24-40 Steinway Street
Queens, NY 11103BBL 4-00654-0059Map
Owner of record: Gbv Steinway Realty LLC
24-40 Steinway Street is a hotel built in 2018 in Queens, 11103. The owner of record is Gbv Steinway Realty LLC. HPD has recorded 1 housing violation here, most recently on May 11, 2026. 1 of the 1 most recent violations are still open.
- HPD violations
- 1
- DOB violations
- 10
- ECB violations
- 26
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 22, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Construction other optional
C-construction other optional
Aug 15, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 15, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 15, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 15, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jul 21, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 29, 1985
Dob violation - dismissed
ECB violations · 26
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0003238 by the august 1,2024 deadline.to date,the department has
Oct 1, 2024 · Penalty $12,500
Active - Class - 2
Construction superintendnet failure to peroform duties at time of inspection the assigned competent persosn was not able to provide me with the required items i observed the followings (1) inadequate logbook no
Nov 4, 2019 · Penalty $2,500
Resolve - Class - 2
3301.7=no ssp/inadequate ssp at time of inspection i requested the compettent persosn on site for the site safety plan the persosn was not able to provide me the plan lack of ssp is against the building code re
Nov 4, 2019
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. atthe time of inspection i observed piles of debris accumulated on 1st fl hallways corners & at working stations,also i noticed debris scatter
Oct 18, 2019 · Penalty $625
Resolve - Class - 2
Temporary construction equipment on site - expired permit. at time of inspection of 6 story building, observed a temporary construction fence permit expired on 5/18/19. remedy: renew permit comply w/ code
Sep 12, 2019
Resolve - Class - 1
3303.7.2 fire extinguishers. at time of inspection at 6 story building, observed fire extinguishers missing on all floors, observed some floors have wrong sizes and expired. remedy: comply with fdny code
Sep 12, 2019 · Penalty $2,530
Resolve - Class - 1
Inadequate housekeeping. at time of inspection on active job site of a6 story building,observed that housekeeping were inadequate,mix material and debris throughout building blocking egress,piles of wood,plywoo
Sep 12, 2019 · Penalty $2,530
Resolve - Class - 2
Work is not acocordance with site safety plan.@the time of inspection it was observed that provided ssp-004.00 plans shwing protection for adjoining property @exp#4 was showing roof protection-(pierced conditon
Apr 25, 2019
Resolve - Class - 2
Bc 3301.2 failure to provide overhead protection @exp3.@the time of myinspection it was observed an active const site with 6 sty new building being erected where it was noted that theme was no overhead project
Apr 25, 2019
Resolve - Class - 1
Illegally engaging in any business or occupation w/o required license or other authorization.@the time of inspection it was observed that super zenglen ye was on active const site (wita) expired license#25723
Apr 25, 2019 · Penalty $5,000
Resolve
Show 16 more ↓
- Class - 2
Insulation placement and/or r-valve do not meet min requirement nb job #421198821.at time of an energy compliance inspection.i observed that the exterior walls on exposure #1,#2 and #3 from 2nd to 6th floors we
Feb 19, 2019 · Penalty $2,000
Resolve - Class - 2
3301.7;failure to provide p.e approved repair drawings for concrete wall and slab.as noted:at time of inspection an active construction site concrete placement work completed to bulkhead observed exposure #2 fo
Feb 14, 2019 · Penalty $1,250
Resolve - Class - 2
Bc1906.1.2 failure to secure reshores in proximity to the facade,as noted, at time of inspectin, active site, 4story building i observed at 2nd and 3rd floor level exp#1 and exp#3 failure to secure reshores
Dec 3, 2018 · Penalty $625
Resolve - Class - 2
Bc 3301.7 failure to provide p.e. approved design drawings as noted at time of inspection active site, 4story building, i observed a plat form erected at elevator shaft first,second,third floor, no pe drawing
Dec 3, 2018
Resolve - Class - 2
Failure to provide approved/accepted construction documents at jobsite at time of inspection.at time of inspection i asked construction superintendent to provide the copy of site safety pland for 6 story hotel
Nov 2, 2018
Resolve - Class - 1
3309.1:failure to protect or adequately proect adj properties during construction operation.at time of inspection observed inadequate protection for debris falling into yard of adj. property located at 24-39 38
Nov 2, 2018 · Penalty $2,500
Resolve - Class - 1
Bc3304.4.4.no guardrails at excavation site:at the time of my inspection of a 6 story building currently at foundation level with construction work in progress. i observed excavated area at exposures 2 and 4 ap
Aug 15, 2018 · Penalty $2,530
Resolve - Class - 1
Bc3304.7.no means of egress from excavation:at the time of my inspection of a 6 story building at foundation level with construction operations in progress. i observed workers working in excavated are approx 20
Aug 15, 2018 · Penalty $2,530
Resolve - Class - 1
Bc3301.2.adequate means of egress:at the time of my inspection of a 6 story building at foundation level with construction operations in progress. i observed no gate door at exposure 1 construction fence contra
Aug 15, 2018 · Penalty $2,530
Resolve - Class - 2
Condition of fence:at the time of my inspection of a 6 story building currently at foundation level with construction operations in progress i observed the contractors removed fence panels at exposure 1 to gain
Aug 15, 2018
Resolve - Class - 2
Inadequate log book:at the time of my inspection of a 6 story buildingcurrently at foundation level with construction operations in progress.upon request for the logbook one was provided but not filed working c
Aug 15, 2018 · Penalty $5,030
Resolve - Class - 2
No viewing panels:at the time of my inspection of a 6 story building at foundation level with construction operations in progress. i observed no viewing panels provided at exposure 1 construction fence as requi
Aug 15, 2018
Resolve - Class - 2
Jobsite fence does not meet code specifications at time of inspection noted that the jobsite fence was dangerously leaning held up by rope and not embedded in concrete,damaged plywood and nails petruding out on
Feb 23, 2017
Resolve - Class - 1
Weather proofing adjoining property at time of inspection note at expo#4 weather proofing not provided,removal of sheet rock and fill of veam pockets also parge and there seal of wall not done also need to prov
Feb 23, 2017 · Penalty $1,600
Resolve - Non-hazardous
Work without a permit:complete change in layout creating several office type cubicals approx 8'high a search of dept records shown work application #400646100 was pre filed on 6-6-96 however no permits was issu
Jun 10, 1996
Resolve - Non-hazardous
Work without a permit:entire bathroom being alter in that wall was removed and all fixtures taken out.a search of dept records shown applic-ation #400646100 for plumbing was pre filed on 6-6-96 however no permt
Jun 10, 1996 · Penalty $350
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2018
- Floors
- 6
- Residential units
- —
- Building area
- 14,236 ft²
- Lot area
- 4,750 ft²
- Zoning
- C4-2A
- Community board
- 401
- Council district
- 22
- Block / lot
- 654 / 59
- Assessed value
- $1,796,400
- Landmark / historic district
- No
Questions about 24-40 Steinway Street
Who owns 24-40 Steinway Street?
The owner of record in NYC Department of City Planning PLUTO data is Gbv Steinway Realty LLC.
Does 24-40 Steinway Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 24-40 Steinway Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 24-40 Steinway Street built?
City records list 2018 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.