41-10 53 Street
Queens, NY 11377BBL 4-01315-0057Map
Owner of record: Elizabeth Nikolopoulos, Trustee
41-10 53 Street is a walk-up apartment building built in 1931 in Queens, 11377. It has 6 residential units across 3 floors. The owner of record is Elizabeth Nikolopoulos, Trustee. HPD has recorded 153 housing violations here, most recently on May 6, 2026. 41 of the 50 most recent violations are still open.
- HPD violations
- 153
- DOB violations
- 5
- ECB violations
- 4
- HPD complaints
- 75
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 153
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door leading to public hall , 1st story
Feb 3, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire door at east wall leading to cellar at public hall, 1st story
Feb 3, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective steam riser air valve at southwest in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood parquet floor in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective radiator air valve at east in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective knob at radiator shut-off valve at east in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system near mailbox at public hall, 1st story
Feb 3, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood parquet floor in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Replace the broken or defective bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system . door locked in cellar at boiler room
Feb 3, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Feb 3, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at fire door at east wall leading to cellar at public hall, 1st story
Feb 3, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 1o sq ft at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from east at south original violation 18602624 issued 28-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jan 28, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Jan 28, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Jan 28, 2026
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entrance located at apt 1l, 1st story, 1st apartment from east at south
Jan 28, 2026 · Apt 1L
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Jan 28, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Jan 28, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 1o sq ft at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Jan 28, 2026 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Jan 28, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Jan 28, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1l, 1st story, 1st apartment from east at south
Jan 28, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story at boiler room, 1st story
Jan 28, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jan 23, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 23, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 23, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 23, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jan 23, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule at public hall, 1st story
Jan 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door leading to basement at public hall, 1st story
Jan 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at service area entrance at basement
Jan 23, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at basement
Jan 23, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at meter room at basement
Jan 23, 2026
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended accousting tile ceiling at meter room at basement
Jan 23, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations insufficient in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jan 23, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jan 23, 2026 · Apt 1R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jan 23, 2026 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and east wall at basement
Jan 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from west at north
Jan 23, 2026 · Apt 1R
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules insufficient in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jan 23, 2026 · Apt 1R
Open — Nov sent out
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
ECB violations · 4
- Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved # of families.dept. of bldgs. records indicates premises to be legally approved for six families.residence is now altered for occ
Apr 18, 2007 · Penalty $2,975
Resolve - Hazardous
Failure to comply w/the commissioner's order to certify/correct nov#34546596x.work noted:cellar level installed water & waste lines for a 3pc bath(sink,toilet,shower) & residential sink.also noted:installed a
Apr 18, 2007 · Penalty $1,500
Resolve - Hazardous
Residence alt for occupancy as a dwelling for mote the the legally approved # of families. d.o.b records indicates premises to be legally approved for a 6 family.now premises converted to 7 family. alt work
Dec 14, 2006 · Penalty $3,050
Resolve - Hazardous
Work w/o a permit. work noted: at cellar level premises installed water & waste lines for a 3 pc bathroom(toilet,sink,shower) & residential sink at kitchen.remedy:obtain permit or restore to prior legal conditi
Dec 14, 2006 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
Oct 21, 2026 · Apt 2R
Open - Safety
Fire escape
Oct 21, 2026 · Apt 3R
Open - Unsanitary condition
Pests
Oct 21, 2026 · Apt 2R
Open - Door/window
Door
Oct 21, 2026 · Apt 2R
Open - Safety
Smoke detector
Oct 21, 2026 · Apt 2R
Open - Safety
Carbon monoxide detector
Oct 21, 2026 · Apt 2R
Open - Plumbing
Toilet
Oct 21, 2026 · Apt 2R
Open - Unsanitary condition
Mold
Oct 21, 2026 · Apt 2R
Open - Plumbing
Water supply
Oct 21, 2026 · Apt 2R
Open - Door/window
Door
Oct 21, 2026 · Apt 3L
Open
Show 40 more ↓
- Unsanitary condition
Pests
Oct 21, 2026 · Apt 3L
Open - Door/window
Door
Oct 21, 2026 · Apt 3L
Open - Safety
Smoke detector
Oct 21, 2026 · Apt 3L
Open - Safety
Carbon monoxide detector
Oct 21, 2026 · Apt 3L
Open - Plumbing
Water supply
Oct 21, 2026 · Apt 3L
Open - Unsanitary condition
Mold
Oct 21, 2026 · Apt 3L
Open - General
Cabinet
Oct 21, 2026 · Apt 3L
Open - Paint/plaster
Ceiling
Oct 21, 2026 · Apt 3L
Open - Paint/plaster
Ceiling
Oct 21, 2026 · Apt 3L
Open - Plumbing
Radiator
Oct 21, 2026 · Apt 3R
Open - Plumbing
Water supply
Oct 21, 2026 · Apt 3R
Open - Plumbing
Toilet
Oct 21, 2026 · Apt 3R
Open - Safety
Carbon monoxide detector
Oct 21, 2026 · Apt 3R
Open - Safety
Smoke detector
Oct 21, 2026 · Apt 3R
Open - Door/window
Door
Oct 21, 2026 · Apt 3R
Open - Unsanitary condition
Pests
Oct 21, 2026 · Apt 3R
Open - Unsanitary condition
Pests
Oct 21, 2026 · Apt 3L
Open - Outside building
Skylight
Oct 20, 2026 · Apt BLDG
Open - Unsanitary condition
Garbage/recycling storage
Oct 20, 2026 · Apt BLDG
Open - Plumbing
Sewer
Oct 20, 2026 · Apt BLDG
Open - Flooring/stairs
Stairs
Oct 20, 2026 · Apt BLDG
Open - Paint/plaster
Ceiling
Oct 20, 2026 · Apt BLDG
Open - Unsanitary condition
Mold
Oct 20, 2026 · Apt BLDG
Open - Unsanitary condition
Garbage/recycling storage
Oct 20, 2026 · Apt BLDG
Open - Door/window
Door
Oct 20, 2026 · Apt BLDG
Open - Door/window
Door
Oct 20, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 15, 2026 · Apt BLDG
Close - Plumbing
Water supply
Sep 7, 2026 · Apt 3R
Close - Plumbing
Basin/sink
Aug 25, 2026 · Apt 3R
Close - Water leak
Damp spot
Aug 25, 2026 · Apt 3R
Close - Water leak
Slow leak
Aug 17, 2026 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 3R
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 1L
Close - Heat/hot water
Apartment only
Jan 23, 2026 · Apt 1L
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 3R
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,208 ft²
- Lot area
- 2,700 ft²
- Zoning
- R5D
- Community board
- 402
- Council district
- 26
- Block / lot
- 1315 / 57
- Assessed value
- $429,750
- Landmark / historic district
- No
HPD registration #416845, last renewed Nov 27, 2018.
Questions about 41-10 53 Street
Who owns 41-10 53 Street?
The owner of record in NYC Department of City Planning PLUTO data is Elizabeth Nikolopoulos, Trustee.
Does 41-10 53 Street have violations?
Yes. NYC HPD has recorded 153 housing violations at this property.
Is 41-10 53 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 41-10 53 Street built?
City records list 1931 as the year it was built.
How many apartments are in 41-10 53 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.