22-46 31 Street
Queens, NY 11105BBL 4-00844-0055Map
Owner of record: Qn Realty, LLC
22-46 31 Street is a walk-up apartment building built in 1926 in Queens, 11105. It has 7 residential units across 4 floors. The owner of record is Qn Realty, LLC. HPD has recorded 41 housing violations here, most recently on May 6, 2026. 13 of the 41 most recent violations are still open.
- HPD violations
- 41
- DOB violations
- 14
- ECB violations
- 6
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 4 b, 4th story, 1st apartment from south at west
Dec 8, 2021 · Apt 4 B
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures no cooking gas to stove. in the kitchen located at apt 4 b, 4th story, 1st apartment from south at west
Dec 8, 2021 · Apt 4 B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system inadequate hot water temp. of 58 degrees. key lock entry door to cellar leading to boiler room. cause unknown. at boiler room
Dec 8, 2021
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3 b, 3rd story, 1st apartment from south at west
Dec 8, 2021 · Apt 3 B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system ... boiler door locked
Dec 4, 2021
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at stove located at apt 3a, 3rd story
Dec 4, 2021 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors entrance to apartment located at apt 3a, 3rd story
Dec 4, 2021 · Apt 3A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 3a, 3rd story
Dec 4, 2021 · Apt 3A
Open — Nov sent out
Show 31 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 3a, 3rd story
Dec 4, 2021 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system ...door locked to boiler
Dec 4, 2021
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures located at apt 3a, 3rd story
Dec 4, 2021 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ,, in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Dec 1, 2020 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ,, in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Dec 1, 2020 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 4a, 4th story, 1st apartment from south at west
Aug 22, 2020 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment .. in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Aug 22, 2020 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment .. in the entire apartment located at apt 4b, 4th story, 1st apartment from east at south
Aug 22, 2020 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment .. in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east
Aug 22, 2020 · Apt 4C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Aug 22, 2020
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Feb 18, 2020
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2019
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4a, 4th story, 1st apartment from south at west
Nov 29, 2016 · Apt 4A
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2016
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at stove in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at north
Nov 14, 2016 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at the gas range in the kitchen located at apt 4c, 4th story, 1st apartment from east at south
Nov 3, 2016 · Apt 4C
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of baby strollers, scooters and other house hold items at public hall, 1st story
Nov 3, 2016
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of brick wall erected rear yard obstructing egress from rear fire escape.
Oct 7, 1991
Open — Not complied with - BHazardous
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the north court.
Oct 7, 1991
Closed — Violation closed - BHazardous
Properly repair the broken or defective lower window sash counter balance northeast room north window 4 sty apt 9. located at apt 9
Oct 7, 1991 · Apt 9
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots etc 3 sty balcony at front.
Jun 19, 1991
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective water proofing tar flashing south parapet wall at roof.
Jun 19, 1991
Closed — Violation closed - BHazardous
D26-10.01 adm code & 309 m/d law abate the nuisance consisting of iron gate north court obstructing egress from rear fire escape.
Jun 19, 1991
Closed — Violation closed - BHazardous
D26-10.01 adm code properly secure the loose glass lower sash bathroom 4 sty south apt 8. located at apt 8
Jun 19, 1991 · Apt 8
Closed — Violation closed - BHazardous
D26-16.01 adm code repair the leaky and/or defective faucets washbasin bathroom 4 sty south apt 8. located at apt 8
Jun 19, 1991 · Apt 8
Closed — Violation closed - BHazardous
D26-20.08 adm code repair or replace the smoke detector missing 3 sty east apt 4. located at apt 4
Jun 19, 1991 · Apt 4
Closed — Violation closed - BHazardous
D26-20.08 adm code repair or replace the smoke detector defective 4 sty south apt 8. located at apt 8
Jun 19, 1991 · Apt 8
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code remove all encumbrances consisting of consisting of ladders glass containers & other household items bulkhead landing at roof.
Jun 19, 1991
Closed — Violation closed - CImmediately hazardous
D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system notice missing 1 sty vestibule & rear entrance to cellar rear yard.
Jun 19, 1991
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective masonry south wall boiler room.
Jun 19, 1991
Closed — Violation closed - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color clg & walls pub hall bulkhead.
