31-28 38 Street
Queens, NY 11103BBL 4-00657-0052Map
Owner of record: 31-28 38th Street LLC
31-28 38 Street is a walk-up apartment building built in 2019 in Queens, 11103. It has 7 residential units across 4 floors. The owner of record is 31-28 38th Street LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 3
- ECB violations
- 12
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
The boro commissioner has ordered stop work immediately for application # 421396901 due to general contractor withdrawal. could not determine percentage of work completed.
May 5, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed
ECB violations · 12
- Class - 1
Bc3309.10 failure to provide roof protection for adjoining property asrequired.note:at time of my inspection of a 4 story bldg at 2nd fl level under construction.i observed exp-2 adjacent property roof not prot
Sep 24, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3314.1 failure to maintain pipe scaffold-no guardrails,no toe board.note:at time of my inspection observed pipe scaffold installed on 2nd fl level very closed to perimeter edge w/no guardrails,no toeboard pro
Sep 24, 2021 · Penalty $2,500
Resolve - Class - 2
Housekeeping.note:at time of my inspection of a 4 story bldg at 2nd fllevel under construction.i observed inadequate housekeeping has not been maintain as required.the construction materials debris throughout a
Sep 24, 2021
Resolve - Class - 2
Failure to safeguard all person & property effected by construction.note:at time of my inspection of a 4 story bldg at 2nd fl level under construction.i observed exp.-2 & 4 adjacent property damage conditions
Sep 24, 2021
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails.note:at time of my inspection of a 4 story bldg at 2nd fl level,under construction.i observed 2nd fl level stairs
Sep 24, 2021 · Penalty $2,500
Resolve - Class - 1
Sidewalk shed not place where required at the time of inspection of a proposed 4 story building with bulkhead observed structural steel in place at approximately 15ft height at exp#1 and corners of exp#2 and #4
Jun 22, 2021 · Penalty $10,000
Resolve - Class - 1
Bc 3307.7 construction fence not maintained-aggravated condition at the time of inspection of a proposed 4 story building with bulkhead observed structural steel in place reaching approx 15ft height at exp#1.ob
Jun 22, 2021 · Penalty $6,250
Resolve - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection at the time of my inspection on a proposed 4 story building with steel in place approxmately 15 ft observed constructed fence at exposure #1 no
Dec 28, 2020 · Penalty $500
Resolve - Class - 2
Bc3303.4.1.1-failure to maintain sidewalk exposure #1 at the time of inspection on a proposed 4 story new building with steel in place approxmately 15 ft observed concrete sidewalk unleveled with cracks creatin
Dec 28, 2020 · Penalty $620
Resolve - Class - 1
Site safety training.at time of inspection of an active jobsite i requested to speak to the designated competent person onsite.an individual(luis pena)was confirmed to bath comp person onsite as noted on the co
Jan 3, 2020 · Penalty $25,000
Active
Show 2 more ↓
- Class - 1
Bc 3313.1 flammable of combustible mixture compressed gases & other hazardous material. as noted: @time of inspection @an active construction site, observed @exp#3(rear side) on grade lvl, two tanks of acetylen
Nov 6, 2019 · Penalty $2,500
Resolve - Class - 2
Work without a permit: expired permit. 8 ft construction fence erectedunder job# q00110901 issued 1/10/19 and expired on 2/28/19. remedy: renew permit
Mar 22, 2019 · Penalty $6,250
Active
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 2019
- Floors
- 4
- Residential units
- 7
- Building area
- 5,340 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 401
- Council district
- 22
- Block / lot
- 657 / 52
- Assessed value
- $322,200
- Landmark / historic district
- No
Questions about 31-28 38 Street
Who owns 31-28 38 Street?
The owner of record in NYC Department of City Planning PLUTO data is 31-28 38th Street LLC.
Does 31-28 38 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 31-28 38 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 31-28 38 Street built?
City records list 2019 as the year it was built.
How many apartments are in 31-28 38 Street?
It has 7 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.