25 Street
Queens, NY 11101BBL 4-00367-0033Map
Owner of record: 3720 Crescent LLC
25 Street is a garage / gas station in Queens, 11101. The owner of record is 3720 Crescent LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 0
- ECB violations
- 17
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 0
No DOB violations on record
ECB violations · 17
- Class - 2
Performed weather advisory sweep on closed jobsite for newly erected 6-story building. upon inspection, observed no watchperson present on closed jobsite after banging on metal door and calling out loudly sever
Jun 7, 2026 · Penalty $2,500
Resolve - Class - 2
Active 6story nb. noted material piles, debris, tools, & personal equipment were littered throughout each floor and in corridors creating trip/slip hazards for onsite personnel as well as egress being obstructe
Jun 1, 2026
Resolve - Class - 2
Active 6story nb. observed sws installed at expo1 was contrary to plans. noted on expo1 the sws was installed with a truss however upon review of approved plans, the use of the truss was not shown on plans for
Jun 1, 2026
Resolve - Class - 2
6story nb. noted unprotected leading edges on the balconies at floors 2-5 (@expos 1&3) not maintained per 3308. inadequate guardrail/cable systems in use not per ssp or 3308.5/3308.7; sheetrock used to protect
Jun 1, 2026 · Penalty $2,500
Resolve - Class - 2
Proposed 6 story building. active site during superstructure phase with unfinished exterior work. observed sidewalk shed/ohp at exp#2, upon reviewing the sws drawings cross bracing is misplaced and not installe
Apr 24, 2026
Resolve - Class - 1
On dec 08, 2025 at 5:30 pm a worker was found face down on the 2nd story setback at exposure #3. an ambulance was called the worker taken to the hospital were the worker scummed to their injuries at 7:08 pm the
Dec 9, 2025 · Penalty $10,000
Resolve - Class - 1
Inspection of a 6-story new build where a worker fell from the 4th story to the 2nd story setback @ exposure #3 & succumbed to their injuries, i observed that the unsecured deck the worker fell through, had no
Dec 9, 2025 · Penalty $10,000
Resolve - Class - 2
Bc 3306.9.10.3 holes in floor: during inspection of a 6-story new build where a fatality occurred, i observed that there were multiple uncovered penetrations in the floors throughout the site. there was also a
Dec 9, 2025 · Penalty $2,500
Resolve - Class - 1
Bc3309.10during inspection of a 6-story new build i observed that there was no roof protection for property 37-10 crescent at exposure #4 which is required to be in place the construction site had reached over
Dec 9, 2025 · Penalty $5,000
Resolve - Class - 1
Bc3301.1.3 (2014 code) during inspection of a 6-story new build i observed that there was a table saw onsite that was missing the required safety guard. the guard protects the high-speed cutting blade from proj
Dec 9, 2025 · Penalty $2,500
Resolve
Show 7 more ↓
- Class - 2
Bc3303.4.10means of egress while going up and down the temp wooden ladders at each walking/working deck they were not extended 3 feet past the slab the lack of the ladder extension means that there was nothing
Dec 9, 2025 · Penalty $2,500
Resolve - Class - 1
During inspection of a 6 story building where a worker fell from the 4th story to the 2nd story rear setback, i observed that there were missing rebar caps around the perimeter. the lack of rebar caps creates a
Dec 9, 2025 · Penalty $5,000
Resolve - Class - 1
A new build where a worker fell from the 4th story to the 2nd story setback at exposure #3 and succumbed to their injuries, i observed that the unsecured deck where the worker fell through, had no bracing on th
Dec 9, 2025 · Penalty $10,000
Resolve - Class - 1
On december 08, 2025 around 5:30 pm a worker was found face down on the 2nd story setback at exposure #3. an ambulance was called, the worker taken to the hospital were the worker succumbed to their injuries at
Dec 9, 2025 · Penalty $10,000
Resolve - Class - 1
At time of inspection of a proposed 6 story build i observed that there was construction material and debris throughout the site. there were large piles of black bags, wood (2x4) plywood, and metal frames and u
Dec 9, 2025 · Penalty $2,500
Resolve - Class - 1
Inspection of a 6-story new build where a worker fell from the 4th story to the 2nd story setback at exposure #3 and succumbed to their injuries, i looked for the orientation of the worker mario vivanco. review
Dec 9, 2025 · Penalty $5,000
Resolve - Class - 1
During inspection of a 6-story new build where a worker fell from the 4th story to the 2nd story setback at exposure #3 & succumbed to their injuries i request to see the pre-shift that should had been given to
Dec 9, 2025 · Penalty $5,000
Resolve
Complaints
- Paint/plaster
Wall
Jun 18, 2024 · Apt 33
Close - Unsanitary condition
Pests
Jun 18, 2024 · Apt 33
Close - Unsanitary condition
Pests
Jun 18, 2024 · Apt 33
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Garage / gas station (G7)
- Year built
- —
- Floors
- —
- Residential units
- —
- Building area
- —
- Lot area
- 13,647 ft²
- Zoning
- M1-2/R5D
- Community board
- 401
- Council district
- 26
- Block / lot
- 367 / 33
- Assessed value
- $1,017,000
- Landmark / historic district
- No
Questions about 25 Street
Who owns 25 Street?
The owner of record in NYC Department of City Planning PLUTO data is 3720 Crescent LLC.
Does 25 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 25 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.