Jun 19, 1991
Closed — Violation closed
DOB building violations · 14
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 18, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 18, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 20, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
Show 4 more ↓
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
ECB violations · 6
- Class - 1
Unlawfully continued owrk while on notice of a stop work order observed on 3/18/16 at 3pm plumbing inspection in process.inspection appl 440115849. stop all work issued.partial plumbing entire.rmdy:comply w/
Mar 18, 2016
Resolve - Class - 1
Tampered-removed,defaced swo posted. observed on 3/18/16 at 2:55pm no posted swo on premises-no sticker on, f/door.photos taken. rmdy: comply with code.
Mar 18, 2016
Resolve - Class - 1
Work w/o a permit:installation of gas piping insp time: 11:00.on 8/21/15 i observed in cellar new 3/4"gas piping w/ fresh pipe lubricatn from meters 2a,3a,3b,3c,4b,&4c.approx 100ft plus was installed.there is n
Aug 21, 2015 · Penalty $1,600
Resolve - Class - 1
Gas being supplied w/o insp & testin by dob.insp time 11:00.on 08/21/15,i observed in cellar of above cited premises new 3/4"gas piping w/ fresh pipe lubricant from meters marked 2a,3a,3b,3c,4b&4c.approx 100ft
Aug 21, 2015 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.noted:@ 2nd fl(#2a)smoke/carbon monoxide detector has been removed(the only s/c detector oin the apt)rem:repair or replace.
Aug 18, 2014 · Penalty $250
Resolve - Unknown
Occupancy contrary to the c of o from garage to storage of building materials and commercial vehicles. remedy discontinue illegal use
Nov 16, 1989 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Mar 2, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 4A
Close - Door/window
Door
Apr 12, 2024 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Apr 12, 2024 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Apr 12, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Mar 17, 2022 · Apt 4C
Close - Heat/hot water
Entire building
Dec 8, 2021 · Apt ALLAPP
Close - Heat/hot water
Entire building
Dec 5, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2021 · Apt ALLAPP
Close - Heat/hot water
Entire building
Dec 4, 2021 · Apt ALLAPP
Close
Show 24 more ↓
- Heat/hot water
Apartment only
Dec 3, 2021 · Apt A3
Close - Heat/hot water
Entire building
Dec 3, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2021 · Apt 2A
Close - Heat/hot water
Entire building
Apr 16, 2018 · Apt 4
Close - Heat/hot water
Entire building
Dec 15, 2016 · Apt BLDG
Close - General
Cooking gas
Dec 10, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2016 · Apt BLDG
Close - General
Cooking gas
Nov 22, 2016 · Apt 3A
Close - General
Cooking gas
Nov 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2016 · Apt 3A
Close - Heat/hot water
Entire building
Nov 22, 2016 · Apt BLDG
Close - General
Cooking gas
Nov 11, 2016 · Apt 3C
Close - Heat/hot water
Entire building
Nov 11, 2016 · Apt 3C
Close - Heat/hot water
Entire building
Nov 5, 2016 · Apt 2A
Close - Heat/hot water
Entire building
Oct 28, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2016 · Apt BLDG
Close - Appliance
Electric/gas range
Oct 26, 2016 · Apt 4C
Close - Heat/hot water
Apartment only
Oct 26, 2016 · Apt 4C
Close - Plumbing
Water supply
Dec 30, 2010 · Apt REAR
Close - Plumbing
Water supply
Dec 30, 2010 · Apt REAR
Close - General
Windows
Feb 23, 2007 · Apt 6
Close - General
Windows
Feb 23, 2007 · Apt 6
Close - General
Windows
Feb 23, 2007 · Apt 6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1926
- Floors
- 4
- Residential units
- 7
- Building area
- 7,000 ft²
- Lot area
- 2,424 ft²
- Zoning
- C4-2A
- Community board
- 401
- Council district
- 22
- Block / lot
- 844 / 55
- Assessed value
- $737,100
- Landmark / historic district
- No
HPD registration #411386, last renewed Jun 17, 2025.
Questions about 22-46 31 Street
Who owns 22-46 31 Street?
The owner of record in NYC Department of City Planning PLUTO data is Qn Realty, LLC.
Does 22-46 31 Street have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 22-46 31 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 22-46 31 Street built?
City records list 1926 as the year it was built.
How many apartments are in 22-46 31 Street?
It has 7 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.