43-30 24 Street is an elevator apartment building built in 2022 in Queens, 11101. It has 938 residential units across 67 floors. The owner of record is Cp Viii Lic Owner, LLC. HPD has recorded 26 housing violations here, most recently on October 16, 2026. 24 of the 26 most recent violations are still open.
- HPD violations
- 26
- DOB violations
- 7
- ECB violations
- 33
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm, at east door leading to refuse/service elevator room at 60th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm east door leading to refuse/service elevator room at 58th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm , east door leading to refuse/service elevator room at 57th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm , east door leading to refuse/service elevator room at 49th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm , east door leading to refuse/service elevator room at 46th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm , east door leading to refuse/service elevator room at 31st story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm , east door leading to refuse/service elevator room at 26th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm , east door leading to refuse/service elevator room at 18th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm , east door leading to refuse/service elevator room at 4th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st firedoor from south at west leading to firestairs b at 7th story at public hall
Oct 16, 2026
Open — Nov sent out
Show 16 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, 2nd firedoor from south at west leading to firestairs a at 7th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm, at east door leading to refuse/service elevator room at 66th story public hall labeled ph2 at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, 2nd firedoor from south at west leading to firestairs a at 27th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, 2nd firedoor from south at west leading to firestairs a at 16th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, 2nd firedoor from south at west leading to firestairs a at 5th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, 2nd firedoor from south at west leading to firestairs a at 60th story public hall at public hall
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 57m, 57th story, 8th apartment from south at west
Oct 8, 2026 · Apt 57M
Open — Violation will be reinspected - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 61g, 61st story, 3rd apartment from south at west
Oct 8, 2026 · Apt 61G
Open — Violation will be reinspected - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 62p, 62nd story, 2nd apartment from north at east
Oct 8, 2026 · Apt 62P
Open — Violation will be reinspected - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 60e, 60th story, 1st apartment from south at west
Oct 8, 2026 · Apt 60E
Open — Violation will be reinspected - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 60g, 53rd story, 2nd apartment from north at east
Oct 6, 2026 · Apt 60G
Open — Invalid certification - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 60p, 53rd story, 2nd apartment from south at west
Oct 6, 2026 · Apt 60P
Open — Invalid certification - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 60g, 53rd story, 2nd apartment from north at east
Oct 6, 2026 · Apt 60G
Open — Civ14 mailed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 60p, 53rd story, 2nd apartment from south at west
Oct 6, 2026 · Apt 60P
Open — Civ14 mailed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 27, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed
DOB building violations · 7
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Construction other optional
Boro commissioner has ordered work stopped for # 420656695 d ue to general contractor withdrawal
Apr 18, 2022
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2016 annual high pressure boiler inspection
Jun 22, 2018
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2016 annual high pressure boiler inspection
Jun 22, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2010
Dob violation - resolved
ECB violations · 33
- Class - 2
Upon inspection of an active 67 story nb i observed a temp construction fence constructed and maintained contrary to code at expos 1, 2 & 4. incorrect viewing panel size installed at expos 1 & 2. i observed mul
Jan 3, 2025 · Penalty $1,000
Resolve - Class - 2
3308.5 vertical safety netting systems. upon inspection of an active 67 story nb i observed an inadequately maintained netting system installed on the 4th floor setback at all exposures and at corners on the 66
Jan 3, 2025 · Penalty $2,500
Resolve - Class - 2
Upon inspection i observed a sidewalk shed installed at exposure 2 contrary to code. i observed blue and red horizontal sidewalk shed braces installed and a portion of the sidewalk shed parapet visible to the p
Jan 3, 2025 · Penalty $1,250
Resolve - Class - 2
I observed pedestrian protection (side walk shed) installed at exposure 4 contrary to code. multiple mudsills not secured to vertical members or secured against movement in any direction contrary to code 3307.6
Jan 3, 2025
Resolve - Class - 1
During inspection regarding an incident were a worker sprained their ankle; the workers foot fell into a 5 inch wide hole. the housekeeping was inadequate, the holes in the floor were not covered as required to
Dec 16, 2024 · Penalty $2,500
Resolve - Class - 2
I observed pedestrian protection (sidewalk shed) installed at exposures 2&4 contrary to codes: 3307.6.4.7 height & 3307.6.4.11 color- blue pipe header across pathway set at height below minimum 8ft requirement
Oct 3, 2024 · Penalty $2,400
Resolve - Class - 1
Bc3308.5 vertical safety net system. follow up inspection to incident of material dislodged off of 67story nb site observed vertical safety netting system in place not maintained&net dislodged off of site(on mt
