35-20 94 Street
Queens, NY 11372BBL 4-01467-0014Map
Owner of record: Tawadrous Ihab A
35-20 94 Street is a walk-up apartment building built in 1930 in Queens, 11372. It has 20 residential units across 5 floors. The owner of record is Tawadrous Ihab A. HPD has recorded 122 housing violations here, most recently on May 7, 2026. 45 of the 50 most recent violations are still open.
- HPD violations
- 122
- DOB violations
- 9
- ECB violations
- 6
- HPD complaints
- 162
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 122
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble tread, 7th from intermediate landing at bulkhead stairs , 5th story
Apr 21, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of self lockable panic bar installed at door to roof at bulkhead stairs , 5th story
Apr 21, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to roof at bulkhead stairs , 5th story
Apr 21, 2026
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building front entrance door , 1st story
Apr 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system . door locked in cellar at boiler room
Apr 14, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of unacceptable electromagnetic locking device installed at building front entrance door , 1st story
Apr 14, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 4th story balcony at 1st stack from west at north at fire escape
Apr 14, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 2nd story balcony at 1st stack from west at north at fire escape
Apr 14, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 2nd story balcony at 1st stack from east at south at fire escape
Apr 14, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 4th story, 1st apartment from south at west
Apr 14, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing consisting of kick down door stopper at door in the entrance located at apt 3d, 4th story, 1st apartment from south at west
Apr 14, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures from the 1st floor to the 5th floor at 1st public hall from east at south
Feb 28, 2026
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures throughout in the entire apartment located at apt 2c, 3rd story, 1st apartment from north at east
Feb 28, 2026 · Apt 2C
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - BHazardous
Provide security of an acceptable mechanical heavy duty lock and latch set at building entrance , 1st story
Mar 20, 2025
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening unacceptable electromagnetic locking device installed at building entrance door , 1st story
Mar 20, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective 1st. 2nd and 3rd marble tread at vestible , 1st story
Mar 20, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Mar 20, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
Mar 20, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 5th story
Mar 20, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Mar 20, 2025
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant materiial at ceiling at public hall, 5th story
Mar 20, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 5th story
Mar 20, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all wall at roof bulkhead at public hall
Mar 20, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at roof bulkhead ceiling at public hall
Mar 20, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at roof bulkhead ceiling at public hall
Mar 20, 2025
Open — Nov sent out - CImmediately hazardous
Provide approved metal screen below skylight at roof bulkhead at public hall
Mar 20, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at roof bulkhead door at public hall
Mar 20, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 2, 2024
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2023
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2022
Open — First no access to re- inspect violation - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes front of building entrance all stories at fire escape
Jun 13, 2022
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 13, 2022
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 13, 2022
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 13, 2022
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 13, 2022
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Open — First no access to re- inspect violation - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at balconys all stories (building entrance ) at fire escape
Jun 20, 2021
Open — Not complied with - CImmediately hazardous
Replace with new the broken or defective wire glass at lower window sash. at public hall stairs, 5th story
May 26, 2021
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold items. at 1st public hall bulkhead from north, 5th story
May 26, 2021
Open — Not complied with - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 15, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3e, 5th story, 1st apartment from south at west
Feb 27, 2021 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling in the kitchen located at apt 3e, 5th story, 1st apartment from south at west
Feb 27, 2021 · Apt 3E
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 3e, 5th story, 1st apartment from south at west
Feb 27, 2021 · Apt 3E
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3e, 5th story, 1st apartment from south at west
Feb 27, 2021 · Apt 3E
Open — First no access to re- inspect violation
DOB building violations · 9
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
ECB violations · 6
- Class - 2
Failure to comply with the commissioner's order contained in nov #35196999j issued on 09/21/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01.remedy:comply with commis. order &/or file a c of c
Nov 26, 2016 · Penalty $2,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. defect noted: at rear side yard exp#3,iron fence gate at middle is chained & padlocked preventing egress from fire escapes to street. at exp#4 side yard,right
Sep 21, 2016 · Penalty $1,030
Active - Hazardous
3esidence altered for occupancy for more than the legally approved# of families cof o #43039 indicates that it is a 5 story apartment bldg. with illegal cellar apartmen. at cellar level full partitions creating
Nov 7, 1999 · Penalty $3,050
Active - Hazardous
Occupancy contrary to that allowed by cofo #43039 illegal occupancy noted-legal apartment building with illegal basement partition walls erected to create bedroom and kitchen area with gas stove. no bathroom f
Nov 7, 1999
Resolve - Hazardous
Work without a permit: work noted to cellar level partitions erected creating kitchen with gas stove, bedroom and living area 100 bath reonseen at time of inspection but bathroom believed to be covered. remedy:
Nov 7, 1999 · Penalty $800
Active - Hazardous
Occupancy contrary to that allowed by the c of o or building dept records. cellar at rear stoarge and ordinary use into an apt. partitions erected with kitchen and bathroom facilities installed.
