34-20 Junction Boulevard

Queens, NY 11372BBL 4-01455-0007Map

Owner of record: Bg Junction Realty, LLC

34-20 Junction Boulevard is an elevator apartment building built in 2024 in Queens, 11372. It has 125 residential units across 7 floors. The owner of record is Bg Junction Realty, LLC. HPD has recorded 6 housing violations here, most recently on September 13, 2026. 5 of the 6 most recent violations are still open.

HPD violations
6
DOB violations
0
ECB violations
31
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Sep 13, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 6

  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 1st story

    Sep 13, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story

    Sep 13, 2026

    Open — Nov certified on time
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox, 1st story

    Sep 13, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story

    Sep 13, 2026

    Open — Nov certified on time
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story

    Sep 13, 2026

    Open — Nov certified on time
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 31

  • Class - 2

    Observed that the construction fence along exposure 4 of site is erected contrary to plans. a makeshift barrier consisting of 2x4 wood framing with netting was installed on top of yodok's barriers contrary to d

    Feb 26, 2026 · Penalty $1,000

    Resolve
  • Class - 2

    Site failed to adequately safeguard pedestrians along the public walkway on exp 1. sections of the construction fence were found dislodged and lying on the ground along pedestrian's pathway potentially exposing

    Feb 26, 2026 · Penalty $2,400

    Resolve
  • Class - 2

    New 7 story building .observed site closed no ongoing construction activity .upon inspection observed inadequate housekeeping noted it in diffetents location .like 34 ave pile of wood and earth on juntion blvd

    Dec 20, 2025 · Penalty $3,125

    Resolve
  • Class - 2

    New 7 story building .observed site closed no ongoing construction activity .upon inspection observed fence not maintained : on side of junction blvd fence not maintainned not strigh, and missing few panel vie

    Dec 20, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    New 7 story building .observed site closed no ongoing construction activity .upon inspection observed fence erected on exposure 1 but none permit was posted contrary to building code

    Dec 20, 2025 · Penalty $750

    Resolve
  • Class - 2

    At time of inspection observed: proposed 7 story new building, top off. no construction activities. at exposure# 1 missing mirrors at blind spot under the sidewalk shed at pedestrian walkway right side of the h

    Oct 4, 2025 · Penalty $625

    Resolve
  • Class - 1

    At the time of inspection of a six-story new building, multiple windows opening were observed at the 6th floor without guardrail system . in addition, the roof level guardrail system was found to be inadequate

    Jul 28, 2025 · Penalty $5,000

    Resolve
  • Class - 1

    At the time of inspection of a six-story building, handrails were observed missing from the stairway between the 2nd floor, 1st floor, and basement level. the absence of required handrails creates a hazardous c

    Jul 28, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    3314.8.2 at the time of inspection of a six-story building, pipe scaffolding was observed at exposures 1, 2, and 3 with missing and torn debris netting in multiple areas. this condition creates a hazardous envi

    Jul 28, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Observation: 3rd floor @ exposure #3. 4 needle beams inadequate missing angle plates does not conform to plan. drawing show 5 needle beams with 2 plates on each beam. pswo for needle beams contrary to planscon

    Jun 11, 2025

    Resolve
Show 21 more ↓
  • Class - 2

    Observed supported pipe scaffold installed at exp#2 not as per approved drawings. observed approx. 16ft long truss supporting pipe scaffold frame, truss was supported by 3x2" pipes. and all clamped to scaffold

    Apr 10, 2025

    Resolve
  • Class - 2

    Observed stored materials on supported scaffold and sidewalk-shed on multiple locations which is contrary to approved sidewalk-shed &supported scaffold plans, this creates hazardous condition to public safety.r

    Mar 11, 2025 · Penalty $625

    Resolve
  • Class - 2

    Observed sidewalk-shed erected at all exposers, at exp.#4 observed missing high visibility marking for vehicular access point as per 3307.6.4.4.provide and maintain high visibility marking for vehicular access

    Mar 11, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to perform concrete washout procedures and collection and containment. as noted at time of inspection on an active construction site7 story new building, concrete placement work approx. 500 cubic yards.

