22-11 31 Street
Queens, NY 11105BBL 4-00833-0024Map
Owner of record: Ditmars 22-11 LLC
22-11 31 Street is a store building built in 2022 in Queens, 11105. The owner of record is Ditmars 22-11 LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 24
- ECB violations
- 14
- HPD complaints
- 35
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 24
- Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2014
Dob violation - resolved
Show 14 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 9, 2010
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2004
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2003
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 14
- Class - 2
Missing 2 way video comm as per 2022 building code , provide
Sep 17, 2025 · Penalty $625
Resolve - Class - 1
In response to incident of worker fell off man/scissor lift taken to off site medical facility @active site, upon review todays pre-shift/task safety meeting, injury form, site specific safety orientations i ob
Aug 8, 2023
Resolve - Class - 1
Genie gs-1930 scissor lift.in response to incident of worker fell off man-scissor lift@active site, observe site fail to ensure user comply with manufacture specs-worker not wearing safety harness&tied to platf
Aug 8, 2023
Resolve - Non-hazardous
49a no check valve(back flow prevent)on boiler feed line
May 21, 2001
Resolve - Hazardous
Failure to maintain exterior bldg wall. defect is: cracked masonry wall located at end wall of between 1st & 2nd story level. the size of the crack is approx 20'x3/8". remedy: make safe immediately.
Jan 27, 1998 · Penalty $800
Resolve - Non-hazardous
Work without a permit.at roof cut hole to attached steel table legs tosupport air conditioner/fan."stop all work"remedy:file obtain permits forthwith.
Jun 12, 1996 · Penalty $175
Resolve - Hazardous
Failure to maintain-entire plaster + lath ceiling collapsed into 2nd fl.remedy:make safe immediately-obtain permits to restore forthwith.
Jun 12, 1996 · Penalty $800
Resolve - Hazardous
Construction--exhaust systems: inaccordance dob subchapter 12 and rs-13-2. noted: required mechanical kitchen exhaust systems dosen't conform to department rules & regulations. exhaust blower erected----
Jun 28, 1995
Resolve - Hazardous
Work without a permit--creating a hazardous condition. noted: the required fire seperation from first floor to cellar area has been removed. creating a combined use first floor/cellar--prep room, other
Jun 28, 1995 · Penalty $800
Resolve - Hazardous
Occupancy contrary to department of buildings records. noted: combining of first story resturant with cellar area. location dba dragon pheonix resturant. remedy: discontinue illegal occupancy. obtain a
Jun 28, 1995 · Penalty $800
Resolve
Show 4 more ↓
- Hazardous
Failure to maitain: interior--noted: the required fire rated ceilingfloor assembly in cellar area is broken, missing and defective creating a hazardous condition. cellar area: prep kitchen, employee
Jun 28, 1995 · Penalty $800
Resolve - Non-hazardous
Occupancy contrary to department of buildings records. remedy: obtaina valid certificate of occupancy discontinue illegal occupancy or dis-continue illegal occupancy until a c of o is obtained.
Jun 28, 1995 · Penalty $800
Resolve - Hazardous
Construction (a)air conitioning systems(c)exhaust systems(mechanical sxhause)have been installed at the roof without required steel support dummage as per department rules & regulations *1-york #2cbu218606a.(40
Jun 28, 1995 · Penalty $175
Resolve - Non-hazardous
Boiler base is rusting out.
Feb 2, 1989
Resolve
Complaints
- Unsanitary condition
Pests
Aug 8, 2025 · Apt 4
Close - Heat/hot water
Entire building
Jan 27, 2025 · Apt BLDG
Close - Electric
Power outage
Mar 17, 2024 · Apt 3A
Close - Plumbing
Water supply
Jan 17, 2024 · Apt 401
Close - Unsanitary condition
Garbage/recycling storage
Dec 14, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2023 · Apt 402
Close - Heat/hot water
Entire building
Jan 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2022 · Apt BLDG
Close
Show 25 more ↓
- Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 10, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Nov 19, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 19, 2022 · Apt 1B
Close - Heat/hot water
Entire building
Jan 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2022 · Apt 306
Close - Unsanitary condition
Pests
Nov 1, 2021 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Nov 1, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 25, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 25, 2021 · Apt A1
Close - Heat/hot water
Apartment only
Oct 31, 2020 · Apt 305
Close - Heat/hot water
Entire building
Oct 30, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 15, 2020 · Apt 305
Close - Heat/hot water
Apartment only
Nov 16, 2019 · Apt 305
Close - Heat/hot water
Apartment only
Nov 16, 2019 · Apt 305
Close - Heat/hot water
Apartment only
Nov 14, 2019 · Apt 305
Close - Heat/hot water
Apartment only
Nov 13, 2019 · Apt 305
Close - Heat/hot water
Apartment only
Nov 12, 2019 · Apt 305
Close - Plumbing
Water supply
Jun 13, 2018 · Apt 504
Close - Heat/hot water
Entire building
Mar 5, 2016 · Apt BLDG
Close - Water leak
Heavy flow
Aug 11, 2015 · Apt 502
Close - Water leak
Heavy flow
Aug 11, 2015 · Apt 502
Close - Unsanitary condition
Garbage/recycling storage
Jun 9, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2014 · Apt F4
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K2)
- Year built
- 2022
- Floors
- —
- Residential units
- —
- Building area
- 84,454 ft²
- Lot area
- 29,129 ft²
- Zoning
- C4-2A
- Community board
- 401
- Council district
- 22
- Block / lot
- 833 / 24
- Assessed value
- $12,048,750
- Landmark / historic district
- No
Questions about 22-11 31 Street
Who owns 22-11 31 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ditmars 22-11 LLC.
Does 22-11 31 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 22-11 31 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 22-11 31 Street built?
City records list 2022 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.