37-25 12 Street
Queens, NY 11101BBL 4-00362-0009Map
Owner of record: 37-25 12 Street LLC
37-25 12 Street is a hotel built in 2019 in Queens, 11101. The owner of record is 37-25 12 Street LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 9
- ECB violations
- 38
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 12, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 21, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 22, 2023
Dob violation - dismissed - Construction other optional
Additional information. nb#420855275, proposed 9 story hotel bldg concrete construction. provide signed/sealed copies of the tr1 reports for concrete cast-in-place and copies of the signed/sealed,latest approved struct dwgs for foundation and superstructive. remedy:provide the requested information above dec 30, 2020
Dec 12, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 24, 2020
Vp-violation unserved ecb-active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 8, 2018
Vp*-violation unserved ecb- dismissed
ECB violations · 38
- Class - 1
Bc 3301.13 failure to have construction superintendent or competent person on active jobsite, as required. obsvd 9 str nb, with 6 workers on site, performing furniture assembly on multiple floors. cs #0030629 d
Jun 11, 2024 · Penalty $5,000
Active - Class - 1
Bc 3303.12 elevator/not in readiness. observed 9 str/99 ft nb- topped off- active job w/ 6 workers on site, with the interior elevator not operational at the time of the inspection, and no other elevator or hoi
Jun 11, 2024 · Penalty $5,000
Active - Class - 1
Bc 3303.8 standpipe not in readiness. obsvd 9 str/99 ft nb- topped off- active job w/ 6 workers present- no gauges instld on top of sd riser & at the fdny conctn point, while review of dpmt records indicates th
Jun 11, 2024 · Penalty $5,000
Active - Class - 2
I observed:destroyed vertical netting between sws and construction fence.sharp edges at vertical post-not protected,bolts without cap.sws vertical posts not secured and high visibility marking as required(vehic
Aug 25, 2023 · Penalty $10,000
Active - Class - 1
At the time of inspection i observed large amount of construction material, debris and leftovers food stored at front yard at exp. # 1.this creates hazardous conditions:tripping hazard,blocking egress.also food
Aug 25, 2023 · Penalty $12,500
Active - Class - 2
Temporary construction equipment on site w/expired permit(constructionfence)note:at the time of my inspection of a proposed 9 story bldg newbldg w/a construction fence at the bldgs exp.#1 upon review of dept.re
Apr 1, 2022
Resolve - Class - 2
Failure to safeguard all public and property.note:at time of inspection of 9 story new building at roof level jobsite not active no workers observed constructin fence entrance wood gate is open with no chain or
Oct 19, 2021 · Penalty $500
Resolve - Class - 2
Failure to properly secure.support electrical metallic tubing (emt) ato my insp on closed&permitted jobsite,i observed sws [email protected] also observed that permit holder under permitq00088563-i1-el for e
Aug 20, 2021
Resolve - Class - 2
Failure to safeguard all persons&property affected by construction operations. in response to above mentioned complaint#4851344 observed on the roof of 37-22 13 st plywood,2x4,insulation&unsecured planks scatte
Jul 10, 2021 · Penalty $5,000
Resolve - Class - 2
Pedestrian protection does not meet code specifications. in response to above mentioned complaint#4851344 observed at exposure#1,missing protection to enclose the gap between the fence&sidewalk shed to prevent
Jul 10, 2021 · Penalty $2,400
Resolve
Show 28 more ↓
- Class - 2
Sec. 3314.8.2 debris netting. noted: at timme of inspection i observedconstruction site for which a cs in required w/the debris netting of the supported scaffold installed or exp#1 not securelt fasten to the sc
May 21, 2020 · Penalty $625
Resolve - Class - 2
Bc3309.14 proportion of windows.at the time of my inspection on an active construction jobsite 9-story new bldg i observed windows at adjacent property at exp#3 had no protection.failure to provide windows prot
Mar 18, 2020 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments.note:at the time of my inspection on an active constructionjobsite 9 story new bldg i observed (infractured) temporary ( ) at top
Mar 18, 2020 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction docs.at time of inspection of an active site i observed a supported scaffold installed at exp3.i observed the footing was installed on structural steel beams spann
Jan 8, 2020 · Penalty $625
Resolve - Class - 1
Failure to comply w/comm'sorder.at time of my inspection of active site i found construction supers log book and pre shift meeting records indicating an active jobsite throughout november,december and january(n
Jan 8, 2020 · Penalty $2,500
Resolve - Class - 2
Bc 3314.4.4.5 dislodgement.at time of inspection of an active jobsite,i observed supported scaffold at exposure 1&3.i observed throughout the entirety of the scaffolds material and debris stored by the decks as
Jan 3, 2020
Resolve - Class - 2
Work does not conform to construction documents.at the time of inspection of a 9 story new building under active construction i observed supported scaffold erected on all exposures.scaffold erected on all exp-2
Oct 28, 2019
Resolve - Class - 1
Fail to maintain all gaps/holes/openings on construction site. at time of inspection on an active construction site 9 story new building notice on each floor opening/holes that had no cover or
Jun 5, 2019 · Penalty $10,000
Resolve - Class - 1
