roofy

40-28 68 Street

Queens, NY 11377BBL 4-01299-0044Map

Owner of record: Luis, Raymond

40-28 68 Street is a two-family home built in 1925 in Queens, 11377. It has 2 residential units across 2 floors. The owner of record is Luis, Raymond. HPD has recorded 24 housing violations here, most recently on December 21, 2011. 24 of the 24 most recent violations are still open.

HPD violations
24
DOB violations
3
ECB violations
7
HPD complaints
52

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Dec 21, 2011

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 24

  • B

    Properly repair with similar material the broken or defective brick tread 1st up from bottom up at stairs at front areaway

    Dec 21, 2011

    Open — Nov sent out
  • B

    Repair or replace the smoke detector inoperative in the entire apartment located at apt 2ndfl, 2nd story

    Dec 21, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2ndfl, 2nd story

    Dec 21, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2ndfl, 2nd story

    Dec 5, 2011 · Apt 2NDFL

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective concrete floor at entrance at front areaway

    Sep 12, 2011

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective brick and cement work at stair tread at front areaway

    Sep 12, 2011

    Open — Nov sent out
  • B

    Properly repair the broken or defective lock at door in the bathroom located at apt 2ndfl, 2nd story

    Sep 12, 2011 · Apt 2NDFL

    Open — Nov sent out
  • A

    Replace with new the broken or defective lock at door in the 3rd room from east at south located at apt 2ndfl, 2nd story

    Sep 12, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color west wall in the 2nd room from east located at apt 2ndfl, 2nd story

    Sep 12, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt 2ndfl, 2nd story

    Sep 12, 2011 · Apt 2NDFL

    Open — Nov sent out
Show 14 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 2ndfl, 2nd story

    Sep 12, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 2ndfl, 2nd story

    Sep 12, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2ndfl, 2nd story

    Sep 12, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2ndfl, 2nd story

    Sep 12, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective brick and mortar joints at step at front entrance to building

    Jul 24, 2011

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective cement pavement at sidewalk in front of building

    Jul 24, 2011

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2ndfl, 2nd story

    Jul 24, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household articles at public hall, 2nd story

    Jul 24, 2011

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling at public hall, 2nd story

    Jul 24, 2011

    Open — Nov sent out
  • B

    Replace with new the missing wall cabinet door in the kitchen located at apt 2ndfl, 2nd story

    Jul 24, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 2ndfl, 2nd story

    Jul 24, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 2ndfl, 2nd story

    Jul 24, 2011 · Apt 2NDFL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2ndfl, 2nd story

    Jul 24, 2011 · Apt 2NDFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls, ceilings, and trim throughout in the entire apartment located at apt 2ndfl, 2nd story

    Jul 24, 2011 · Apt 2NDFL

    Open — Nov sent out

DOB building violations · 3

  • Construction other optional

    C-construction other optional

    Nov 22, 2010

    Dob violation - dismissed
  • Construction other optional

    Structure was constructed or altered without a permit in violation of 26-207. at cellar level installed water & waste lines for 3 pcs bathr oom (toilet,sink,shower) and residentail sink. erected partitions to create 3 rooms

    May 19, 2005

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 21, 1999

    Dob violation - dismissed

ECB violations · 7

  • Class - 3

    Work w/o a permit-noted at cellar level water & waste line installed for 3pcs bathroom w/(vanity,water closet,shower) noted: job #401344167 (ara) dated 1/30/01 (indicates removal of bathroom restore to original

    Apr 30, 2012 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain bldg in a code compliant manner. note at time of inspection found front brick steps w/approx 8 loose bricks. multiple bricks w/no mortar holding in place. remedy:repair/replace front steps

    Nov 10, 2011 · Penalty $1,250

    Resolve
  • Hazardous

    Work w/o permit note: at rear yard a wood/plexiglass awing approx. 16'x 10' x 10' high, built & attached to structure at rear of bldg w/o any permits. remedy: obtain permits or remove illegal work

    Oct 1, 2005

    Resolve
  • Hazardous

    Occupancy contrary to department of building records dob records indicates cellar to eb boiler room & storage illegal occupancy noted at cellar level used as dwelling with kitchen area (residential sink fridge

    May 19, 2005 · Penalty $800

    Resolve
  • Hazardous

    Work without permit. work noted: at cellar level erected partitions tocreate (3) rooms and installed water & waste lines for (3) piece bath-room (toilet,sink,shower) and residential sink. remedy: obtain permits

    Oct 15, 2004

    Resolve
  • Hazardous

    Work w/o permit: work without permit : work noted to basement level . partitions erected 2 bedrooms, living area, kithcen w/gas stove & bathroom w/ shower stall creating a class a apartment. remedy : obtain p

    Nov 21, 1999 · Penalty $800

    Resolve
  • Hazardous

    Residence altered for occupancy for more than the legally approved# of families. d.o.b. records indicate residence is legally approved for2 family dwelling. residencenow altered for 3 familys.

