40-32 61 Street
Queens, NY 11377BBL 4-01335-0064Map
Owner of record: Molena, Mohine Rahman
40-32 61 Street is an one-family home built in 1920 in Queens, 11377. It has 1 residential unit across 2.5 floors. The owner of record is Molena, Mohine Rahman. HPD has recorded 14 housing violations here, most recently on February 20, 2026. 14 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 2
- ECB violations
- 12
- HPD complaints
- 2
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall, north wall, 1st door from north at east wall in the 2nd room from north at west located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, 1st door from east at south wall in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall, south wall, north wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall, west wall, 1st door frame from west at north wall, 1st door frame from south at west wall in the private hallway located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, east wall, west wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 2nd room from north at west located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, west wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, 1st window frame from north at east wall in the private hallway located at apt 1, 1st story, 1st apartment from west at north
Feb 20, 2026 · Apt 1
Open — Nov sent out
Show 4 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2026
Open — Info nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 15, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 15, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water exceeding the maximum allowable temperature of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 15, 2026 · Apt 1
Open — Nov sent out
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2011
Dob violation - active - Construction other optional
C-construction other optional
Jul 27, 2009
Dob violation - active
ECB violations · 12
- Class - 2
Failure to comply w/commissioner's order to file a certificate of correction with the dob for nov#34920590m issued on 8/31/11 pursuant to 28-204.4 & 1rcny 102-01 for residence altered.rmdy: file a certificate
Dec 28, 2012
Resolve - Class - 1
Failure to comply w/ the comms order contained in nov#34920589p issued on 08/31/11.illegal class a cellar.rem:comply w/ the comms order.
Jun 9, 2012 · Penalty $24,000
Active - Class - 1
Failure to comply w/comm's order to correct vio #34920589p issued 8/31/11 (illegal class'a' cellar w/3pc bath) remedy: comply w/comm's order.
Apr 13, 2012 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34920589p issued on 8.31.11. (illegal class 'a' cellar). remedy: comply w/thecommissioner's order.
Feb 27, 2012 · Penalty $24,000
Resolve - Class - 1
Failure to comply with the commissioner's order contained in notice ofviolation #34920589p issued on 8-31-11 at cellar illegal class a apt with 3pc bath & partitions. rem:comply with the commissioner's order.
Dec 29, 2011 · Penalty $24,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrections w/ the dept. of bldg for notice of violation # 34920590m issued on 08/31/11 pursuant to 28-204.4 & 1rcny 102-01, for residence a
Oct 15, 2011 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in notice of violation # 34920589p issued on 08/31/11, for work w/o permit. cellar &1st fl remedy: comply w/ the commissioner's order
Oct 15, 2011 · Penalty $12,000
Resolve - Class - 1
Work w/o permit. work noted thruout - cellar erected full partition for 1 3 pc & 1 2pc bathroom 2 sinks, 2 toilets, 1 shower and residentialsink w/gas line and stove at kitchen. at 1st flr full partitions to
Aug 31, 2011 · Penalty $8,000
Active - Class - 1
Residence altered for occupancy as a dwelling from 1 family to 5 families. dobs records indicate residence as a 1 family. residence now altered & occupied as a 3 family & 2 sros. alt work noted:@ cellar 1 class
Aug 31, 2011 · Penalty $57,000
Active - Class - 2
Gas being supplied to building without inspection and certificate by dob upon inspection observed 1 smith hot water heater in use in the cellar without gas autorotation. hot water heater in use in the cellar
Aug 28, 2011 · Penalty $2,500
Active
Show 2 more ↓
- Class - 2
Work without a permit. upon inspection observed one a.o. smith hot water heater installed in the cellar without a permit. also observed new gas lines installed for the 1st & 2nd floor gas ranges without permit.
Aug 23, 2011 · Penalty $4,000
Active - Class - 2
Use or installation of plumbing materials which do not comply with rs-16. upon inspection observed 1/2 gas lines installed from the cellar up to the 1st floor gas range 3/4 is the minimum pipe allowed for range
Aug 23, 2011 · Penalty $2,500
Active
Complaints
- Heat/hot water
Apartment only
Feb 9, 2026 · Apt 1STFLO
Close - Plumbing
Radiator
Feb 9, 2026 · Apt 1STFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A1)
- Year built
- 1920
- Floors
- 2.5
- Residential units
- 1
- Building area
- 2,050 ft²
- Lot area
- 3,300 ft²
- Zoning
- R5B
- Community board
- 402
- Council district
- 26
- Block / lot
- 1335 / 64
- Assessed value
- $73,140
- Landmark / historic district
- No
Questions about 40-32 61 Street
Who owns 40-32 61 Street?
The owner of record in NYC Department of City Planning PLUTO data is Molena, Mohine Rahman.
Does 40-32 61 Street have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 40-32 61 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 40-32 61 Street built?
City records list 1920 as the year it was built.
How many apartments are in 40-32 61 Street?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.