Owner of record: Astoria Boulevard Construction And Devel Opment LLC

8-29 Astoria Boulevard is an elevator apartment building built in 2023 in Queens, 11102. It has 16 residential units. The owner of record is Astoria Boulevard Construction And Devel Opment LLC. HPD has recorded 2 housing violations here, most recently on June 4, 2006. 2 of the 2 most recent violations are still open.

HPD violations
2
DOB violations
10
ECB violations
49
HPD complaints
4

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 4, 2006

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 2

  • B

    Abate the nuisance consisting of vermin bedbugs in the entire apartment located at apt 2a, 2nd story, 4th apartment from east at south

    Jun 4, 2006 · Apt 2A

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2a, 2nd story, 4th apartment from east at south

    Jun 4, 2006 · Apt 2A

    Open — Nov sent out

DOB building violations · 10

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 15, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active

ECB violations · 49

  • Class - 2

    Proposed 7 story new building with incomplete construction work, observed installed temporary construction fence, permit posted on the fence expired on 10/20/2025 and upon further review on dob now updated fenc

    Jul 7, 2026 · Penalty $625

    Resolve
  • Class - 2

    Observed several missing bolt coverings on permitted sidewalk shed's vertical members at exposure 1, this creates unsafe conditions to the public exposing sharp edges that can lead to puncture or laceration inj

    Feb 2, 2026 · Penalty $2,400

    Resolve
  • Class - 2

    3301.13.6- observed active jobsite upon research on the department records alerted me that cs # 030469 is listed on 4 jobsites, exceeding the authorized limit of 3 jobsites as per local law 149 of 2021. cs # is

    Nov 10, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Inspection of a 6 story building i banged on the fence door several times; i observed a worker coming out of a porta potty and a worker on the supported scaffold who saw me but no one gave me access all 3 point

    Nov 7, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    No en drawing and architectural drawing approved from dob provided on the job site at the time of inspection., maintain/display required documents; please go to https://www1.nyc.gov/site/buildings/codes/energy-

    Oct 21, 2025 · Penalty $1,250

    Active
  • Class - 2

    Observed failure to provide protection on the adjacent property on exp#3 with visible accumulating debris at grade. stop all exterior work on exp#3, to include all work 10ft to the interior of the building.

    Apr 10, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection, upon requesting the design drawing for working platforms observed at exposure #4, the construction superintendent (xiao zheng) failed to provide. / stop the use of all working platforms

    Mar 31, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    430pm observed fence chained padlock no work activity at site,reviewed nb permit in bis revealed building footprint 5000+ sq feet requiring watchperson during hours when operations not in progress per bc3303.3,

    Mar 4, 2025 · Penalty $2,500

    Active
  • Class - 2

    During inspection observed 6 story new building closed site, construction fence surrounding, upon research on dob web site determine that temporary construction fence q00026366-i1-fn was expired 12/11/2024 and

    Dec 16, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Safety measures and standards. observed jobsite accessiable along exposure 4, without full closure of a construction fence(required 8 feet in height) multiple access points leading into construction site under

    Aug 24, 2024

    Resolve
Show 39 more ↓
  • Class - 1

    Inspection(soil and foundation). observed large openings on soil alongexposure 4 where cmu/foundation are in place and temporary sidewalk shed is installed. area with large cracks/soil openings, accessable and

    Aug 24, 2024

    Resolve
  • Class - 2

    Observed 6 str nb with the sidewalk shed at exp#1 not built in code-compliance- approximately 2ft gap between shed and face of building not sealed as required, specifically at ends of shed, and with a large gap

    Jun 13, 2024 · Penalty $2,400

    Resolve
  • Class - 1

    3304.8 and 3304.14.2 failure to drain construction site of standing water. as noted: at time of inspection at an active jobsite for a proposed 6 story building already at the 3rd floor level. observed approxima

    Feb 16, 2024 · Penalty $12,500

    Active
  • Class - 2

    During my inspection observed 2 workers at leading edge of upper floor with no fall protection, when body harnesses were produced all were passed the expiration date ( no manu specs on-site), i then asked to se

    Nov 14, 2023 · Penalty $3,125

    Resolve
  • Class - 2

    During my inspection, observed workers on leading edge without fall protection when harnesses were produced they were expired and the strap log had not been maintained, openings in floors had inadequate coverin

    Nov 14, 2023 · Penalty $10,000

    Active
  • Class - 2

    Bc 3307.6.4.8 lighting.@6 story new building site observe pedestrian protection sidewalk sheds underside passageway electrical light fixtures light bulbs all inoperable/not illuminated during no daylightbc 3307

