43-03 Broadway
Queens, NY 11103BBL 4-00693-0007Map
Owner of record: 43-03 Broadway LLC
43-03 Broadway is a mixed residential and retail building built in 1928 in Queens, 11103. It has 2 residential units across 3 floors. The owner of record is 43-03 Broadway LLC. HPD has recorded 30 housing violations here, most recently on June 16, 2012. 30 of the 30 most recent violations are still open.
- HPD violations
- 30
- DOB violations
- 32
- ECB violations
- 2
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 3, 3rd story
Jun 16, 2012 · Apt 3
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at street entrance door to building
Jun 16, 2012
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at vestibule door 1st story public hall
Jun 16, 2012
Open — Nov sent out - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 3, 3rd story
Jun 16, 2012 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 4th room from east located at apt 3fl, 3rd story, 1st apartment from west at north
May 28, 2010 · Apt 3FL
Open — Nov sent out - ANon-hazardous
Refit all windows throughout in the entire apartment located at apt 3fl, 3rd story, 1st apartment from west at north
May 28, 2010 · Apt 3FL
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 3fl, 3rd story, 1st apartment from west at north
May 28, 2010 · Apt 3FL
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key operated double cylinder locking mechanism at front door entrance to building
May 28, 2010
Open — Nov sent out - BHazardous
Properly repair the broken or defective key operated locking mechanism at front door entrance to building
May 28, 2010
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked
May 28, 2010
Open — Nov sent out
Show 20 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
May 28, 2010
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ...
May 28, 2010
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ...
May 28, 2010
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 28, 2010
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over 4th room from east located at apt 3fl, 3rd story, 1st apartment from west at north
May 28, 2010 · Apt 3FL
Open — Nov sent out - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ...
May 28, 2010
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of cut hazard of broken glass at vestibule door
Apr 4, 2008
Open — Nov sent out - ANon-hazardous
Refit front door entrance to building
Apr 4, 2008
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Apr 4, 2008 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin bed bugs in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Apr 4, 2008 · Apt 3
Open — Nov sent out - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the trash and debris at public hall all stys
Apr 4, 2008
Open — Nov sent out - ANon-hazardous
Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations.
Apr 4, 2008
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ...
Apr 4, 2008
Open — Nov sent out - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ...
Apr 4, 2008
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ...
Apr 4, 2008
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Apr 4, 2008
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to building
Apr 4, 2008
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to vestibule
Apr 4, 2008
Open — Nov sent out - BHazardous
Properly repair the broken or defective entrance door lock to building at public hall, 1st story
Aug 9, 2001
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder keyed operative lock vestibule entrance door at public hall, 1st story
Aug 9, 2001
Open — Nov sent out
DOB building violations · 32
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 22 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active
ECB violations · 2
- Class - 2
50 as per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per d.o.b. records. submit a current b0-9 report correct all violating condition and submit the certificate of correction
May 6, 2016 · Penalty $500
Active - Non-hazardous
Work without a permit-full gut all floors-new electric-new ceilings walls new plumbing-all fire stopping removed 5 floor joist at 3rd floor cut-stair case all floors open-"stor all work" remedy submit plans for
Jan 4, 1994 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 25, 2015 · Apt 2FL
Close - Heating
Heat related
Nov 22, 2013 · Apt 2NDFL
Close - Electric
Wiring
Nov 22, 2013 · Apt 2F
Close - General
Doors
Nov 22, 2013 · Apt 2F
Close - General
Locks
Nov 22, 2013 · Apt 2F
Close - Nonconst
Vermin
Nov 22, 2013 · Apt 2F
Close - Nonconst
Vermin
Nov 22, 2013 · Apt 2F
Close - General
Floor
Nov 22, 2013 · Apt 2F
Close - General
Windows
Nov 22, 2013 · Apt 2F
Close - General
Windows
Nov 22, 2013 · Apt 2F
Close
Show 25 more ↓
- General
Doors
Nov 22, 2013 · Apt 2F
Close - Electric
Electric-supply
Nov 22, 2013 · Apt 2F
Close - Plumbing
Basin/sink
Nov 22, 2013 · Apt 2F
Close - Plumbing
Basin/sink
Nov 22, 2013 · Apt 2F
Close - Plumbing
Toilet
Nov 22, 2013 · Apt 2F
Close - Plumbing
Water-leaks
Nov 22, 2013 · Apt 2F
Close - Heating
Heat related
Nov 22, 2013 · Apt 2
Close - General
Doors
Nov 21, 2013 · Apt 2F
Close - General
Floor
Nov 21, 2013 · Apt 2F
Close - Heating
Heat related
Nov 21, 2013 · Apt 2F
Close - Electric
Lighting
Nov 21, 2013 · Apt 2F
Close - General
Windows
Nov 21, 2013 · Apt 2F
Close - General
Windows
Nov 21, 2013 · Apt 2F
Close - Heating
Heat related
Nov 21, 2013 · Apt 2
Close - Nonconst
Vermin
May 27, 2012 · Apt 3
Close - Nonconst
Vermin
Mar 28, 2012 · Apt 3
Close - General
Doors
May 25, 2010 · Apt 3FL
Close - General
Locks
May 25, 2010 · Apt 3FL
Close - Plumbing
Water supply
May 25, 2010 · Apt 3FL
Close - Heating
Heat related
May 25, 2010 · Apt 3FL
Close - General
Doors
Apr 1, 2008 · Apt 3
Close - General
Mailbox
Apr 1, 2008 · Apt 3
Close - Appliance
Electric/gas range
Apr 1, 2008 · Apt 3
Close - Nonconst
Vermin
Feb 21, 2008 · Apt 3
Close - Nonconst
Vermin
Feb 21, 2008 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1928
- Floors
- 3
- Residential units
- 2
- Building area
- 4,010 ft²
- Lot area
- 1,600 ft²
- Zoning
- R6B
- Community board
- 401
- Council district
- 22
- Block / lot
- 693 / 7
- Assessed value
- $138,600
- Landmark / historic district
- No
Questions about 43-03 Broadway
Who owns 43-03 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 43-03 Broadway LLC.
Does 43-03 Broadway have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 43-03 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 43-03 Broadway built?
City records list 1928 as the year it was built.
How many apartments are in 43-03 Broadway?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.