22-19 41 Avenue
Queens, NY 11101BBL 4-00409-0001Map
Owner of record: Spar Knitwear Corp
22-19 41 Avenue is a warehouse built in 1922 in Queens, 11101. The owner of record is Spar Knitwear Corp. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 50
- ECB violations
- 37
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 50
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2019
Dob violation - resolved
Show 40 more ↓
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2016
Dob violation - resolved - High pressure boiler boiler required
Violation issued for failure to file 2013 annual high pressure boiler inspection
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 15, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 15, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 16, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 16, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2011
Dob violation - resolved - Construction other optional
C-construction other optional
Jul 24, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 4, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 4, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 4, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 6, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 6, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Elevator elevatorrequired
4f246
Aug 29, 2002
Dob violation - resolved - Elevator elevatorrequired
4p99
Aug 29, 2002
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 21, 1992
Vp*-violation unserved ecb- dismissed - Facade facade optional
Ll1080-local law 10/80 - facade facade optional
Jul 1, 1992
Dob violation - dismissed - Elevator elevatorrequired
Device #4p99
Dec 31, 1990
Vp-violation unserved ecb-active - Elevator elevatorrequired
Device #4f246
Dec 31, 1990
Vp-violation unserved ecb-active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 1990
Dob violation - resolved
ECB violations · 37
- Class - 2
Missing bolts & dogs on boiler doors,seal all holes in boiler room,repair exposed wires,correct violation & send in certificate of correction
Apr 21, 2023
Resolve - Class - 3
Failure to post exterior wall condition certificate as required under 1rcny 103-04(f). as noted: at the time of inspection there were no certificate posted on site at a conspicuous location. remedy: post certfi
Dec 10, 2021
Resolve - Class - 2
Failure to maintain exterior bldg walls&appurtenances.as noted:atoi i observed on exp1 41stave:broken window pane on 4fl sw corner of elevation,cracked masonry@1fl over main entrance ramp.exp3n elevation:spalli
Dec 10, 2021
Resolve - Class - 2
Failure to maintain exterior building facade & appurtenances. (1)exp #1 (41-ave) crack window glass/panel @top floor 7th floor lvl were observe. (2) exposure #4(23-st) crackseveral window glass/panel @top fl
Jul 1, 2019
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/vio# 35264509j issued on 9/13/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01(d)(2). an acceptable certificate has not been filed despite
Jun 8, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #810568. rmdy: submit required technical report.
May 18, 2018 · Penalty $625
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances.note:attime of inspection observe improper supported window a/c unit at various location at south and east facade exposure #1 and 4(41 ave & 23 st)
Sep 13, 2017 · Penalty $500
Resolve - Class - 1
Fail to provide unobstructed exit passageway in that sidewalk shed installed around bldg on 41st ave & 23rd st is blocking emergency entrance sidewalk door to subway. remedy: remove obstruction.
May 29, 2014
Resolve - Class - 3
Work does not conform to approved construction documents or amendments. job #420620073/a2/dwg dated 9.7.12. noted: 1- 6th flr stair 'b' areawc (rm) installed 2 toilets and water heater (plan shown) 3 toilets.
Nov 2, 2012 · Penalty $100
Resolve - Class - 1
Failure to perform a safe/proper inspection of suspended scaffold. noted: upon full inspection the following violating condition are found: tie back no perpendicular with facade, no thimbles, wrong spacing of f
Jul 16, 2010 · Penalty $10,000
Resolve
Show 27 more ↓
- Class - 2
Work doesnt conform to approved construction documents or approved amendments. noted: outrigger beams @ exp# 2 plans show 2 drops @ this exp. there is 1 one long one. the beams are on approx. 35 degree angle pl
Jul 16, 2010
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid cofo.note:@ time of inspection found premises altered from factory(17)to storage(16d)& printing(17b).disapproved alti402276531.rem:obtain a valid cofo
Jul 8, 2010
Resolve - Class - 3
Work w/o a permit installation of a roll down gate present creating off st parking also noted gate is above the height limit of 10 allowed in a m1-3 zone gate approx 20high work 100% complete remedy: obtain
Jun 16, 2009
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/ code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules and regulation
Nov 21, 2008 · Penalty $400
Resolve - Class - 2
Failure to comply with commissioners order to file a c of c with nyc dpet of bldg for notice of vio 34076951h remedy: file c of c as required
Jul 24, 2008 · Penalty $2,000
Resolve - Non-hazardous
Sidewalk shed not adequately maintaned (improper lighting) violation noted: at time of inspection sidewal shed was erected on 23 st and on 41 ave attached to the building. ligjts were off and some lights were m
Aug 12, 2002 · Penalty $1,000
Resolve - Non-hazardous
49, (1) low water cut-out-manual resel switch in panel to reconnect preseut disconnect. (2) flue pipe is undersize for connecting tao blrs. the former be run independently for each boiler. 3-handholes neleded r
Jan 9, 2001 · Penalty $180
Resolve - Non-hazardous
Boiler leaking underneathe the jacket-tubes to refair 2-water columu drain reduced.