    Aug 31, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to provide safety measures for construction operations. responding a complaint observed: active job site concrete operations at this time construction uncapped rebars throughout job site creating a pote

    May 16, 2023 · Penalty $12,500

    Active
  • Class - 1

    Failure to provide safety measures for adjoining properties. responding a complaint observed: approximately 12' new construction with no overhead protection, control access agreement for adjoining properties ex

    May 16, 2023 · Penalty $12,500

    Active
  • Class - 2

    Failure to maintain/display on site documents required by bc chapter 33.as noted:at time of inspection on active construction site observed at fl #1 exp #2 shearwall sw-s5 in place with formwork aprox 8 ft long

    Feb 3, 2023

    Resolve
  • Class - 2

    28-116.2.3 failure to provide inadequate inspection progream tr-3 concrete design mix 5000psi.as noted at time of inspection at an active construction site,i observed at foundation level footing,foundation wall

    Oct 19, 2022

    Resolve
  • Class - 2

    Failur to mantain: site is on going construction under job # 421603777-01-nb. due to construction neighbour property already sattlement and cave-in over 8/10 places., repair and/or replace

    Oct 18, 2022

    Resolve
  • Class - 2

    Construction superintendent failed to perform duties.note:at time of inspection of 6 story new building construction work in progress at excavation phase request for competent person not at job site for duratio

    Mar 23, 2022 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to maintain/display on site documents required by bc chapter 33.note:at time of inspection of 6 story nb construction work in progress at excavation phase no competent person on site request for vibrati

    Mar 23, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Bc3301.1.2 failure to comply with fire code.no fire guard f-60 certificate of fitness holder on site for torch and welding operations.at time of inspection on active 6 story new building in excavation phase obs

    Sep 17, 2021

    Resolve
  • Class - 1

    Work does not conform w/approved support at excavation plans. soe-101 to 102 & 104 detail 8. at time of inspection on active 6 sty new bldg site in excavation phase i observed rear section of site approx 28 fee

    Sep 17, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Sec. bc3304.4.5 excavated material & super imposed loads shall not be placed closer to theh edge of the excavation to one & one half times the depth of sub excavation. at time of inspection at purposed 6 sty bl

    Sep 17, 2021

    Resolve
  • Class - 2

    Sec. 3301.2 & 27-1009(a) failure to safeguard all persons & property affected by construction operations. at time of inspection at purposed 6 sty bldg,i observed welder working on beam above really 14ft above

    Sep 17, 2021

    Resolve
  • Class - 2

    Failure to comply w/manufacturer specifications. at time of inspectionat purposed 6 sty bldg,i observed barriers not assembled as per manufacturer specifications. car can potentially hit the barriers into a pro

    Sep 17, 2021

    Resolve
  • Class - 2

    Failure to maintain on site documents required by bc chapter 33 no monitary plans and readings for optical/crack/vibration.at time of inspection on active 6 story new building site in excavation phase with supp

    Sep 17, 2021

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection. at time of inspection at purposed 6 sty bldg. i observed fence at exp#3not properly constructed-piece of fence hanging on left side of exp#3

    Sep 17, 2021

    Resolve
  • Class - 2

    Failure to maintain/display on site documents required by bc chapter 33. noted: at time of my inspection of a new 6 sty bldg,construction inprogress at the earthwork/excavcation phase,2 workers on site,i observ

    Feb 25, 2021

    Resolve
  • Class - 2

    Sec. 3301.1.13.1 & 28-110.1 work contrary to safety plans(ssp). noted:at the time of my inspection of active 6 sty new bldg construction jobsite. i observed construction in progress of earthwork/excavation(2 wo

    Feb 25, 2021

    Resolve
  • Class - 2

    Superintendent fail to designated a competent person and have on site.at time of inspection on an active 6 story nb construction site,when request was made for the superintendent or the competent person for the

    Aug 26, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Provision of law:bc3307.3.2 failure to provide/maintain construction fence as per code.at time of inspection on an active 6 story nb construc site,notice at expo#2,3&4 of the construction site was missing or th

    Aug 26, 2020

    Resolve
  • Class - 2

    Job site fence under permit # 421204716-01-eq-fn has expired 03/07/2017. , renew permit

    Oct 22, 2019 · Penalty $6,250

    Resolve
  • Class - 2

    Job site fence at exposure 1 has several panel dislodged and lay across sidewalk., comply with code

