97-01 24 Avenue
Queens, NY 11369BBL 4-01091-0044Map
Owner of record: Deutsche Bank National Trust Company, As Indenture
97-01 24 Avenue is a two-family home built in 1925 in Queens, 11369. It has 2 residential units across 2 floors. The owner of record is Deutsche Bank National Trust Company, As Indenture. HPD has recorded 137 housing violations here, most recently on November 25, 2025. 38 of the 50 most recent violations are still open.
- HPD violations
- 137
- DOB violations
- 9
- ECB violations
- 0
- HPD complaints
- 152
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 137
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2025
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall west wall in the 1st room from north at east located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling ceiling in the 1st room from north at east located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling ceiling in the 1st room from north at east located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 1 sq ft at ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west original violation 16597404 issued 16-jan-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 16, 2024 · Apt 1STFLO
Open — First no access to re- inspect violation - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 5th room from north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 4th room from north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from east at south wall in the 1st private hallway located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north at east located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective lower sash, inner glass pane at 1st window from east at south wall in the 5th room from north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective upper sash spring balance at 1st and 2nd window from south at west wall in the 4th room from north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper sash spring balance at 2nd window from south at west wall in the 3rd room from north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper sash spring balance at 1st and 2nd window from south at west wall in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeds the maximum allowable operating temperature of 130f. (143f found) in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in waste pipe at washbasin in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the 5th room from north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 2nd window frame from south at west wall, west wall, east wall in the 4th room from north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the 4th room from north located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall in the 1st room from north at east located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 1st room from north at east located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north at east located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north at east located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 1 sq ft at ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective upper window sash counterbalance at first window from south at west in the 4th room from north located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the kitchen located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective upper and lower window sash counterbalance at second window from south at west in the kitchen located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130f degrees at all hot water fixtures in the entire apartment located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department window sill at south wall 1st window frame from east at south wall in the 5th room from north located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department west wall north wall in the 4th room from north located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall east wall in the 4th room from north located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department metal heat riser pipe 1st riser from north at east wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department west wall west wall in the 1st room from north at east located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective upper and lower window sash counterbalance at second window from south at west in the 3rd room from north located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash glass pane at south wall in the 5th room from north located at apt 1stfl, 1st story, 1st apartment from south at west
Jan 16, 2024 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 13, 2024 · Apt 1STFLO
Closed — Violation closed
DOB building violations · 9
- Construction other optional
Failure to comply with commissioner's order:dob violation #122625feu40301ak (control #350406) which requires owner engage a nys pe&endrsd cntrctr to evaluate the entire bldg&repair or demolish the building under permit with permits filed for by 1/30/26.as of 2/9/26, no repair or demo jobs have been filed.comply w/commissioner's order
Feb 9, 2026
Dob violation - active - Construction other optional
