26-50 1st Street
Queens, NY 11102BBL 4-00916-0010Map
Owner of record: Halletts Building 3 Spe LLC
26-50 1st Street is an elevator apartment building built in 2023 in Queens, 11102. It has 294 residential units across 26 floors. The owner of record is Halletts Building 3 Spe LLC. HPD has recorded 1 housing violation here, most recently on June 16, 2025.
- HPD violations
- 1
- DOB violations
- 5
- ECB violations
- 13
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed
DOB building violations · 5
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Nov 12, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 13
- Class - 2
Bc3307.2.1_at time of inspection on a active jobsite- 26 story nb,i observed that at exp#1 1st street, the roadway being occupied/closed by barricades.no active dot permit obtained to occupy/close the roadway
Jul 31, 2024 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection observed adt access system/outrigger beams suspended scaffold installed at roof contrary to plans-tieback going in angle without opposing tieback , tiebacks wrapped single time arou
Mar 22, 2024
Resolve - Class - 2
At time of inspection on an active jobsite of a 31story nb, observed sws at exp#1 (1st street). upon request for the installation letter and 6 month inspection for the sws none was provided/available.provide &
Mar 6, 2024 · Penalty $2,500
Resolve - Class - 1
At time of audit, the equipment user could not provide frequent inspection records for tower crane cd 4607 cn 94222. the tower crane was in operation on 11/7 and 11/6(as evidenced by pre-shift meeting logs), an
Nov 8, 2023 · Penalty $5,000
Resolve - Class - 2
Upon inspection of a non active proposed 31 story nb i observed a sidewalk shed installed at exposure 1 with no project info panel provided contrary to bc3301.9.2 where a sidewalk shed is installed, a sidewalk
Oct 7, 2023 · Penalty $1,250
Resolve - Class - 2
Proposed 31 story nb, i observed active superstructure phase, with north tower currently forming 19floor and south tower forming 8floor. upon request to view standpipe(sd) hydrostatic test at 175feet, as requir
Jun 21, 2023
Resolve - Class - 2
Proposed 31 story nb, currently tower 20(north) on 11floor and tower 30 on 4 floor. observed ulma loading platform at exp3 of north tower installed contrary to drawings that show shoring on all floors below. ha
May 17, 2023
Resolve - Class - 2
Proposed 31 story nb, i observed entire sidewalk at exp1 closed, and all pedestrian traffic redirected to opposite sidewalk with flaggers. upon reviewing the dot permits, they show that signage must be provided
May 17, 2023
Resolve - Class - 1
At the tine of my inspection of a new building north tower 26 story and south tower 31 story, responding to an incident reported by site safety manager that worker slip and fell while going up the stairs with p
Apr 26, 2023 · Penalty $2,500
Resolve - Class - 1
Failed to notify dept of incident that resulted in fatality or injury.note:worker struck in shoulder when post rolled off truck worker taken to hospital.as per check of dept records permit holder failed to noti
Oct 20, 2022 · Penalty $5,000
Resolve
Show 3 more ↓
- Class - 1
At time of inspection it was stated that worker ( flagger ) while standing on side of scaffold truck was hit by brace that rolled off top of truck hit her in head and right shoulder causing injury . failure to
Sep 27, 2022
Resolve - Class - 1
Failure to proper notification to the department of the primary manager or coordinator. the permitholder failed to notify the department for alternate site safety manager for more than two consecutive weeks in
Jun 14, 2022
Resolve - Non-hazardous
Work without a permit.upon inspection of above address building was demolished.dob records show no permit was issued.rem:obtain permit.
Oct 23, 2000 · Penalty $2,500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2023
- Floors
- 26
- Residential units
- 294
- Building area
- 362,533 ft²
- Lot area
- 147,926 ft²
- Zoning
- R7-3
- Community board
- 401
- Council district
- 22
- Block / lot
- 916 / 10
- Assessed value
- $28,714,050
- Landmark / historic district
- No
HPD registration #434512, last renewed Jun 2, 2025.
Questions about 26-50 1st Street
Who owns 26-50 1st Street?
The owner of record in NYC Department of City Planning PLUTO data is Halletts Building 3 Spe LLC.
Does 26-50 1st Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 26-50 1st Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 26-50 1st Street built?
City records list 2023 as the year it was built.
How many apartments are in 26-50 1st Street?
It has 294 residential units and 295 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.