Sep 30, 1999 · Penalty $800
Active
Complaints
- Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 17, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 16, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt A3
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2024 · Apt BLDG
Close - General
Cooking gas
Feb 20, 2024 · Apt 1B
Close - Appliance
Electric/gas range
Dec 12, 2023 · Apt 1B
Close - General
Cooking gas
Nov 14, 2023 · Apt 1B
Close - Heat/hot water
Apartment only
Oct 31, 2023 · Apt 1B
Close - Unsanitary condition
Mold
Jun 8, 2022 · Apt 4C
Close - Door/window
Door frame
Jun 8, 2022 · Apt 4C
Close - Flooring/stairs
Floor
Jun 8, 2022 · Apt 4C
Close - Paint/plaster
Wall
Jun 8, 2022 · Apt 4C
Close - Water leak
Slow leak
Jun 8, 2022 · Apt 4C
Close - Unsanitary condition
Sewage
Jun 16, 2021 · Apt 4C
Close - Unsanitary condition
Sewage
May 23, 2021 · Apt 4C
Close - Heat/hot water
Apartment only
May 23, 2021 · Apt 4C
Close - Unsanitary condition
Mold
Jan 26, 2021 · Apt 3E
Close - Plumbing
Bathtub/shower
Jan 26, 2021 · Apt 3E
Close - Heat/hot water
Entire building
Dec 14, 2019 · Apt 4A
Close - Heat/hot water
Apartment only
Oct 19, 2018 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 29, 2017 · Apt B1
Close - Paint/plaster
Wall
Aug 15, 2017 · Apt B1
Close - Paint/plaster
Ceiling
Aug 15, 2017 · Apt B1
Close - Unsanitary condition
Mold
Aug 15, 2017 · Apt B1
Close - Paint/plaster
Ceiling
Aug 15, 2017 · Apt B1
Close - Electric
Lighting
Aug 15, 2017 · Apt B1
Close - Door/window
Window frame
Aug 15, 2017 · Apt B1
Close - Paint/plaster
Cabinet
Aug 15, 2017 · Apt B1
Close - Plumbing
Bathtub/shower
Aug 15, 2017 · Apt B1
Close - Door/window
Window frame
Aug 15, 2017 · Apt B1
Close - Water leak
Heavy flow
Aug 15, 2017 · Apt B1
Close - Paint/plaster
Ceiling
Mar 1, 2016 · Apt 1A
Close - Paint/plaster
Wall
Mar 1, 2016 · Apt 1A
Close - Paint/plaster
Ceiling
Mar 1, 2016 · Apt 1A
Close - Paint/plaster
Ceiling
Sep 29, 2015 · Apt 1A
Close - Paint/plaster
Ceiling
Sep 29, 2015 · Apt 1A
Close - Water leak
Heavy flow
Sep 29, 2015 · Apt 1A
Close - Water leak
Heavy flow
Sep 29, 2015 · Apt 1A
Close - Water leak
Heavy flow
Sep 29, 2015 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1930
- Floors
- 5
- Residential units
- 20
- Building area
- 16,720 ft²
- Lot area
- 5,500 ft²
- Zoning
- R6A
- Community board
- 403
- Council district
- 25
- Block / lot
- 1467 / 14
- Assessed value
- $537,750
- Landmark / historic district
- No
HPD registration #417020, last renewed Feb 18, 2022.
Questions about 35-20 94 Street
Who owns 35-20 94 Street?
The owner of record in NYC Department of City Planning PLUTO data is Tawadrous Ihab A.
Does 35-20 94 Street have violations?
Yes. NYC HPD has recorded 122 housing violations at this property.
Is 35-20 94 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 35-20 94 Street built?
City records list 1930 as the year it was built.
How many apartments are in 35-20 94 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.