roofy

38-60 11 Street

Queens, NY 11101BBL 4-00474-0056Map

Owner of record: 38-60 Hotel, LLC

38-60 11 Street is a hotel built in 2018 in Queens, 11101. The owner of record is 38-60 Hotel, LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
6
ECB violations
38
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 6

  • Construction other optional

    Fail to comply w/commissioner's order-dob vio#060322ceu40101pw (complaint#4891633)issued on 6/3/22 ordered 38-60 hote llc to file all emrgcy wrk w/in 48hrs after the emrgncy wrk order was issued.as of 7/25/22,28-60 hotel llc has not file for the emergncy wrk comply with commissioner's order and code

    Jul 25, 2022

    Dob violation - dismissed
  • Construction other optional

    Emergency work order-the following works to be done immed under continuous supervision: repair rence at both front and rear,provide/ repair construction guardrail(fall protection)on all floor levels incl bldg perimeter interfior slab edges and elev/stair shafts,remove free standing wall. remedy: all work t/be filed w/in 48hrs

    Jun 3, 2022

    Dob violation - dismissed
  • Construction other optional

    Boro commissioner issued notice of order to stop work immediately due to general contractor withdrawal for application # 421018605-01-nb, 421018605-01-eq-fn. stop all work immediately. ok to make site safe.

    Jun 2, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 5, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 5, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 5, 2020

    Dob violation - active

ECB violations · 38

  • Class - 2

    Temporary construction equipment on site -expired permit. note: observed permit # 421018605-01-eq-fn for temporary construction fence erected at front of this location is expired 04/05/2022 and has not been ren

    Jan 12, 2026 · Penalty $1,250

    Active
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection. note: observed temporary construction fence erected at front of this location as per permit # 421018605-01-eq-fn is not properly maintained a

    Jan 12, 2026 · Penalty $1,000

    Active
  • Class - 2

    Temporary construction equipment or installation on-site expired permit. as noted: at time of inspection on a construction site of a proposed 8 story building was closed. observed construction fence permit had

    Mar 12, 2025 · Penalty $6,250

    Active
  • Class - 2

    Failure to provide project information panels and contents as noted:attime of inspection on a proposed 9 story building construction site was closed,observed at exposure one project information panels and its c

    Nov 8, 2024 · Penalty $6,250

    Active
  • Class - 2

    Temporary construction equipment are installation on site (expired permit) as noted: at time of inspection construction site was closed. however on research on dob records observed that constrction fence permit

    Dec 5, 2023 · Penalty $6,250

    Active
  • Class - 2

    Jobsite fence not constructed or maintained pursuant to subsection.at time of inspection observed a 2 story building with construction fenceerected at exposure#1,fence not maintained as required,it has cracks a

    Mar 22, 2023

    Resolve
  • Class - 2

    Temporary construction equipment on site-construction plywood fence permit expired.as noted:at time of inspection construction site closed new building under demolition observed at exp #1 construction plywood f

    Feb 22, 2023 · Penalty $6,250

    Active
  • Class - 2

    Site closed at time of inspection, observed garbage / debris both inside and out of construction site, old clothing, leftover food garbage creating possible rodent hazard, and site generally unkept., maintain a

    Dec 13, 2022 · Penalty $6,250

    Active
  • Class - 2

    Observed a construction fence in place at exposure #1, site closed at time of inspection, upon researching the department of buildings data-base, i observed the permit for the construction fence had expired on

    Dec 13, 2022 · Penalty $1,250

    Active
  • Class - 2

    3307.6.3 miscellaneous violation. at the time of a 9 story building,i observed sidewalk shed in place to protect public and property. however at the time of my inspection i observed that the decking of the sws

    Aug 20, 2020

    Resolve
Show 28 more ↓
  • Class - 2

    3309.14 miscellaneous violation. at the time of a 9 story building,i observed the cmu wall at exp#1 were at 5th fl. however on the 3rd fl where the cmu wall extended,i observed all the window at exp#2 of the ad

    Aug 20, 2020 · Penalty $1,250

    Active
  • Class - 2

    Work does not conform to approved construction doc as noted; @time of inspection on an active site, observed @4th floor lvl-cmu shear wzll @elevator shaft location hast vert.(reint) @ > 17' approved drawings

    Nov 4, 2019 · Penalty $1,250

    Active
  • Class - 1

    Super failed to perform duties. as noted: @time of inspection on an active site, observed numberous non conformancies with the plans including: cmu walls bearing load of steel beams not erected properly, missin

    Nov 4, 2019 · Penalty $10,000

    Active
  • Class - 1

    Failuire to institutue/maintian safety equipment or temporary const(noguardrail). as noted: @time of inspection on an active construction site. observed floor #4, metal deck placement work and observed @exp#2

    Nov 4, 2019 · Penalty $5,000

    Active
  • Class - 1

    Bc 3301.7 failure to provide approved design drawings.as noted:@timeo f inspection on an active job site observed a steel structure currently @the 4th floor lvl observed on (phase) s-103.01 moment connnections

    Nov 4, 2019 · Penalty $2,500

    Active
  • Class - 2

    Bc 2104.9.1 masonry bearing is not in conformance with approved designand nyc building code. steel beams(cw/plate) are resting on cmu blockswhich are damaged and broken creating a surface which is eneven for

    Nov 4, 2019 · Penalty $1,250

    Active
  • Class - 2

    Documents not on site. at time of inspection of an active jobsite a 9 sty nb was currently on the 4th fl. such bldg consisted of steel frame& concrete masonry blocks. upon request of the technical reports and

