 ft²
- Lot area
- 17,200 ft²
- Zoning
- R6
- Community board
- 404
- Council district
- 25
- Block / lot
- 1493 / 3
- Assessed value
- $7,285,050
- Landmark / historic district
- No
HPD registration #412887, last renewed Jul 30, 2026.
Questions about 40-06 82 Street
Who owns 40-06 82 Street?
The owner of record in NYC Department of City Planning PLUTO data is Roosevelt Avenue Enterprises LLC.
Does 40-06 82 Street have violations?
Yes. NYC HPD has recorded 321 housing violations at this property.
Is 40-06 82 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 40-06 82 Street built?
City records list 1925 as the year it was built.
How many apartments are in 40-06 82 Street?
It has 4 residential units and 27 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.