Failure to comply w/commissioner's order:dob violation #122625feu40302ak (control#350407)which requires owner engage a nys pe &endrsd cntrctr to eval the entire bldg&repair or demo the bldg under permit w/permits filed for by 1/30/26.as of 2/9/26,no repair or demo jobs have been filed.comply w/commissioner's order
Feb 9, 2026
Dob violation - active - Immediate emergency anythingoptional
Remedy: seal all fire damaged and accessible openings to protect the public and property and prevent unauthorized entry
Dec 26, 2025
Dob violation - active - Immediate emergency anythingoptional
Remedy: seal all fire damaged and accessible openings to protect the public and property and prevent unauthorized entry
Dec 26, 2025
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Dec 26, 2025
Dob violation - active - Unsafe buildings none
Ub-unsafe buildings none
Dec 26, 2025
V%-dob violation - Construction other optional
Ftm-at time of inspection obsvd bldg to be in a state of disrepair w/ fire,water & smoke damage throughout.roof open & roof joist charred, exp3 wall charred,windows out.owner to engage nyspe endorsed cont'r to eval entire bldg& repr or demolish under permit,file for permit by 1/30/26
Dec 26, 2025
Dob violation - active - Construction other optional
Ftm-at time of inspection obsvd bldg to be in a state of disrepair w/ fire,water, & smoke damage throughout.roof open & roof joist charred, exp3 wall charred, windows out.owner to engage a nyspe endorsed cont'r to eval entire bldg repr or demolish under permit,file for permit by 1/30/26
Dec 26, 2025
Dob violation - active - Construction other optional
Structure rendered noncompliant due to fire that left roof, bldg unsaf e to occupy due to compromised roof remedy: vacate structure, seal public openings
Dec 25, 2025
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Apr 21, 2024 · Apt BLDG
Close - Plumbing
Water supply
Feb 9, 2024 · Apt FLOOR1
Close - Heat/hot water
Apartment only
Jan 14, 2024 · Apt 1STFL
Close - Heat/hot water
Apartment only
Jan 11, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Jan 10, 2024 · Apt 1STFLO
Close - Unsanitary condition
Pests
Jan 10, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Jan 8, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Jan 30, 2023 · Apt 2NDFLO
Close - Water leak
Damp spot
Jan 30, 2023 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Jan 30, 2023 · Apt 2NDFLO
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jan 28, 2023 · Apt SECOND
Close - Heat/hot water
Entire building
Jan 28, 2023 · Apt SECOND
Close - Heat/hot water
Entire building
Jan 27, 2023 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Dec 23, 2022 · Apt 2FLOOR
Close - Heat/hot water
Entire building
Dec 15, 2022 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Dec 9, 2022 · Apt 2FL
Close - Heat/hot water
Entire building
Dec 8, 2022 · Apt 2NDFLO
Close - Electric
No lighting
Dec 8, 2022 · Apt 2NDFLO
Close - Flooring/stairs
Stairs
Dec 8, 2022 · Apt 2NDFLO
Close - Flooring/stairs
Stairs
Dec 8, 2022 · Apt 2NDFLO
Close - General
Bell/buzzer/intercom
Dec 8, 2022 · Apt 2NDFLO
Close - Flooring/stairs
Stairs
Dec 8, 2022 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Dec 8, 2022 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Dec 8, 2022 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Dec 8, 2022 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Dec 7, 2022 · Apt 2FL
Close - Heat/hot water
Apartment only
Dec 4, 2022 · Apt 2
Close - Heat/hot water
Entire building
Dec 1, 2022 · Apt 2
Close - Heat/hot water
Apartment only
Nov 26, 2022 · Apt 2
Close - Heat/hot water
Entire building
Nov 21, 2022 · Apt 2NDFL
Close - Paint/plaster
Ceiling
Oct 7, 2022 · Apt FL2
Close - Paint/plaster
Ceiling
Oct 7, 2022 · Apt FL2
Close - Water leak
Slow leak
Oct 7, 2022 · Apt FL2
Close - Plumbing
Water supply
Sep 15, 2022 · Apt 2
Close - Heat/hot water
Apartment only
Sep 8, 2022 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Sep 5, 2022 · Apt 1STFLO
Close - Water leak
Heavy flow
Dec 20, 2018 · Apt 1FL
Close - Water leak
Heavy flow
Dec 20, 2018 · Apt 1FL
Close - Electric
Power outage
Dec 20, 2018 · Apt 1FL
Close - Paint/plaster
Ceiling
Dec 20, 2018 · Apt 1FL
Close - Paint/plaster
Ceiling
Dec 20, 2018 · Apt 1FL
Close - Paint/plaster
Ceiling
Dec 20, 2018 · Apt 1FL
Close - Unsanitary condition
Sewage
Jul 10, 2018 · Apt 1
Close - Plumbing
Bathtub/shower
Jul 10, 2018 · Apt 1
Close - Water leak
Slow leak
Jul 8, 2018 · Apt 1
Close - Water leak
Slow leak
Jul 8, 2018 · Apt 1
Close - Safety
Smoke detector
Apr 30, 2015 · Apt 1
Close - Safety
Carbon monoxide detector
Apr 30, 2015 · Apt 1
Close - Heating
Heat related
Jan 3, 2012 · Apt 2
Close - Heating
Heat related
Dec 8, 2011 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 2,408 ft²
- Lot area
- 4,000 ft²
- Zoning
- R3X
- Community board
- 403
- Council district
- 21
- Block / lot
- 1091 / 44
- Assessed value
- $50,400
- Landmark / historic district
- No
HPD registration #917705, last renewed Mar 31, 2026.
Questions about 97-01 24 Avenue
Who owns 97-01 24 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Deutsche Bank National Trust Company, As Indenture.
Does 97-01 24 Avenue have violations?
Yes. NYC HPD has recorded 137 housing violations at this property.
Is 97-01 24 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 97-01 24 Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 97-01 24 Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.