roofy

40-19 Broadway

Queens, NY 11103BBL 4-00678-0001Map

Owner of record: 31-90 41st Street LLC

40-19 Broadway is a mixed residential and retail building built in 1935 in Queens, 11103. It has 4 residential units across 3 floors. The owner of record is 31-90 41st Street LLC. HPD has recorded 8 housing violations here, most recently on April 15, 2021.

HPD violations
8
DOB violations
5
ECB violations
6
HPD complaints
37

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 15, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 8

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ''missing'' at public hall, 1st story

    Dec 18, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 18, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 18, 2018

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Dec 18, 2018

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story

    Nov 21, 2018 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story

    Nov 21, 2018 · Apt 3R

    Closed — Violation dismissed
  • B

    Replace the broken or defective radiator in the 4th bedroom from north located at apt 3r, 3rd story

    Nov 21, 2018 · Apt 3R

    Closed — Violation dismissed

DOB building violations · 5

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 23, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 27, 1995

    Vw-violation work without permit - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - dismissed

ECB violations · 6

  • Class - 1

    Work does not conform to approved const docs or approved amendments.observed on june 4 2015 @5:15 pm in cellar 1" back from device installed-permit is for app#410267991 *photos taken* work in cellar.rem:conform

    Jun 4, 2015 · Penalty $1,030

    Resolve
  • Hazardous

    Use of rigging equipment w/o proper danger signs. workers on 2 point suspension scaffold with above infraction

    Jun 10, 2006 · Penalty $500

    Resolve
  • Hazardous

    Suspervision of use of rigging equipment w/o a special riggers license. workers on two point with above infraction

    Jun 10, 2006 · Penalty $500

    Resolve
  • Non-hazardous

    Work without permit: upon inspection the following plumbing work have occurred installing water supply line at basement to 1st floor store, re-route waste line at basement and working on gas line. department

    Sep 27, 1995 · Penalty $350

    Resolve
  • Non-hazardous

    Work without permit- partitions in basemont decorative soffet, railings & columns and various other alterations including mute system, being installed without permits issued from this dept. remedy: stop all wor

    Sep 27, 1995 · Penalty $350

    Resolve
  • Non-hazardous

    Work without permit. new bx cable high hats, recopticles switches being installed without permits issued from this dept. remedy: stop all electrical work obtain required permits.

    Sep 27, 1995 · Penalty $350

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Nov 20, 2018 · Apt 3R

    Close
  • Plumbing

    Boiler

    Nov 20, 2018 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2018 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 17, 2013 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 23, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 11, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Mar 8, 2011 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 5, 2011 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 4, 2011 · Apt 3L

    Close
  • Heating

    Heat related

    Dec 13, 2010 · Apt 3L

    Close
Show 27 more ↓
  • Heating

    Heat related

    Dec 11, 2010 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 11, 2010 · Apt 3L

    Close
  • Heating

    Heat related

    Dec 6, 2010 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 6, 2010 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 5, 2010 · Apt 3L

    Close
  • Heating

    Heat related

    Dec 4, 2010 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 15, 2010 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 15, 2010 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 25, 2009 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 10, 2008 · Apt 3R

    Close
  • Heating

    Heat related

    Oct 30, 2008 · Apt 3R

    Close
  • Heating

    Heat related

    Oct 30, 2008 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 9, 2006 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 3, 2006 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 5, 2005 · Apt 2R

    Close
  • Heating

    Heat related

    Dec 1, 2005 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 27, 2005 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 22, 2005 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 15, 2005 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 15, 2005 · Apt 3L

    Close
  • Heating

    Heat related

    Jan 15, 2005 · Apt 2R

    Close
  • Heating

    Heat related

    Dec 4, 2004 · Apt 2R

    Close
  • Heating

    Heat related

    Nov 14, 2004 · Apt 2R

    Close
  • Heating

    Heat related

    Nov 14, 2004 · Apt 2R

    Close
  • Heating

    Heat related

    Nov 12, 2004 · Apt 2R

    Close
  • Heating

    Heat related

    Oct 23, 2004 · Apt 3L

    Close
  • General

    Windows

    Jan 30, 2004 · Apt 3R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S4)
Year built
1935
Floors
3
Residential units
4
Building area
5,100 ft²
Lot area
2,500 ft²
Zoning
R6B
Community board
401
Council district
22
Block / lot
678 / 1
Assessed value
$775,350
Landmark / historic district
No

HPD registration #402471, last renewed Jul 8, 2025.

Questions about 40-19 Broadway

Who owns 40-19 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is 31-90 41st Street LLC.

Does 40-19 Broadway have violations?

Yes. NYC HPD has recorded 8 housing violations at this property.

Is 40-19 Broadway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 40-19 Broadway built?

City records list 1935 as the year it was built.

How many apartments are in 40-19 Broadway?

It has 4 residential units and 5 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.