Work does not conform to approved construction document/plans on site 9 story new building,notice that contractor had a platform in the elevator shaft when looking at the design of platform on drawing
Jun 5, 2019 · Penalty $2,500
Resolve - Class - 1
Inadequate/missing hand rails. at time of inspection on an active construction site notice that the hand rails on floors 1 and basement stairs were missing hand rails 2nd at exposure #3 stairs at the
Jun 5, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to maintain adequate housekeeping on site. at the time of inspection on an active construction site notice that throughout construction site garbage /debris throughout site on each floor
Jun 5, 2019
Resolve - Class - 1
Scaffold not according to plans on site. at the time of inspection on an active construction site notece that the scafffold on this new building had more than one fully planked platforms at a time going
Jun 5, 2019 · Penalty $2,500
Resolve - Class - 2
Construction super.failed to perform duties as per rule:jobsite log/competent person on site.at time of my inspection of a proposed 9 storied nb there was no superintendent on site.there was no designated compe
Apr 18, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to provide accepted construction docs.@ jobsite at time of inspection.at the time of my inspection of a proposed 9 story nb,i observed no documents on site.there was no site safety plan.no design drawin
Apr 18, 2019
Resolve - Class - 1
1906.6.1.2;failure to secure reshores in prximity to the facade as noted.at time of inspection active site i observed at floor #6 exp #1,#2,#3,#4 failure to secure reshores in proximity to the facade-reshores s
Feb 1, 2019 · Penalty $2,500
Resolve - Class - 1
Storage near unenclosed perimeters.as noted,at time of inspection active site 9 floor working deck.i observed materials not being used stored within 10 feet from all uneclosed perimeters at 7th floor expo #1,2,
Feb 1, 2019
Resolve - Class - 1
Housekeeping. at time of inspection at an active jobsite new bldg under construction at 5 sty stage, i observed large amount of debris and construction materials cluttered throughout jobsite at expo.#1 1 story
Nov 26, 2018 · Penalty $2,500
Resolve - Class - 2
3307.7 gates missing. at time of my inspection of a new 9 story bldg. under construction at 5 story stage active jobsite. i observed that the entrance gate to jobsite was missing. this situation creates a hazar
Nov 26, 2018 · Penalty $625
Resolve - Class - 1
1rcny 3301.2 log book. at time of inspection of a new 9 sty. bldg under construction at 5 sty. stage active jobsite, i observed that superintendent's log book was inadequately kept from 11/1-11/26/18 there is n
Nov 26, 2018 · Penalty $2,500
Resolve - Class - 1
Missing guard rails. at time of my inspection of a new 9 story bldg. under construction at 5 story stage active job site. i observed that guardrails didn't exist at expo.#3 first story. this situation creates a
Nov 26, 2018 · Penalty $2,500
Resolve - Class - 1
At time of inspeciton of an active jobsite nb under construction at 5sty stage i observed that super's log was inadequately maintained.no record superintendent visiting or leaving jobsite form november 1 to
Nov 26, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35350918l issued on 09/13/18 and to file a certificatr of correction pursuant to 28-201.1 and 1rcny 102-01. failure to maintain sid
Nov 8, 2018 · Penalty $625
Resolve - Class - 1
Inadequate safety measures, operation of a crane in a unsafe manner attime of responding to complaint #4750096, for "work with a crane with no permit"i observed nysdl#william fernando regalaoo segovia in opera
Oct 3, 2018 · Penalty $10,000
Active - Class - 1
Inadequate safety measures, operation of a crane in a unsafe manner. while respoding ot complaint #4750096 i observed nysdl #960247949 william fernando regalado segovia who is employed by respondent hoisting
Oct 3, 2018 · Penalty $10,000
Resolve - Class - 2
Failure to post permit for work at premises.at time of inspection i observed no permits posted on fence/information pannel on active jobsitepremises as per code.rem:post permit as per code and maintain
Sep 25, 2018
Resolve - Class - 2
Failure to maintain adequate housekeeping at the time of inspection oninactive job site.entrance gate locked.no one was working inside observed const copes left on side walk creating a trip hazard for pedestria
Sep 25, 2018
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operations.at the time of inspection of the proposed 9 stories building at excavation phase,i observed 2 equipments (vehicles) on both side
Sep 13, 2018 · Penalty $10,000
Resolve - Class - 1
Bc3303.4.1.1.failure to maintain sidewalk.at the time of my inspectionon an active job site foundation level work in progress.observed cracks on sidewalk in front of the jobsite at exposure 1 also observed debr
Sep 13, 2018 · Penalty $2,500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2019
- Floors
- 11
- Residential units
- —
- Building area
- 28,540 ft²
- Lot area
- 5,005 ft²
- Zoning
- M1-3
- Community board
- 401
- Council district
- 26
- Block / lot
- 362 / 9
- Assessed value
- $3,064,050
- Landmark / historic district
- No
Questions about 37-25 12 Street
Who owns 37-25 12 Street?
The owner of record in NYC Department of City Planning PLUTO data is 37-25 12 Street LLC.
Does 37-25 12 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 37-25 12 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 37-25 12 Street built?
City records list 2019 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.