Jun 25, 2024 · Penalty $5,000
Resolve - Class - 1
Two pieces of plywood have fallen off 4th sty setback onto public sidewalk on 44th street., safeguard public and property
Jun 24, 2024 · Penalty $25,000
Resolve - Class - 2
At the time of an incident where, a worker stepped over a pile of metal studs on the 2nd floor which caused him trip and fall injuring his left hip and elbow. inspection reveal poor housekeeping was the cause o
May 9, 2024
Resolve - Class - 2
Observed jekko moving crane in use at 63rd floor -uppon asking for anchors pull test installed with angle for tiebacks to floor slab-none were provided(provided hilti man specs with no enginer stamp)-stop all u
Apr 30, 2024 · Penalty $1,250
Resolve
Show 23 more ↓
- Class - 2
Observed supported scaffold installed at 68/roof level contrary to plans-missing tie ins to building on first row as on plans,misssing end/guardrail system,planks overlapping more than 12 inch(aprox 2-3 feet)/l
Apr 30, 2024
Resolve - Class - 2
Observed sidewalk shed installed on concrete bariers-installed contrary to plans -installed 1 bolt on each side of uclamps-as per plan it should be 2 bolts on ech side of uclamp
Apr 30, 2024
Resolve - Class - 1
At time of inspection on a proposed 67 stories new building at 62 floor approximately 200 feet above last hydrostatic test at 42 floor, upon request for hydrostatic test none was provided, creating an unsafe vi
Jan 16, 2024 · Penalty $5,000
Resolve - Class - 2
Responding the incident where a carpenter was moving material at 24 floor using an a-frame car slipped and hurt inspection revealed. gc failure to institute and maintain safety measures, inadequate housekeeping
Jan 16, 2024
Resolve - Class - 1
Responding the incident where a carpenter was moving material at 24 floor using an a-frame car slipped and hurt inspection revealed. missing information on pre-shift safety meeting about site conditions, and ac
Jan 16, 2024 · Penalty $12,500
Resolve - Class - 1
Hmo john mize #9956 was operating tower crane cd 5554 under cn 1113/22, failed to update nccco certification under 1rcny 104-09(b); 1rcny 104-09(b), comply with rule
Apr 17, 2023 · Penalty $625
Resolve - Class - 2
Noted i observed excavation approx. 15ft deep with an excavation machine and workers in the controlled access zone at expo 1 with no guardrail system (including toeboards) installed to protect from debris from
Mar 18, 2023
Resolve - Class - 2
Noted i observed an excavator equipped for rigging & hoisting. after reviewing provided drawings it was determined there were no documents stating means & methods while use of the excavator for rigging. such as
Mar 18, 2023
Resolve - Class - 2
Observed 2 workers installing lagging at exposure #1, 2 adjoining bays had back-fill removed and approx: 4-5ft unsupported soil in the bay they were working on and the adjoining bay had approx: 8ft unsupported
Feb 8, 2023
Resolve - Class - 1
Responding to incident where a worker cut shin with cutting saw. inspection reveal that worker failed to received required information about hazardous conditions using power tools during work; no information on
Nov 15, 2022
Resolve - Class - 1
Responding to incident where a worker cut shin with cutting saw. inspection reveal that worker failed to maintain a safe distance, saw was use at an awkward angle and cutting piece was not supported as require
Nov 15, 2022
Resolve - Class - 1
Respond to incident@66 story nb site in excavation/foundation phase observe 43-35 24 st 3rd fl window damaged evident by broken bedrocks on top of sidewalk shed.site personnel stated object projectile out of pi
Nov 2, 2022 · Penalty $10,030
Resolve - Class - 1
Fail to provide window protection bc3309.14 @66story nb site in excavation/foundation phase responding to incident observe exposure#2 of 43-16 24 st 2nd fl windows adjacent to site missing window protection to
Nov 2, 2022 · Penalty $625
Resolve - Class - 2
Project information panel/construction signs not provided or not in compliance with section.at time of inspection observed that information panel was not eligible.remedy:provide and maintain adequate project pa
Jun 4, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33.no time of inspection on this major nb construction site. i observed work on going on almost every floor.6 hoists were being used at this sit
Jan 30, 2020
Resolve - Class - 2
Fence not constructed to code. notes: at time of inspection on an opennb job site,i observed a construction fence out of plumb,leaning w/loose boards into pedestrian walkway creating a hazard to fall over onto
Oct 31, 2019 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operations.at time of inspections of 2 story demo, responding to above complaint,masonry wall fell onto public street damaging cars which
Feb 7, 2017 · Penalty $400
Resolve - Class - 1
3309.11tree protection.at time of inspection while responding to complaint,the following was obsrved.2 story building being demolished has had a wall collapse at exp 2 damaging trees which have not been protect
Feb 7, 2017 · Penalty $400
Resolve - Class - 1
Failure ot carry out demolition operations as per code/section at timeof inspection responding to complaint #4681309,unbraced masonry wall fell into street damaging cars.contractor did not remove chain link fen
Feb 7, 2017 · Penalty $400
Resolve - Class - 1
Work w/o a permit. time of inspection 9:40am above the date. at time of inspection i observed on first floor and on roof gas lines for uniton roof and gas heater on 1 floor cut and removed. also i observed ope
Jul 13, 2016 · Penalty $1,630
Resolve - Class - 2
Altered/changed building occupied without a valid certificate of occuapncy. as per 28-118.3.1 alt type 1-job 400902216 to convert factory abd warehouse to office & shipping area. now occupied 1st anf 2nd floor
Jun 29, 2009 · Penalty $500
Resolve - Non-hazardous
50a/50b/-1998 fulton 82500. 50a-the safety valve must be installed as close to the boiler as possible.50b-reverse the valves on the bottom blowdown line.
