25-01 43 Avenue is a hotel built in 2018 in Queens, 11101. The owner of record is Royal Hi Hotel Holdings, L.p.. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 6
- ECB violations
- 28
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 6
- Construction other optional
Borough commissioner has ordered work stopped for #421410734 due to general contractor withdrawal.
Nov 30, 2023
Dob violation - dismissed - Construction other optional
Commissioner has issued 15 day letter of intent to revoke permit #421410734 job requires superseding applicant as original applicant cannot file with dob
May 14, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 28, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 28, 2018
Vp*-violation unserved ecb- dismissed
ECB violations · 28
- Class - 2
Bc 3307.6.3-area to be protected-sws///at the time of my inspection i observed supported scaffolds installed at exp#1 and exp#4 on top of shed-supported scaffold installed aprox 1' at exp#1 and aprox 2' over ad
Jan 9, 2025
Resolve - Class - 2
Failure to provide information panel construction site.noted:at time of inspection of active construction site observed at exp #1 #4 project information panel with no content no telephone number of owner of pro
Jul 26, 2022
Resolve - Class - 2
Temporary construction equipment onsite-expired sidewalk shed permit.at time of inspection at an active jobsite nb proposed 9 story transient hotel it was observed failure to review expired sidewalk shed permit
Oct 15, 2021
Resolve - Class - 2
Bc3301.13.13/failure to maintain jobsite logs.at the time of my inspection proposed 7 sty nb currently at roof level.cs was at site.upon request for jobsite logs,provided logs last signed at 12/31/19 cs told lo
Jan 24, 2020
Resolve - Class - 1
Failure to designateed competent person.at the time of my inspection proposed 7 story nb currently at roof level.cs was at the site approx 10 wokers performing their job upon requiest for competent person,const
Jan 24, 2020 · Penalty $5,000
Resolve - Class - 1
Bc3301.12/failure to provide workers safety orientation logs and safety meeting logs.at the time of my inspection proposed 7 sty nb currently at roof level.cs was at site approx 10 workers at site upon my reque
Jan 24, 2020 · Penalty $625
Resolve - Class - 2
Sidewalk shed. at time of inspection of new bldg under construction,i observed along perimeter of jobsite at exp's#1&4 sidewalk shed/overhead protection for pedestrian walkway. upon request for installation
Dec 23, 2019 · Penalty $625
Resolve - Class - 1
No overhead protection. at time of my inspection of new bldg under construction-construction at roof level. i observed no o.h.p. installed for adj parking lot(nyc dot)located at exp#2. this creates a hazardous
Dec 23, 2019 · Penalty $10,000
Resolve - Class - 1
Sec. 3308.6 horizontal netting. at time of my inspection of new bldg under construction. i observed missing horizontal safety netting missing at exp#1,2&4. missing horizontal netting creates a hazardous conditi
Dec 23, 2019 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved documents at time of my inspection of new bldg under construction i observed waterfilled yodock barriers along pedestrian walkway missing in several location detailed full leng
Dec 23, 2019 · Penalty $625
Resolve
Show 18 more ↓
- Class - 2
Failure to perform duties as per code upon review of const. superintendents daily log book. at time of my inspection of new bldg under construction,i observed violating conditions noted on ecb#'s 35404619m;21l,
Dec 23, 2019 · Penalty $5,000
Resolve - Class - 1
Sec. 3309.1 protection of adjoining properties. at time of inspection i observed damage to parapet wall of occupied adjoining property at ex#3(rear of bldg)observed impact damage from falling debris/material
Dec 23, 2019 · Penalty $2,500
Resolve - Class - 1
3301.13.1/site safety plan missing.at time of inspection on an active jobsite of a 9 story building currently at 2 story form work.upon request for site safety plan as required per 2017 local law 81 none was pr
Aug 28, 2018 · Penalty $2,500
Resolve - Class - 1
Sidewalk shed where required.at time of inspction on an active jobsite of a 9 story building currently at 2 story formwork observed that sidewalk she dis missing at expo#1 and expo#4/stop all work entire site.r
