roofy

38-23 28 Street

Queens, NY 11101BBL 4-00385-0005Map

Owner of record: Howard Development LLC

38-23 28 Street is a hotel built in 2019 in Queens, 11101. The owner of record is Howard Development LLC. HPD has recorded 1 housing violation here, most recently on May 11, 2026. 1 of the 1 most recent violations are still open.

HPD violations
1
DOB violations
3
ECB violations
24
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Open — Nov sent out

DOB building violations · 3

  • Construction other optional

    Boro commissioner has ordered work stopped for # 421614195 due to special inspection agency withdrawal

    Dec 6, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 9, 2020

    Dob violation - dismissed

ECB violations · 24

  • Class - 1

    Class 1 cease use: in-car stop switch inoperative. this is a safety feature which ensures passenger safety. remedy: to restore service, email the d.o.b. elevator division [email protected]. for a reinspecti

    Mar 3, 2026 · Penalty $1,250

    Resolve
  • Class - 1

    Observed in the basement/cellar inadequate ventilation in the gas meter room and no ventilation in the boiler room housing three gas fired water heaters. as per e4 of the fgc natural ventilation shall have an o

    Mar 3, 2026 · Penalty $6,280

    Resolve
  • Class - 1

    Observed in the basement: improper sprinkler heads in the sprinkler and sewage rooms; unsealed pipe penetrations missing firestopping; and pvc used on waste line in laundry room. on the ground floor, bathrooms

    Mar 3, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetration throughout basement level., provide/maintain fire stopp

    Sep 18, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Observed in the basement/cellar inadequate ventilation in the gas meter room and no ventilation in the boiler room housing three gas fired water heaters. as per e4 of the fgc natural ventilation shall have an o

    Sep 18, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to institute/maintain construction fence as per code.at the time of inspection this was a 6 story active construction site performing exterior and interior work.as per permimeter inspection,i observed t

    Aug 17, 2021

    Resolve
  • Class - 2

    3301.2 failure to provide adequate afety measures.at the time of inspection this was a 6 story active construction site performing exterior work at exp3 and interior finishing.i observed inadequate caz at exp3.

    Aug 17, 2021

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping as per section requirements.at the time of inspection this was a 6 story active construction site performing work on exterior super structure and interior finishing.i o

    Aug 17, 2021

    Resolve
  • Class - 2

    Failure to maintain/display on site documents required by chapter 33. noted: at the time of my inspection of active 6 sty new bldg construction jobsite. i observed bldg topped off,upon request for on-site docum

    Feb 24, 2021 · Penalty $3,125

    Resolve
  • Class - 1

    Sec. 2113.1.6.1 responsibility of owner of taller bldg. noted: at timeof my inspection of a new 6 sty bldg construction in progress,bldg topped off,i observed upon entering the 3rd fl balcony at exp#1 that the

    Feb 24, 2021 · Penalty $6,250

    Resolve
Show 14 more ↓
  • Class - 2

    Work does not conform to approved construction documents and/or amendments.at time of inspectionof a new 6 storie building,construction in progress,i observed to the sidewalk shed was not as shown on the appro

    Jun 9, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Holes/openings not covered.noted:at time of my inspection of a new 6 stories building,construction in progress,i observed numerous holes andopenings which had no or inadequate coverings throughout the building.

    Jun 9, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Bc330910-no roof protection-skylight-chimney-coping.noted:at time of my inspection of a new 6 storie building construction in progress at the 4-5th floor level,i observed the adjoining property at exposure#2 wa

    Jun 9, 2020 · Penalty $3,125

    Resolve
  • Class - 1

    Bc3303.11 failure to maintain permanent stairs.as noted:at time of inspection on an active job site observed workers working on fl #6,rebar placement work,no one permanent staircase on the new bldg.permanent st

    Feb 26, 2020 · Penalty $6,250

    Resolve
  • Class - 2

    Bc 3301.7 failure to provide p.e. approved detail design drawings.as noted:at time of inspection on an active construction site,rebar placement work at fl #6.failure to provide p.e. approved drawings for (a)she

    Feb 26, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Jobsite fence at the time of my inspection proposed 6 sty nb active at 1 sty level observed jobsiet fence was not as per code fence gates was swinging to sw and blocking pedestrian walkway also panel was inadeq

    Jan 14, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    3303.15.1=collection and containment at the time of my inspection proposed 6 sty nb active at 1 sty level observed concrete wasout water with cement and sand on roadway there was wasont units at site but not co

    Jan 14, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    3301.13.13=inadequate jobsite logs at the time of inspection proposed 6 sty nb active at 1 sty level upon request competent persons provided jobsiet log book observed missing comepetent person sign for last few

    Jan 14, 2020 · Penalty $3,125

    Resolve
  • Class - 1

    3301.2=rebar caps.at the time of my inspection proposed 6 sty nb at 1 sty level site actiev approx 10 workers performing their job at site observed missing rebar caps all over the site .site conditions was simp

    Jan 14, 2020 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to safeguard at the time of my inspection porposed 6 sty nb actiev at 1st level observed dumpster loader leading concrete wasout unit on roadway loader was moving front/back to load concrete was out uni

    Jan 14, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    3304.4.4=failure to provide guardrails system at the time of my inspection proposed 6s ty nb foundtaion level work in progress observed missing guard rails at exos 3 where approx 20 ft deep excavated area could

    Nov 6, 2019

    Resolve
  • Class - 1

    3304.7=inadequate egress at the time of my inspetcion proposed 6 sty nb foundation elevl work in porgress observed approx 20 ft deep excavation area at expos 3 where missing adequate egres contractor failed to

    Nov 6, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection, fence is not erected to plans on exposure 2 of the construction site shows the fence to allow 1' 11" of clearest between adjacent property an

    Sep 13, 2019 · Penalty $830

    Resolve
  • Class - 2

    Work w/o a permit expired. as noted: at time of inspection construction site was closed.observed construction plywood fence has expired on 04/28-17 permit #421254458-01-eq-fn.rmdy:comply with code.renew plywoo

    May 17, 2017 · Penalty $800

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H3)
Year built
2019
Floors
6
Residential units
—
Building area
13,920 ft²
Lot area
5,021 ft²
Zoning
M1-2/R5B
Community board
401
Council district
26
Block / lot
385 / 5
Assessed value
$2,344,500
Landmark / historic district
No

Questions about 38-23 28 Street

Who owns 38-23 28 Street?

The owner of record in NYC Department of City Planning PLUTO data is Howard Development LLC.

Does 38-23 28 Street have violations?

Yes. NYC HPD has recorded 1 housing violations at this property.

Is 38-23 28 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 38-23 28 Street built?

City records list 2019 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.