Jan 9, 2001 · Penalty $180
Resolve - Non-hazardous
16,49,28b. (1) no approval tages from nyc and ul labs fixed on the boiler and name plate is also missing outside the jacket. 2-submit proof of registeration of this boiler . boiler not in use.
Jan 9, 2001 · Penalty $180
Resolve - Non-hazardous
16,28b,49. (1) approval tags from nyc and testing labs etc. to attach to this boiler.(2)registeration (900-a) farm to be submitted for the said boiler-3-boiler not in use.
Jan 9, 2001 · Penalty $180
Resolve - Non-hazardous
16,49. the orrect heating surface be marked on the name plate three the manufacturer 2- submit proof of registeration for this boiler.
Jan 9, 2001 · Penalty $180
Resolve - Non-hazardous
44h 50o 20i 46 replace hoist cables 50 clean machine 20 repair 7th fl push button
Jun 14, 1999
Resolve - Non-hazardous
50y,73o,46h,74u. install nyc number on machine and main line sw.
Jan 5, 1999
Resolve - Hazardous
Failure to submit a fourth round technical report: periodic inspect- ion of exterior walls and appurtenances as required by local law 10 of 1980 and the department of building rules and regulations. remedy:
Aug 12, 1998 · Penalty $1,000
Resolve - Hazardous
Failure to submit a 4th round technical report: periodic inspection ofexterior walls & appurtenances as required by ll 10 of 1980 & the deptof bldgs rules & regulations. remedy: file the required report.
Jun 2, 1998 · Penalty $2,500
Resolve - Non-hazardous
75#,47i.
Jun 8, 1995 · Penalty $1,000
Resolve - Non-hazardous
75#.
Jun 8, 1995 · Penalty $1,000
Resolve - Non-hazardous
36
Jul 28, 1994 · Penalty $175
Resolve - Non-hazardous
44d,
Jul 28, 1994 · Penalty $400
Resolve - Non-hazardous
32 low water cut off drain nipple leaking to replace
Jan 25, 1993
Resolve - Non-hazardous
32, safely value capacity is inadequate must be more than 2070lbs/hr safety value to be replaced by new one with suitable capacity
Jan 25, 1993
Resolve - Non-hazardous
Exit sign defective illuninated exit signs throughout above premises not in working order(unlit)remedy:exit signs to remain illuninated at all times.
Aug 19, 1992
Resolve - Non-hazardous
Exit door total obstruction. at 3rd and 5th floors obstructed by boxes and pallets. exit door at ground floor n/e obstructed by roll down gates.
Aug 19, 1992 · Penalty $475
Resolve - Non-hazardous
18l,73#,74r, (73) conduct 5 yr. test properly tag device as file elev. 3 form (74) remove hoistway door emergency release switch from car.
Jul 21, 1992
Resolve - Non-hazardous
3o,29o,30o,58o,59o,73#, (3) clean top of car (73) conduct 5 yr. test, properly tag device & file elev. 3 form
Jul 21, 1992
Resolve - Non-hazardous
14i,57o
Dec 31, 1990 · Penalty $75
Resolve - Non-hazardous
57o,35i,35 - glass motor room
Dec 31, 1990 · Penalty $75
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Warehouse (E1)
- Year built
- 1922
- Floors
- 7
- Residential units
- —
- Building area
- 112,000 ft²
- Lot area
- 20,000 ft²
- Zoning
- M1-5A
- Community board
- 401
- Council district
- 26
- Block / lot
- 409 / 1
- Assessed value
- $4,231,350
- Landmark / historic district
- No
Questions about 22-19 41 Avenue
Who owns 22-19 41 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Spar Knitwear Corp.
Does 22-19 41 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 22-19 41 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 22-19 41 Avenue built?
City records list 1922 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.