32-57 38 Street is an elevator apartment building built in 2017 in Queens, 11103. It has 10 residential units across 4 floors. The owner of record is Fourels Associates, LLC. HPD has recorded 11 housing violations here, most recently on February 10, 2026.

HPD violations
11
DOB violations
5
ECB violations
40
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Feb 10, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 11

  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from east located at apt 1b lower level, 1st story, 1st apartment from north at east

    Feb 10, 2026 · Apt 1B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 1b lower level, 1st story, 1st apartment from north at east

    Feb 10, 2026 · Apt 1B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the 1st bathroom from east located at apt 1b lower level, 1st story, 1st apartment from north at east

    Feb 10, 2026 · Apt 1B

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jan 14, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Jan 14, 2026

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jan 14, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jan 14, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Jan 14, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Jan 14, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jan 14, 2026

    Closed — Violation dismissed
Show 1 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 16, 2025

    Closed — Violation dismissed

DOB building violations · 5

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 17, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 10, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 9, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 9, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 29, 2019

    Dob violation - dismissed

ECB violations · 40

  • Class - 1

    Unlawfully continued work while on notice of partial stop work: as noted at time of my inspection on #4972756 complaint # observed building completed with all shorthand work completed with a partial stop work o

    Sep 20, 2024 · Penalty $5,000

    Resolve
  • Class - 1

    During inspection of a 4 story building, at exposure #2 were excavation and cmu block install on the lot line, the adjacent property driveway was broken, cracked and uneven. i requested to see the pre-construct

    Aug 30, 2024 · Penalty $6,250

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments, at the time of my inspection i observed work does not conform with approved documents (1) existing wall showing on structural

    Jan 25, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    At the time of my inspection on a active 4 story nb site, observed, pedestrian protection not as per code, walkway maintain less than 4 feet at expos-1, where as per code required minimum 5 feet. provide and ma

    Dec 27, 2023 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to provide protections to adj properties as required by code. at the time of my inspection on a 4 story active site, observed missing ohp for adj at expos-4 rear yard where roof work not completed, gc

    Dec 27, 2023

    Resolve
  • Class - 1

    Workers on supported scaffold at epos-1 while site under notice of pswo for uses of scaffold at epos-1 & 3 due to no permit and failures to maintain supp scaffold. permit not obtained and not maintain as per co

    Dec 27, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    Supported scaffold at expos-1, 2 & 3 without permit, not maintained as per code. planks loose, missing adequate guard rails system. stop all exterior work uses of scaffold at all expos except to maintain and ob

    Dec 27, 2023

    Resolve
  • Class - 2

    At the time of my inspection observed, piles of garbage bags and combustible materials/debris piled at expos-1, created hazardous conditions. remove all garbage and combustible debris, maintain adequate housek

    Dec 27, 2023

    Resolve
  • Class - 1

    During my inspection of new 4 story building, construction in progress, building topped off, i observed a supprted scaffold erected @ exp.#1,2&3 approx 42ft high with exp.#1&3 sections extending into cellar are

    Oct 26, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    During my inspection of a new 4 story building observed the following conditions with supported scaffold in use, no permit or design drawing for scaffold. over 40ft, cut frames at base @ exp.#1&3, missing end-r

    Oct 26, 2023 · Penalty $2,500

    Resolve
Show 30 more ↓
  • Class - 2

    During my inspection of anew 4 story building, construction in progress, building topped off, observed a supprted scaffoldsurrounding building @ exp.#1,2&3, upon reviewing the site safety plan it did not show a

    Oct 26, 2023

    Resolve
  • Class - 2

    During my inspection of a new 4 story building, construction in progress, while checking sst cards, the project manager(lianxiang zheng) and the construction superintendent (ke han) did not have the required tr

    Oct 26, 2023

    Resolve
  • Class - 1

    Failure to institute/ maintain safety equipment measure or temporary construction--noguardrails. as noted:at time of inspection on an active construction site. i observed at exposure #3, fl #2, #3, #4 balconies

    May 24, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    -no details provided for detention tank ( excavation) at exp #3 rare; sidewalk shed drawings ; and fence drawings ** provide approved docs** stop all exacavation for the detention tank at exp #3 ( rare)

    Oct 14, 2022

    Resolve
  • Class - 2

    Observed adj property ohp @ exp#2 was not installed as required by 3309.13, distance from fence to adj property driveway/ garage is approx. 11 ft. for the protection of public/property, code stipulates that wh

    Oct 14, 2022

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and or approved amendments. as noted:at time of inspection on an active const site,concrete placement work at existing roof slab w/ elevator shaft upper

    Oct 12, 2022 · Penalty $625

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no guard rails. at time of inspection observed 3rd floor concrete decking in progress no fall protection/guard rail at all leadi

    Sep 29, 2022

    Resolve
  • Class - 1

    At time of my inspection observed exposure 2 adjacent property at 32-51 38 street exterior wall and driveways floors cracks has been found not maintain as required. the job site excavation deep more then 10 fee

    Aug 24, 2022 · Penalty $10,000

    Resolve
  • Class - 2

    At time of my inspection observed active job site. the building column 2, 4 &7 with foundation work does not conform as per approve plan as required. upon request for competent person approved plan provided th

    Aug 24, 2022 · Penalty $625

    Resolve
  • Class - 2

    No pre-construction survey or monitoring reports on-site at time of inspection., stop all excavation, earthwork and s.o.e. entire site.