Aug 28, 2018 · Penalty $10,000
Resolve - Class - 1
Bc3301.7/design drawings missing.at time of inspection on an active josite of a 9 story buildng currently at 2 story formwork observed,formwork made out a 2'x 2' and 4'x 4'wood.when i asked for design drawings
Aug 28, 2018 · Penalty $2,500
Resolve - Class - 1
Construction superintendent failed to perform duties per code. as not ed: at time of inspection on an active construction site, observed logbook provided to me by the competent person showing thta the superint
Aug 6, 2018 · Penalty $2,500
Resolve - Class - 2
Logs. as noted: at time of inspection on an active construction site, observed log book not signed by site super on a daily basis. the competent person informed me that the site super is not on the job site eve
Aug 6, 2018
Resolve - Class - 1
Inadequate &/or missing guard rails. @ time of insp observed guard rails had caps of more than 6" @ columns & toe boards were not correct height. also observed area where guard rail was not around corner which
Jul 26, 2018 · Penalty $2,500
Resolve - Class - 1
Design drawings for elev shaft, @ time of insp observed platforms for 2 elevator shafts located @ grade level. platforms were unsecured w/ no rail system to prevent access. no designs drawings to show that plat
Jul 26, 2018 · Penalty $6,250
Resolve - Class - 2
Sec: bc 3303.7.2. fire extinguishers. @ time of insp observed fire extinguishers @ working heights & that the extinguishers observed were "10 abc" & not "20 abc" as required by fire code. rem: comply w/ fdny co
Jul 26, 2018
Resolve - Class - 1
3303.14.2 no permit for drainage of excavation into seven upon my insp of a 9 story,nb work in progress.i observed a black hose connected to a sump-pump in a plastic bucket w/the other end passing through the f
Jul 26, 2018
Resolve - Class - 2
Sec: bc 3307.2. pedestrian walkway. @ time of insp observed protection of pedestrian walkway inadequate protected walkway was not continuous creating a condition where vehicular traffic could strike pedestrian
Jul 26, 2018 · Penalty $625
Resolve - Class - 2
Failure to safeguard public & property affected by construction operation. @ time of insp observed entry/exit door to site opened onto sidewalk & not into site as required. this creates a condition where public
Jul 26, 2018 · Penalty $5,000
Resolve - Class - 2
Bc3301.7 failure to provide pe approved design drawings. as noted: at time of inspection on an active construction site. observed 1st fl to 2nd fl formwork placement work. no pe approved detail design drawings
Jul 24, 2018 · Penalty $1,250
Resolve - Class - 2
Sec: 28-105.5. forms filed w/ dob do not have required signatures. as noted: @ time of insp on an active construction site. observed, tri special insp field w/ dob line#5 design applicants statements of signatu
Feb 8, 2018 · Penalty $800
Resolve - Class - 1
Work does not conform to approved construction documents at the time of inspection it was observed that the contractor did not perform the support of excavation work as per the approved s.o.e plan.exposure #2
Nov 28, 2017 · Penalty $6,000
Resolve - Class - 2
Construction superintendent failed to perform duties as per rule.at the time of inspection construction super mason chen was not on site hislog book was not signed.the followeing vioaltions were observed.no
Nov 28, 2017 · Penalty $5,000
Resolve - Class - 2
Sec. 3309.6 failure to monitor adjoining structures for movement in all directions during excavation activities. at the time of inspection no mmonitoring observed for movement of the adjoining structures at exp
Nov 28, 2017 · Penalty $2,000
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2018
- Floors
- 9
- Residential units
- —
- Building area
- 24,346 ft²
- Lot area
- 4,370 ft²
- Zoning
- M1-5/R7-3
- Community board
- 402
- Council district
- 26
- Block / lot
- 430 / 37
- Assessed value
- $4,254,300
- Landmark / historic district
- No
Questions about 25-01 43 Avenue
Who owns 25-01 43 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Royal Hi Hotel Holdings, L.p..
Does 25-01 43 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 25-01 43 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 25-01 43 Avenue built?
City records list 2018 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.