    Nov 21, 1999 · Penalty $3,050

    Resolve

Complaints

  • Heating

    Heat related

    Dec 15, 2011 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Dec 14, 2011 · Apt 2NDFL

    Close
  • Electric

    Electric-supply

    Dec 9, 2011 · Apt 2FL

    Close
  • Heating

    Heat related

    Dec 9, 2011 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Dec 9, 2011 · Apt 2FL

    Close
  • Electric

    Electric-supply

    Dec 6, 2011 · Apt 2FL

    Close
  • Electric

    Electric-supply

    Dec 6, 2011 · Apt 2FL

    Close
  • Electric

    Electric-supply

    Dec 6, 2011 · Apt 2FL

    Close
  • Heating

    Heat related

    Dec 6, 2011 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Dec 3, 2011 · Apt 2NDFL

    Close
Show 40 more ↓
  • Heating

    Heat related

    Dec 2, 2011 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Nov 27, 2011 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Nov 19, 2011 · Apt 2FL

    Close
  • Heating

    Heat related

    Nov 18, 2011 · Apt 2FL

    Close
  • Heating

    Heat related

    Nov 17, 2011 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Nov 14, 2011 · Apt 2FL

    Close
  • Heating

    Heat related

    Nov 13, 2011 · Apt 2FL

    Close
  • Heating

    Heat related

    Nov 7, 2011 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Nov 7, 2011 · Apt 2FL

    Close
  • Heating

    Heat related

    Oct 29, 2011 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Oct 28, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Sep 3, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Ceiling

    Sep 3, 2011 · Apt 2NDFL

    Close
  • General

    Floor

    Sep 3, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Sep 3, 2011 · Apt 2NDFL

    Close
  • Nonconst

    Vermin

    Sep 3, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Sep 3, 2011 · Apt 2NDFL

    Close
  • General

    Stairs

    Sep 3, 2011 · Apt 2NDFL

    Close
  • Construction

    Pavement

    Sep 3, 2011 · Apt 2NDFL

    Close
  • General

    Locks

    Sep 3, 2011 · Apt 2NDFL

    Close
  • General

    Locks

    Sep 3, 2011 · Apt 2NDFL

    Close
  • Nonconst

    Smoke detector

    Sep 3, 2011 · Apt 2NDFL

    Close
  • Nonconst

    Carbon monoxide

    Sep 3, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Ceiling

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Ceiling

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Nonconst

    Vermin

    Jul 11, 2011 · Apt 2NDFL

    Close
  • General

    Cabinet

    Jul 11, 2011 · Apt 2NDFL

    Close
  • General

    Floor

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Paint/plaster

    Ceiling

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Construction

    Pavement

    Jul 11, 2011 · Apt 2NDFL

    Close
  • General

    Stairs

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Nonconst

    Carbon monoxide

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Nonconst

    Smoke detector

    Jul 11, 2011 · Apt 2NDFL

    Close
  • Nonconst

    Illegal

    Apr 1, 2005 · Apt BSMT

    Close
  • Nonconst

    Vermin

    Mar 31, 2005 · Apt 2

    Close
  • General

    Windows

    Mar 31, 2005 · Apt 2

    Close
  • Heating

    Heat related

    Mar 31, 2005 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B1)
Year built
1925
Floors
2
Residential units
2
Building area
1,600 ft²
Lot area
2,300 ft²
Zoning
R5D
Community board
402
Council district
26
Block / lot
1299 / 44
Assessed value
$70,860
Landmark / historic district
No

Questions about 40-28 68 Street

Who owns 40-28 68 Street?

The owner of record in NYC Department of City Planning PLUTO data is Luis, Raymond.

Does 40-28 68 Street have violations?

Yes. NYC HPD has recorded 24 housing violations at this property.

Is 40-28 68 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 40-28 68 Street built?

City records list 1925 as the year it was built.

How many apartments are in 40-28 68 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.