    Dec 30, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. as noted at time of inspection on an active construction site, 7 story new building formwork and rebar placement working on f

    Dec 27, 2024 · Penalty $625

    Resolve
  • Class - 1

    No site-specific formwork design drawings present per 3301.7. as noted: at time of inspection on an active construction site 7 story new building form work and rebar placement work on floor #5. observed at firs

    Dec 27, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3303.6 escape hatches@7story nb site observe active 4th fl concrete pour with tarp enclosure below pour deck with use of portable fuel space heaters throughout&not 1 single escape hatch was provided nor compl

    Dec 23, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Bc 3301.1.1 responsibility for safety. observed 7 oxygen tanks stored outside of the designated storage cage, directly next to the fence separating the job from the public area (roadway). this condition creates

    Aug 12, 2024

    Resolve
  • Class - 2

    Observed site at excavation stage with no earth ramp provided for machinery/vehicle access. per the site safety plan, an earth ramp is to bein place and may be relocated as needed but no mention on ssp regardin

    Aug 12, 2024

    Resolve
  • Class - 2

    Observed section of roadway at exp#2 (34th rd) occupied by jobsite contrary to the site safety plan & dot stipulations- street closed off entirely by flaggers; enclosure occupying more space than allowable- onl

    Aug 12, 2024

    Resolve
  • Class - 1

    Observed an area of excavation near exp#1 & 4 corner with an elevated area of the excavation, dropping down, with the depth beyond the edge of this area dropping down more approximately 8ft on 1 side- no guard

    Aug 12, 2024

    Resolve
  • Class - 1

    Cease use 21-l-10 ,21-q-03=1st floor door interlock as doesnt hold you an open this door at anytime 21-q-03 install interlock cover

    Sep 17, 2019 · Penalty $1,250

    Resolve
  • Class - 3

    Work does not conform to approved construction documents or amendments.job#420472848/a2/dwg-paa dated 03/17/14.noted:(1)super market west rear yard steel awning,steel gate approx.20'recieveing room entry double

    May 22, 2014 · Penalty $200

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by c of o #124100 or building dept records. noted: south side,exposure 3,of parking lot is used for food retail & storage. usage should be for parking lot. remedy: conform to

    Dec 19, 2011

    Resolve
  • Class - 2

    Work w/o a permit. noted: erected plywood,metal frame & canvas addition to building approx 30ft wide x 60ft long. also metal enclosure for coin operated machines,both include electric. remedy: obtain permits.

    Dec 19, 2011 · Penalty $800

    Resolve
  • Class - 3

    Occupancy contrary to that allowed by the c of o or building dept records according to c of o #1557/57 issued 8/458 front yard of the building should be occupied as parking of the building should be occupied as

    Apr 29, 2010 · Penalty $500

    Resolve
  • Class - 2

    Work w/o permit noted food bazzar supermarket extension at right side premise construction structure enclosure apprx 50'x30' 10'ht rem: obtain permit or restore premises to prior legal condition

    Mar 23, 2010 · Penalty $800

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by cert of occupancy #124100 note: storage of beverages in 8 hign by 12 long plastic enclosure in the paking lot. discontinue the illegal storage pg beverages in the parking l

    Jan 25, 2010 · Penalty $200

    Resolve
  • Non-hazardous

    Work w/o a permit. work done : in parking supermarket junction food bazzar " counvas tent ( approx 40' x 30' x 10' high ) erected for storage of beverages - w/o a permit remedy : obtain permit or remove tent

    Dec 24, 2002 · Penalty $250

    Resolve
  • Non-hazardous

    Work without permit noted erected a wooden mezzanine and partitions to creating rooms at rear portion of this premises size of the mezzanie is approx 40 long x15 wide at 1st story level remedy obtain a permit i

    Jul 17, 1996 · Penalty $175

    Resolve
  • Non-hazardous

    Work without a permit. work noted alteration of existing suprmarket including he whung ceiling new hrywall partitions new flooring etc. are done. remedy- obtain a permit if feasible or restore premises to prior

    Jun 25, 1996 · Penalty $350

    Resolve

Complaints

  • Electric

    Power outage

    Sep 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Sep 7, 2026 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2024
Floors
7
Residential units
125
Building area
147,623 ft²
Lot area
46,326 ft²
Zoning
R6A
Community board
403
Council district
21
Block / lot
1455 / 7
Assessed value
$6,882,300
Landmark / historic district
No

HPD registration #434682, last renewed May 8, 2026.

Questions about 34-20 Junction Boulevard

Who owns 34-20 Junction Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Bg Junction Realty, LLC.

Does 34-20 Junction Boulevard have violations?

Yes. NYC HPD has recorded 6 housing violations at this property.

Is 34-20 Junction Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 34-20 Junction Boulevard built?

City records list 2024 as the year it was built.

How many apartments are in 34-20 Junction Boulevard?

It has 125 residential units and 127 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.