roofy

37-02 10 Street

Queens, NY 11101BBL 4-00359-0021Map

Owner of record: Br 10th Street Partners LLC

37-02 10 Street is a hotel built in 2019 in Queens, 11101. The owner of record is Br 10th Street Partners LLC. HPD has recorded 1 housing violation here, most recently on April 17, 2024.

HPD violations
1
DOB violations
41
ECB violations
83
HPD complaints
6

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 17, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 17, 2024

    Closed — Violation dismissed

DOB building violations · 41

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 1, 2022

    Dob violation - dismissed
  • Construction other optional

    Boro commissioner issued notice of order to stop work immediately due to site safety manager withdrawal for application # 421643920-01-nb.

    Jun 2, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 31, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 23, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 11, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
Show 31 more ↓
  • Construction other optional

    Building fully demolished w/o proper permits&waiver to leave foundation in the ground.remedy:amend dm application to reflect actual conditions

    Aug 3, 2018

    Dob violation - dismissed
  • Construction other optional

    Building fully demolished without proper permits and waiver to leave foundation in the ground.remedy:amend dm application to reflect actual conditions

    Aug 3, 2018

    Dob violation - dismissed
  • Construction other optional

    Portion of bldg, including roof, int and ext walls, was demolished perform at least three test pits, remote from each other at location of foundation of the demo bldg to verify whether fdns were removed test pits to be opened by 08/10/2018. coordinate w/ feu to schedule observation of opened test pits

    Jul 31, 2018

    Dob violation - dismissed
  • Construction other optional

    Fail to safeguard adj bldg @9-10 37th st.1s bldg @37-04 was part demo to grade und alt2 perm 421640228ewot.adj bldg 9-10 37thst observe to be lean toward site.cond of 9-10 potentially unsafe&should be monitor for mov't.remedy:ret surv to optically monitor 9-10 37thst.monitor data taken once per day beg 7/9/18.analyses be sub to dob/feu daily

    Jul 9, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed

ECB violations · 83

  • Class - 1

    Cease use items : incar fireman call cancel buttom broken off , provide / both incar emergency stop switch and alarm bell inoperative , repair / non cease use items missing cat 5 test tag on gov , provide / exp

    Feb 3, 2026 · Penalty $1,250

    Resolve
  • Class - 1

    Cease use items : door restrictor inoperative , repair / incar fireman service call cancel button broken off , repace / non cease use items incar emergency comm inoperative , repair / expired log book , provide

    Feb 3, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Class 2 rts: failure to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service.

    Jan 27, 2026

    Resolve
  • Class - 2

    Class 2 rts: failure to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service.

    Jan 27, 2026

    Resolve
  • Class - 1

    Class 1(cu):failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, door zone restrictor on elevator inoperative,repair device and contact ny

    Dec 19, 2025 · Penalty $1,250

    Resolve
  • Class - 1

    Class 1 cease use items: door zone restrictor inoperative - intermittent operation, adjust. both in-car alarm and emergency phone inoperative, repair. these are safety features that ensure passenger safety. rem

    Oct 1, 2025 · Penalty $1,280

    Resolve
  • Class - 1

    Class 1 c/u rts: failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condi

    Sep 3, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Observed outside in the street fire department connection is blocked by a locked fence. on the ground floor standpipe has a broken handle valve. in flue room painted sprinkler head. on the 12 floor missing cap

    Sep 3, 2025

    Resolve
  • Class - 1

    Class 1 c/u rts: failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condi

    Sep 3, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. observed fixed chair staged in public corridor/hallways. potential fire hazard., repair and/or replace

    Sep 3, 2025

    Resolve
Show 40 more ↓
  • Class - 2

    Exit door not self-closing. observed non self closing doors on roof level utility rooms., repair/replace door

    Sep 20, 2024

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner: use of prohibited door and/or hardware per bc 1008.1 (2014 code); 27-371; bc 1008.1.9 (2014 code); bc 1010.1.8 (2022 code); bc 1010.1.9 (2022 code). observ

    Sep 20, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetration in the elecrtical rooms throughout building and utility

    Sep 20, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    I observed in the rooftop electrical room the use of emt through the concrete floor without protection. photos taken, comply with ec code; protect against deterioration.

