42-20 12 Street
Queens, NY 11101BBL 4-00459-0064Map
Owner of record: Jas 12th Street Holding LLC
42-20 12 Street is a factory / industrial built in 1935 in Queens, 11101. The owner of record is Jas 12th Street Holding LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 18
- ECB violations
- 7
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 18
- High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
Ftm.warehouse type struct w/wood bowstring truss rooff.job#440199170 to rpr the truss was disapproved on 3/5/15.no subsequent app have been filed w/dob.fail to obtain dept approval&obtain perm in timely fashion will be a breach.remedy:rpr dwgs prep by lic pe to be filed w/dob no later 4/9/18.wrk und perm beg no later 4/16/18
Mar 8, 2018
Dob violation - active - High pressure boiler boiler required
Violation issued for failure to file 2015 annual high pressure boiler inspection
Jun 23, 2017
Dob violation - active
Show 8 more ↓
- High pressure boiler boiler required
Violation issued for failure to file 2015 annual high pressure boiler inspection
Jun 23, 2017
Dob violation - active - High pressure boiler boiler required
Violation issued for failure to file 2014 annual high pressure boiler inspection
Dec 16, 2016
Dob violation - active - High pressure boiler boiler required
Violation issued for failure to file 2014 annual high pressure boiler inspection
Dec 16, 2016
Dob violation - active - High pressure boiler boiler required
Violation issued for failure to file 2013 annual high pressure boiler inspection
Mar 3, 2015
Dob violation - active - High pressure boiler boiler required
Violation issued for failure to file 2013 annual high pressure boiler inspection
Mar 3, 2015
Dob violation - active - Construction other optional
Faiure to comply with a commissioner's order. the building is a ware- house-type structure with a wood bowstring truss/roof. the department served you with a curable commissioner's order (notice of violation) to produce an engineer's report on your building. no engineer's report has been received
Sep 12, 2014
Dob violation - active - Construction other optional
Nyc admin code- add'l occup 1 story bldg with wood bowstring roof remedy:w/i 60 days of inspection owner to engage a nys licensed pe ex w/ wood truss to probe and evaluate structural soundness using field verif,calcs,probes,ect. each truss and bearing to be eval. any def to be shored. repair drwings to be filed with dob within 45 days after in
Jun 26, 2014
Dob violation - active - Construction other optional
C-construction other optional
Dec 18, 2008
Dob violation - dismissed
ECB violations · 7
- Class - 2
28-317.3 failure to register cooling tower. rmdy: comply w/code.
Sep 21, 2015 · Penalty $4,000
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records c of o #122779 dated 5/26/58 for block 459. lot 64 for premises under p.c. job alt 2 #410015781 on a log folder
Dec 18, 2008 · Penalty $2,400
Resolve - Class - 1
18a.18b.48b
Oct 21, 2008 · Penalty $250
Resolve - Non-hazardous
Cease use.b4b,51,50a,50b,50c,50d,50e,50f.50a defective refractory at feed line inlet allowing combustion spillage.50b defective flue pipe connection causing combustion spillage through draft stat.50c install
Jan 23, 2007 · Penalty $800
Resolve - Non-hazardous
Cease use b4b,51,50a,50b,50c,36.50a imporper flue pipe connection to chimeny vent.50b pipe safety or releif valve discharge to a safe location.50c defective flue pipe connection causing combustion spillage
Jan 23, 2007 · Penalty $800
Resolve - Non-hazardous
18ab/50 16 fulton v.t. boiler, 30 hp, nb 49821, gas, 1986 50 safety valve discharge pipe turned up. pipe down discharge as required for jurisdictional compliance. 18ab) corrosion and leakage at handholes 16
May 10, 2005
Resolve - Non-hazardous
18ab/16 fulton v.t. boiler 30hp, nb74747, gas, 1995 18ab) corrosion and leakage at handholes. 16 boiler inspection certificate not posted.
May 10, 2005
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Factory / industrial (F9)
- Year built
- 1935
- Floors
- 1.5
- Residential units
- —
- Building area
- 9,764 ft²
- Lot area
- 8,425 ft²
- Zoning
- M1-5A
- Community board
- 402
- Council district
- 26
- Block / lot
- 459 / 64
- Assessed value
- $501,750
- Landmark / historic district
- No
Questions about 42-20 12 Street
Who owns 42-20 12 Street?
The owner of record in NYC Department of City Planning PLUTO data is Jas 12th Street Holding LLC.
Does 42-20 12 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 42-20 12 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 42-20 12 Street built?
City records list 1935 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.