    Jun 16, 2022

    Resolve
  • Class - 2

    Site contrary to s.s.p. due to missing o.h.p. in rear @ exp.#4, and no roof protection on adj. prop. @ exp.$#4, stop all work above 1st fl. within 15ft of exp.# 3 & 4, and stop all work above 3rd floor.conform

    Jun 16, 2022

    Resolve
  • Class - 2

    Sidewalk shed is contrary bto app. docs. due to open bay in middle 19ft, not 13 per d.d. also missing 3ft bay in middle and adj. prop o.h.p. contrary.

    Jun 16, 2022

    Resolve
  • Class - 2

    No sidewalk shed log-book made available at time of inspection.

    Jun 16, 2022

    Resolve
  • Class - 2

    Temporary construction equipment on site expired permit.as noted at time of my inspection observed that the site was closed.however on reviewing permits posted saw that the fence permit 421073983-01-eq-fn issue

    Jun 24, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Sec. 3303.4.1.1 sidewalk maintainance. at the time of my inspection ofa site under an nb work permit. i observed at exp#1 of the site,that the permit holder failed to maintain the sidewalk in front of his site.

    Oct 17, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection. at the time of my inspection of a site under an nb work permit. i observed that the permit holder failed to maintain the construction fence @

    Oct 17, 2019

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. note:at time of my inspection of a 4 story new building roof level under construction i observed sidewalk shed installed at exposure-1 on pedestrian walk

    Sep 27, 2019 · Penalty $2,400

    Resolve
  • Class - 1

    Bc 3301.6.1 design drawing-temporary platform. at time of inspection on a 4-story new building at 4th fl level observed temporary platforms beginning at 1st fl level to 3rd fl level elevator shaft. at 1st fl le

    Apr 17, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3305.6.1.2 failure to secure reshores in proximity to unenclosed perimeters at time of inspection on a 4 sty new bldg at 4th fl level observed unsecured reshores at perimeter edge on floors#2&3 at all expo

    Apr 17, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Sidewalk shed parapet panel content sign at time of inspection of a proposed 4 sty bldg w/a sidewalk shed in place at exp#1. observed no sidewalk shed parapet panel content sign in place. no information for the

    Apr 9, 2019

    Resolve
  • Class - 2

    Bc 1905.6.3.2 failure to remove test cylinders stored for a period up to 48 hrs,as noted at time of inspection,active site i observed 4 strength test cylinders molded by lab s&s on 2/5/19 & stored at expo#1 and

    Mar 1, 2019

    Resolve
  • Class - 2

    Bc 3301.7 failure to provide pe approved design drawings. as noted,at time of inspection active site i observed d-rings(fall protection strap system) installed at 2nd fl,no pe approved design drawings are avail

    Mar 1, 2019 · Penalty $620

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no toe boards. as noted at time of inspection active site i observed no toe boards installed in 2nd,3rd fl expo#2 and expo#3 res

    Mar 1, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    3301.7;failure to provide re approved detail drawings.as noted:at time of inspection on an active construction site.observed formwork placement at floor #3,(a)no p.e approve detail design drawings for formwork

    Jan 29, 2019 · Penalty $620

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.failure to provide number of required means of egress for every floor.at the time of inspection it was observed that there were person working at the baseme

    Nov 1, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to provide approved/accepted construction documents at jobsiteat time of inspction.at the time of inspection the contractors culd not provide the dob approved structural plans.as per code dob plans are

    Nov 1, 2018

    Resolve
  • Class - 1

    Failure to institute/maintain safety equiptment measures or temporary construction-no guardrails.at the time of inspection it was observed that the constractors failed to install guardrails or any other means o

    Nov 1, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to notify the department prior to commencement of earthwork. athe time of inspection it was observed that the contractors were working on the 1st floor but never called in the earthwork notification to

    Nov 1, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Jobsite fence not constructed/maintained pursuant to subsection.at thetime of inspection it was observed that the construction fence was notconstructed per code.the fence was not constructed out of plywood no v

    Nov 1, 2018

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection, as noted @ time of insp site closed observed the top of viewing panel located more than 6 ft approx (7 1/2 - 8)ft above the level of the grou

    Mar 21, 2018 · Penalty $400

    Resolve

Complaints

  • Water leak

    Heavy flow

    Jan 15, 2026 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Jan 5, 2026 · Apt 1B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
2017
Floors
4
Residential units
10
Building area
9,490 ft²
Lot area
6,000 ft²
Zoning
R5
Community board
401
Council district
22
Block / lot
656 / 15
Assessed value
$512,100
Landmark / historic district
No

HPD registration #434518, last renewed Jul 28, 2026.

Questions about 32-57 38 Street

Who owns 32-57 38 Street?

The owner of record in NYC Department of City Planning PLUTO data is Fourels Associates, LLC.

Does 32-57 38 Street have violations?

Yes. NYC HPD has recorded 11 housing violations at this property.

Is 32-57 38 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 32-57 38 Street built?

City records list 2017 as the year it was built.

How many apartments are in 32-57 38 Street?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.