    Sep 20, 2024

    Resolve
  • Class - 1

    I observed throughout the building the failure to install tamper/resistant outlets in the hallways as required in ll 39/2015. this is an immediate shock hazard. photos taken; ll 39/2015, comply with code; insta

    Sep 20, 2024 · Penalty $625

    Resolve
  • Class - 1

    Observed at stairway to roof level extension ladder being supported by one inch sprinkler pipe., repair and/replace

    Sep 20, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Observed painted sprinkler heads throughout building. as per 102.3 on the plumbing code maintenance. installations, both existing and new, and parts thereof shall be maintained in proper operating condition in

    Sep 20, 2024

    Resolve
  • Class - 2

    Observed unregisteredlaars boiler model rhcv2000nacf2exn, serial# a20303113, maintain boiler; obtain the proper permit, register the boiler and submit a certificate of correction.

    Sep 17, 2024

    Resolve
  • Class - 2

    Observed an unregistered laars boiler model rhcv2000nacf2exn serial # a20303113, maintain boiler; obtain the proper permit, register the boiler and submit a certificate of correction.

    Sep 17, 2024

    Resolve
  • Class - 2

    Work without permit. noted: observed a chain link fence approx. 6 ft height at entire perimeter of holiday inn hotel was installed without department of buildings approval., obtain all permits

    Sep 21, 2023 · Penalty $620

    Resolve
  • Class - 1

    Work doesnt conform w/site safety plan note:@time of my insp of activejobsite,i observed missing approx100' of sidewalk shed@exp1,upon rev site safety plan for sidewalk,it shows sws should be in place along exp

    May 18, 2021 · Penalty $625

    Resolve
  • Class - 1

    Bc3301.7 docs to be kept onsite note:@time of my insp of active jobsite,approx 25-30 workers performing diff const activities.upon request for site safety manager logbook for pervious days,none was provided.pro

    May 18, 2021 · Penalty $625

    Resolve
  • Class - 1

    Permit holder failed to ensure all workers receive site safety orientation.note:@time of my insp of active jobsite,approx 25-30 workers performing const activities.upon request for workers' site safety orientat

    May 18, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Site safety manager failed to notify dept at the time of my inspection i osberved mobile crane inoperation with no permits issued 1-no notifciation was made to dept no complaint #generated 2-ssm unaware that cr

    Mar 7, 2021

    Resolve
  • Class - 1

    Bc3301.13.1-site safety plan at the time of my inspection i observed mobile crane in use lifting mechanical equipment onto roof upon review of site safety plan there was no approxmate location of all crane and

    Mar 7, 2021

    Resolve
  • Class - 1

    Work without a permit at the time of my inspection i observed mobile crane inuse lifting mechanical units onto roof of construction site upon request for permit and review of dept records no permit for crane us

    Mar 7, 2021

    Resolve
  • Class - 1

    False statements upon review of department records at the time of my inspecton variance information item 5 was incorrect a crane was observed in use lifting mechanical units onto roof stop all use of crane unde

    Mar 7, 2021

    Resolve
  • Class - 1

    Failure to notify the dept of an accident/incident that resulted in a fatality or an injury. note=a worker using a circular saw got cut on his knee(left leg) when the saw he was using kicked back and injured hi

    Dec 14, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    28-105.5 forms filed w/ dob do not have required signatures. as noted:at time of inspection on an active construction site,bldg superstructural work completed to bulkhead and interior work on job site. i observ

    Dec 8, 2020

    Resolve
  • Class - 1

    Preshift safety meeting log(content)at time of inspection at 15 sty bldg active jobsite bldg topped off where worker got injured upon request to see preshift safety meeting log the one provided had no mention a

    Nov 16, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures-inadequate handrails. at time of inspection at 15 sty bldg active jobsite i observed handrails inadequately installed also observed nails pertruding out

    Nov 16, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3301.1.3 manufacturer specifications. note: at time of inspectionat 15 sty bldg topped off active jobsite where worker got injured i observed circular saw used to cut ceramic/acrylic shower board. review

    Nov 16, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3301.8.1 use & tampering prohibited. in response to incident where worker cut himself on his knee area while cutting tile board for shower stall i observed room area w/blood spots on floor but all tools

    Nov 16, 2020 · Penalty $625

    Resolve
  • Class - 1

    Sec. 3308.5 failure to maintain vertical netting. at time of inspection at 15 sty bldg active jobsite w/bldg topped off. i observed vertical netting missing toe boards at all stories throughout jobsite. this &

