32-14 Steinway Street
Queens, NY 11103BBL 4-00656-0042Map
Owner of record: Gojo Realty LLC
32-14 Steinway Street is a store building built in 1930 in Queens, 11103. It has 4 residential units across 3 floors. The owner of record is Gojo Realty LLC. HPD has recorded 63 housing violations here, most recently on September 13, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 63
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 12
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 63
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at, 1st story
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox, 1st story
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Open — Info nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement at boiler room
Oct 31, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 31, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 31, 2025
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Oct 31, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 31, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Oct 31, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north located at apt 3a, 3rd story, 1st apartment from south at west
Oct 31, 2025 · Apt 3A
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Oct 31, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Oct 31, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing at public hall, 1st story
Sep 6, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Sep 6, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Sep 6, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Sep 6, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Sep 6, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 6, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 6, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Aug 24, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Aug 24, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 24, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 24, 2025
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures throughout in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Aug 24, 2025 · Apt 3B
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 24, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Aug 24, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Aug 24, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 20, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Jun 20, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jun 20, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 20, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jun 20, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Jun 20, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Jun 20, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
May 20, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar. at boiler room
May 20, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
May 20, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
May 20, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceding 130 degree farhrenheit in the kitchen and bathroom. in the entire apartment located at apt 3a, 2nd story, 1st apartment from south at west
May 17, 2025 · Apt 3A
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 17, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
May 17, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 17, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 17, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 17, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
May 17, 2025
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
3301.9.2.1(1) inadequate sws info panel atoi observed sws installed@exp1 of 32-14steinwayst w/permitq00636950 w/inadequate info panel donot comply w/code no insert address on it.comply w/code
Dec 4, 2021 · Penalty $6,250
Active
Complaints
- Heat/hot water
Apartment only
Sep 4, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Apr 18, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 13, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 28, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Sep 4, 2025 · Apt 2R
Close - Plumbing
Water supply
Jun 25, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Jun 17, 2025 · Apt APT2R
Close - Heat/hot water
Entire building
Jun 13, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
May 19, 2025 · Apt 2B
Close
Show 2 more ↓
- Heat/hot water
Entire building
May 16, 2025 · Apt REARAP
Close - Heat/hot water
Entire building
Nov 20, 2021 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1930
- Floors
- 3
- Residential units
- 4
- Building area
- 7,812 ft²
- Lot area
- 4,500 ft²
- Zoning
- C4-2A
- Community board
- 401
- Council district
- 22
- Block / lot
- 656 / 42
- Assessed value
- $688,950
- Landmark / historic district
- No
HPD registration #431938, last renewed Sep 6, 2016.
Questions about 32-14 Steinway Street
Who owns 32-14 Steinway Street?
The owner of record in NYC Department of City Planning PLUTO data is Gojo Realty LLC.
Does 32-14 Steinway Street have violations?
Yes. NYC HPD has recorded 63 housing violations at this property.
Is 32-14 Steinway Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 32-14 Steinway Street built?
City records list 1930 as the year it was built.
How many apartments are in 32-14 Steinway Street?
It has 4 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.