    Sep 16, 2019 · Penalty $312

    Resolve
  • Class - 1

    Missing sidewalk shed. at time of inspection i observed an active jobsite,nb was currently on the 4th fl w/proposed 9 stones & no sidewalk shed in place. i also observed roof protection on the adjacent properti

    Sep 16, 2019 · Penalty $10,000

    Resolve
  • Class - 1

    Work contrary to site safety plans. at time of inspection of an activejobsite i observed the sws in place on the site safety plan,however it was not placed on the site. i also observed a large amount of materia

    Sep 16, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard public & property. at time of inspection i observed material being into a jobsite w/a mobile lift from expose 1. while the material was being lifted,no safeguards were implemented in the

    Sep 16, 2019 · Penalty $10,000

    Resolve
  • Class - 2

    Job site plywood construction fence not pursuant to subsection. as noted: at time of inspection site was closed, observed at exp #2, plywood construction fence leaning outward endangering the public, fence shal

    Jan 25, 2019

    Resolve
  • Class - 1

    Construction superintendent failed to perform duties as per rule.at the time of inspection construction super michael benz & his competent person more not on site & he has not signed his log book.the following

    Dec 8, 2017 · Penalty $10,000

    Resolve
  • Class - 1

    Bc3309.1/failur to protect or adequately protect adjoining properties during construction or demolition operations.at the time of inspectioncracks & water damage observed inside the adjoining building at exp#4

    Dec 8, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3304.7/failure to provide at least on safe means of egress from excavation.at the time of inspection it was observed that the constractor did not provide a safe means of egress from the excavation/site worker

    Dec 8, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3303.14/failure to provide adequate drainage to prevent water accumulation at construction or excavation site.at the site of inspection itwas observed that the contractor did not provide adequate drainage to

    Dec 8, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3309.9/failure to waterproof adjoining wall or building during construction or demolition operations.at the time of inspection it was observed that the contractor did not waterproof the adjoining walls & buil

    Dec 8, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to provide approved/accepted construction documents at job site at time of inspection. nb job #421018605. at time of an energy compliance inspection. i observed that there were not complete sets

    Jul 12, 2017

    Resolve
  • Class - 1

    Fence. observed fence at job site at exp# 3 had partiallty fallen and now approx 8'-0' lf of fence is missing. call best for reinspection. remedy: maintain job sife fence.

    Mar 13, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Bc3304.8 failure to drain construction site of standing water. as noted: at time of inspeciton, construction site was closed. i observed through the construction fence viewing panels apprx 2'of ground water

    Jan 5, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to commply w/the commisioner's order to file a cert of correction w/the dob for notice of viol#34692396y/071408c01kb11, status: in violation, overdue compliance. found at front yard storage of comm & tr

    Apr 26, 2010 · Penalty $4,000

    Resolve
  • Class - 1

    Occupancy contrary to c of o or dob records according to dob records bldg should be occupied as 2 family dwelling noted the front yard of premises used for parking commercial construction truck storage of

    Jul 14, 2008 · Penalty $2,400

    Resolve
  • Hazardous

    Work w/o a permit. work noted: front of premises; erected elevated walk way approx 50'long x5'high x5'wide const on concrete, steel frame, 42"high steel guardrail, stairway w/ steel steps & concrete & steel ram

    Jul 26, 2007 · Penalty $800

    Resolve
  • Hazardous

    Failure to comply w/ an order of the dept noted:premises has outstanding nov (dob) #022806c01hd03 issued on 2/28/06 for an illegally erectedramp at front of premises furthermore work was applied for

    Jul 17, 2007 · Penalty $1,500

    Resolve
  • Hazardous

    Failure to comply with an order of the department to correct vio#34510910k on 12/28/00 for work without a permit. remedy: comply with departments order & obtain permit.

    Oct 7, 2006

    Resolve
  • Hazardous

    No access violation written based upon no record of correction for vio#34510910k 12/28/00 for work w/o permit. no permits on record. remedy:comply w/commissioners order & contact boro office for reinspection

    Jun 6, 2006 · Penalty $1,500

    Resolve
  • Non-hazardous

    Work w/o permit. work noted: at cellar level, installed water & waste lines for a (3) piece bathroom and residential sink with gas line for stove. remedy: obtain permit or restore to prior legal condition.

    Feb 28, 2006 · Penalty $800

    Resolve
  • Non-hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved number of families. dept of bldgs record indicates premisesto be legally approved for a (2) family with cellar as boiler room/sto

    Feb 28, 2006 · Penalty $3,050

    Resolve
  • Non-hazardous

    Work w/o a permit. work noted: a front of premises constructed a concrete ramp with steel support going from side walk to cellar level and awalkway constructed of concrete blocks and metal decking support leadi

    Feb 28, 2006 · Penalty $500

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H3)
Year built
2018
Floors
9
Residential units
—
Building area
12,549 ft²
Lot area
2,415 ft²
Zoning
M1-3
Community board
401
Council district
26
Block / lot
474 / 56
Assessed value
$259,650
Landmark / historic district
No

Questions about 38-60 11 Street

Who owns 38-60 11 Street?

The owner of record in NYC Department of City Planning PLUTO data is 38-60 Hotel, LLC.

Does 38-60 11 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 38-60 11 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 38-60 11 Street built?

City records list 2018 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.