    Nov 16, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Housekeeping. at time of inspection at 15 sty bldg active jobsite bldg. topped off i observed large amounts on construction materials & debris scattered throughout jobsite causing a potential trip & fall hazard

    Nov 16, 2020 · Penalty $625

    Resolve
  • Class - 1

    Orientation. at time of comp inspection where worker got injured at 15 sty bldg toppeed off w/active work in progress upon request to see worker(rzaguliyen vasif)orientation log to verity worker was properly

    Nov 16, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain safety equipment-guardrails. at time of inspectionwhere worker got injured at active jobsite,i observeeed guardrails inadequately maintained at elevator shafts & also at hoist area at roof

    Nov 16, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to institute & maintain safe operations. at time of comp inspection where worker got injured while using circular saw on 2 stacks of form insulation to cut ceramic/acrylic shower stall board instead of

    Nov 16, 2020 · Penalty $10,000

    Resolve
  • Class - 1

    3314.4-supported scaffold at the time ofmy inspection of a 15 stories nb construction work ongoing i observed inadequate scaffold system missing pins gap inbetween the plank debris netting displaced on with win

    Nov 2, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3314.1 unsafe scaffold.note:at the time of my inspection of an active job site,i observed supported pipe scaffold erected up to the roof.ialso observed missing guard rails,hand rails,plants,toe-bords & clips

    Sep 29, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3318.5=hoist machine operator certificate note at the time o f my inspection it was observed an 15 story building under construction where it was noted that monte davis ws oeprating a personnel hoist upon

    Sep 21, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sidewalk not maintained consisting of large cracks holes and voids uneven due to construction activities creating a trip hazard for pedestrian noted at the time of my inspection it was observed at exp # 4 37 a

    Sep 21, 2020 · Penalty $625

    Resolve
  • Class - 1

    Bc3301.5=unsafe conditions and equipment noted at the time of my inspection on a 15 story nb it was observed that the hoist needs oil repair on gates and joy stick operation soon as possible important

    Sep 21, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requiremnts noted at the time o fmy insection it was observed at roof level of a 15 story nb construction debris materials left scattered and loose

    Sep 21, 2020 · Penalty $625

    Resolve
  • Class - 1

    Bc3303.11-stairs during construction or demolition noted at the time o fmy inspection it was observed that building under construction had two staircase a and b it was noted that lighting was not

    Sep 21, 2020 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain.display on site document required by chaptr 33 noted at the time of inspection it was observed nb construction site where it was noted that the hoist maintenance record inside hoist car was

    Sep 21, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Bc3301.6-design drawing of temporary construction required by chpater 33 noted at the time of inspection on a 15 story nb it was noted at exp #4 main entry gate to construction site a plywood road leading to ho

    Sep 21, 2020 · Penalty $625

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and or amendmnts noted at time inspection it was observed that the provided plan for scaffold eq-102.00 did not have the 2 foot extension of scaffold

    Sep 21, 2020

    Resolve
  • Class - 1

    Bc3314.1-scaffold has not been erected and maintained in a safe manner noted at time of my inspection it was observed that the supported scaffold was erected around building and mudsills where covered

    Aug 21, 2020 · Penalty $625

    Resolve
  • Class - 1

    Guardrails note at the time of my inspection of an actiev jobsite construction on progress i osberved at the 13thf loor window openings without guardrails with no installed windows creating a hazardous conditio

    Jul 10, 2020 · Penalty $2,500

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt 708

    Close
  • Unsanitary condition

    Pests

    Dec 29, 2025 · Apt 708

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Sep 5, 2025 · Apt BLDG

    Close
  • Safety

    Window guard broken/missing

    Feb 3, 2024 · Apt 417

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H3)
Year built
2019
Floors
15
Residential units
—
Building area
113,418 ft²
Lot area
20,000 ft²
Zoning
M1-3
Community board
401
Council district
26
Block / lot
359 / 21
Assessed value
$17,250,750
Landmark / historic district
No

HPD registration #434270, last renewed Sep 24, 2025.

Questions about 37-02 10 Street

Who owns 37-02 10 Street?

The owner of record in NYC Department of City Planning PLUTO data is Br 10th Street Partners LLC.

Does 37-02 10 Street have violations?

Yes. NYC HPD has recorded 1 housing violations at this property.

Is 37-02 10 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 37-02 10 Street built?

City records list 2019 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.