Apr 19, 2005
Resolve - Non-hazardous
50a/50b/-1998 fulton 82189. 50a-the safety valve must be installed as close to the boiler.50b0reverse the valves on the bottom blowdown line.
Apr 19, 2005
Resolve
Complaints
- General
Cooking gas
Oct 13, 2026 · Apt 62E
Open - Heat/hot water
Entire building
Oct 9, 2026 · Apt 57D
Close - Heat/hot water
Entire building
Oct 9, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Oct 8, 2026 · Apt 7M
Open - General
Cooking gas
Oct 8, 2026 · Apt 60K
Open - Heat/hot water
Entire building
Oct 8, 2026 · Apt 60K
Open - General
Cooking gas
Oct 7, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Open - General
Cooking gas
Oct 6, 2026 · Apt BLDG
Open
Show 25 more ↓
- Heat/hot water
Entire building
Oct 6, 2026 · Apt 61G
Open - General
Cooking gas
Oct 6, 2026 · Apt 61G
Open - Heat/hot water
Apartment only
Oct 6, 2026 · Apt 62P
Close - Heat/hot water
Apartment only
Oct 6, 2026 · Apt 60E
Close - Appliance
Electric/gas range
Oct 6, 2026 · Apt 60E
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt BLDG
Close - Plumbing
Water supply
Oct 5, 2026 · Apt 62P
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt 57M
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt 60D
Close - Heat/hot water
Apartment only
Oct 5, 2026 · Apt 60P
Open - General
Cooking gas
Oct 5, 2026 · Apt 60P
Open - Plumbing
Water supply
Oct 5, 2026 · Apt BLDG
Close - General
Cooking gas
Oct 5, 2026 · Apt 57D
Open - Heat/hot water
Entire building
Oct 5, 2026 · Apt 57D
Close - Unsanitary condition
Pests
Sep 1, 2026 · Apt PH3D
Close - General
Signage missing
Jul 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 21, 2026 · Apt 25C
Close - General
Ventilation system
May 3, 2026 · Apt 58J
Close - Door/window
Window frame
Apr 27, 2026 · Apt 52N
Close - Safety
Fire escape
Oct 15, 2025 · Apt BLDG
Close - Door/window
Window frame
Oct 13, 2025 · Apt 42A
Close - General
Cooking gas
Aug 1, 2025 · Apt BLDG
Close - General
Cooking gas
Jul 25, 2025 · Apt BLDG
Close - General
Cooking gas
Jul 21, 2025 · Apt BLDG
Close - Appliance
Electric/gas range
Jun 24, 2025 · Apt 24M
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2022
- Floors
- 67
- Residential units
- 938
- Building area
- 992,460 ft²
- Lot area
- 56,459 ft²
- Zoning
- M1-6/R10
- Community board
- 402
- Council district
- 26
- Block / lot
- 436 / 1
- Assessed value
- $83,389,950
- Landmark / historic district
- No
HPD registration #434492, last renewed Jun 25, 2025.
Questions about 43-30 24 Street
Who owns 43-30 24 Street?
The owner of record in NYC Department of City Planning PLUTO data is Cp Viii Lic Owner, LLC.
Does 43-30 24 Street have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 43-30 24 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 43-30 24 Street built?
City records list 2022 as the year it was built.
How many apartments are in 43-30 24 Street?
It has 938 residential units and 939 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.