    Oct 21, 2019 · Penalty $4,000

    Resolve
  • Class - 2

    Work without permit expired permit.noted:construction site fence permit #420941805 issued on 09/02/2014 and expired on 09/02/2015.rem:renew permit

    Mar 9, 2018

    Resolve
  • Class - 2

    Jobsite fence not constructed pursuant to subsection.noted:construction site fence fell down at front and rear right side of the property oftime of inspection.this situation not safe for the public.public acces

    Mar 9, 2018 · Penalty $2,000

    Resolve
  • Class - 1

    3309.9 weatherproofing integrity of adjoining property at time of inspection observed demolition operations completed,adjoining property exposure2 has not been fully weather proofed as per code.rmdy:stop all wo

    Apr 23, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order to correct vio #34715605nfor work w/o permit erected a new brick faced bldg approx. 19' x 100' x 30' w/o permit and vio 34715609k installed illegal plumbing for 14 a

    May 2, 2009 · Penalty $1,600

    Active
  • Class - 1

    4a,15,16,19b,32a,38,50a,b,c,d,e,f,g,h,i,j,k,l,m,36.50a-illegal temp wiring on boiler.50b-safety valve not installed in vertical position.50c-no clean out at base of chimney.50d-no emergency shut off switch out

    Oct 6, 2008 · Penalty $1,000

    Active
  • Class - 1

    Work w/o a permit gas lines,water lines,waste lines full bathrooms,stove and sinks installed in cellar,1st flr,2nd flr and 3rd flr w/o a permit. remedy: obtain permit or restore premises to prior legal conditio

    Oct 3, 2008 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to maintain building in code-complaint manner: lack of system of automatic sprinklers where required per bc 903.2;27-954 multiple story building w/o required sprinkler system. remedy: provide a system

    Oct 3, 2008 · Penalty $1,000

    Active
  • Class - 1

    Work w/o a permit. work noted: erected new bldg approx 19' wide, 100' long, 30' high, 3 story brick walls and wood floors joist w/o a dob permit, w/o tr-1 for structural stability. created inside through

    Oct 2, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the c of o or bldg dept records.bldg dept records indicates at 8-29 astoria blvd empty lot illegal occupancy noted: build w/o permits 3 story bldg, converted this bldg to

    Oct 2, 2008 · Penalty $2,400

    Resolve
  • Class - 1

    New bldg occupied w/o a valid c of o. noted: erected new bldg approx 19' wide, 100' long, 30' high, 3 story w/o permits. new bldg 14 class "a" apts - 2 apt 3rd fl, 5 apt 2nd, 5 apts 1st fl, 2 apts at cellar

    Oct 2, 2008 · Penalty $1,000

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner. noted: erected 3 story bldg, created multiple dwelling (14 apts) w/o a secondary means ofegress apts 3rd, 2nd, 1st floors and cellar. remedy: comply w/code.

    Oct 2, 2008 · Penalty $1,000

    Active
  • Class - 1

    Plumbing work w/o a permit. work noted: installed water & waste lines for 14 full bathrooms (toilet, sink and shower) each & 14 residential sinks for 14 kitchens. installed 14 gas lines for stoves at kitchens.

    Oct 2, 2008 · Penalty $1,600

    Resolve
  • Class - 1

    Gas being supplied to bldg w/o inspection & certification by dob. unauthorized gas for residential cooking w/o dob authorization & testing, 14 cooking gas lines illegally installed. dob record shows gas svc

    Oct 2, 2008 · Penalty $1,000

    Active

Complaints

  • Nonconst

    Vermin

    May 25, 2006 · Apt 2A

    Close
  • General

    Floor

    Jan 20, 2005 · Apt 2A

    Close
  • Nonconst

    Vermin

    May 17, 2004 · Apt 3B

    Close
  • Nonconst

    Vermin

    May 17, 2004 · Apt 3B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2023
Floors
—
Residential units
16
Building area
9,470 ft²
Lot area
2,607 ft²
Zoning
R6A
Community board
401
Council district
22
Block / lot
509 / 18
Assessed value
$564,300
Landmark / historic district
No

Questions about 8-29 Astoria Boulevard

Who owns 8-29 Astoria Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Astoria Boulevard Construction And Devel Opment LLC.

Does 8-29 Astoria Boulevard have violations?

Yes. NYC HPD has recorded 2 housing violations at this property.

Is 8-29 Astoria Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 8-29 Astoria Boulevard built?

City records list 2023 as the year it was built.

How many apartments are in 8-29 Astoria Boulevard?

It has 16 residential units and 17 units in total.