14-46a 30 Avenue
Queens, NY 11102BBL 4-00536-0142Map
Owner of record: Kalam Tower LLC
14-46a 30 Avenue is a two-family home built in 1925 in Queens, 11102. It has 2 residential units across 2 floors. The owner of record is Kalam Tower LLC. HPD has recorded 24 housing violations here, most recently on October 7, 2026. 16 of the 24 most recent violations are still open.
- HPD violations
- 24
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 26
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 7, 2026
Open — Info nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from east at south wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Oct 5, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from east at south wall in the 2nd room from north located at apt 2, 2nd story, 1st apartment from east at south
Oct 5, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 4th room from north located at apt 2, 2nd story, 1st apartment from east at south
Oct 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north located at apt 2, 2nd story, 1st apartment from east at south
Oct 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from west at north wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Oct 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from north at east wall, 1st door frame from north at east wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Oct 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame in the 2nd room from north located at apt 2, 2nd story, 1st apartment from east at south
Oct 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from east at south wall in the 2nd room from north located at apt 2, 2nd story, 1st apartment from east at south
Oct 5, 2026 · Apt 2
Open — Nov sent out
Show 14 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall, 1st door frame from south at west wall in the 4th room from east located at apt 1fl, 1st story, 2nd apartment from south at west
Aug 28, 2026 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 4th room from east located at apt 1fl, 1st story, 2nd apartment from south at west
Aug 28, 2026 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 2nd room from east located at apt 1fl, 1st story, 2nd apartment from south at west
Aug 28, 2026 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1fl, 1st story, 2nd apartment from south at west
Aug 28, 2026 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of overgrown vegetation at rear yard
Aug 28, 2026
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 1fl, 1st story, 2nd apartment from south at west
Aug 28, 2026 · Apt 1FL
Open — Defect letter issued - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jun 23, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ,, 1st door from east at south wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Jun 22, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Jun 22, 2023 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
Jun 22, 2023 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st radiator from north at east wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Jun 22, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 4th room from east located at apt 1, 1st story, 1st apartment from south at west
Jun 22, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from south at west
Jun 22, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1, 1st story, 1st apartment from south at west
Jun 22, 2023 · Apt 1
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Slow leak
Oct 1, 2026 · Apt 2
Close - Appliance
Refrigerator
Oct 1, 2026 · Apt 2
Close - Plumbing
Basin/sink
Oct 1, 2026 · Apt 2
Close - Door/window
Window frame
Oct 1, 2026 · Apt 2
Close - Plumbing
Toilet
Oct 1, 2026 · Apt 2
Close - Door/window
Door
Oct 1, 2026 · Apt 2
Close - Paint/plaster
Wall
Oct 1, 2026 · Apt 2
Close - Unsanitary condition
Mold
Oct 1, 2026 · Apt 2
Close - Unsanitary condition
Pests
Oct 1, 2026 · Apt 2
Close - Electric
Power outage
Oct 1, 2026 · Apt 2
Close
Show 16 more ↓
- Paint/plaster
Door/frame
Sep 2, 2026 · Apt 1
Close - Unsanitary condition
Pests
Sep 2, 2026 · Apt 1
Close - Paint/plaster
Window/frame
Sep 2, 2026 · Apt 1
Close - Paint/plaster
Door/frame
Aug 22, 2026 · Apt 1FL
Close - Unsanitary condition
Pests
Aug 22, 2026 · Apt 1FL
Close - Unsanitary condition
Pests
Aug 22, 2026 · Apt 1FL
Close - Electric
Power outage
Aug 13, 2026 · Apt 2
Close - Paint/plaster
Wall
Aug 13, 2026 · Apt 2
Close - Unsanitary condition
Pests
Aug 13, 2026 · Apt 2
Close - Plumbing
Basin/sink
Aug 13, 2026 · Apt 2
Close - Paint/plaster
Wall
Aug 13, 2026 · Apt 2
Close - Door/window
Door
Aug 13, 2026 · Apt 2
Close - Door/window
Window frame
Aug 13, 2026 · Apt 2
Close - Water leak
Slow leak
Aug 13, 2026 · Apt 2
Close - Plumbing
Toilet
Aug 13, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 2
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 16, 2025 | $950,000 | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B1)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 1,536 ft²
- Lot area
- 2,328 ft²
- Zoning
- R4-1
- Community board
- 401
- Council district
- 22
- Block / lot
- 536 / 142
- Assessed value
- $80,760
- Landmark / historic district
- No
HPD registration #926473, last renewed May 11, 2026.
Questions about 14-46a 30 Avenue
Who owns 14-46a 30 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Kalam Tower LLC.
Does 14-46a 30 Avenue have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 14-46a 30 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 14-46a 30 Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 14-46a 30 Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.