105 Oceana Drive East
Brooklyn, NY 11235BBL 3-08720-7512Map
Owner of record: Unavailable Owner
105 Oceana Drive East is a condominium built in 2002 in Brooklyn, 11235. It has 112 residential units across 8 floors. The owner of record is Unavailable Owner. HPD has recorded 53 housing violations here, most recently on June 13, 2025. 24 of the 50 most recent violations are still open.
- HPD violations
- 53
- DOB violations
- 30
- ECB violations
- 0
- HPD complaints
- 38
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 53
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at 2nd fire door from north, hinges at public hall, 1st story
Nov 1, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at 1st fire door from north, hinges at public hall, 1st story
Nov 1, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Jun 5, 2024
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing sign at public hall, 1st story
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Jun 5, 2024
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 5, 2024
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing sign at public hall, 1st story
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective radiator in the 4th room from east at south located at apt ph1a, 7th story, 1st apartment from north at east
Dec 4, 2021 · Apt PH1A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling in the bathroom located at apt 2d, 2nd story, 3rd apartment from south at west
Jul 6, 2021 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective (inoperable) ceiling light fixture in the private hallway located at apt 2d, 2nd story, 3rd apartment from south at west
Jul 6, 2021 · Apt 2D
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling and east wall in closet in the 1st room from north located at apt 2d, 2nd story, 3rd apartment from south at west
Jul 6, 2021 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling in the 2nd room from north at west located at apt 2d, 2nd story, 3rd apartment from south at west
Jul 6, 2021 · Apt 2D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling in the 1st bathroom from north located at apt 2d, 2nd story, 3rd apartment from south at west
Jul 6, 2021 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling in the 3rd room from north at west located at apt 2d, 2nd story, 3rd apartment from south at west
Jul 6, 2021 · Apt 2D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2d, 2nd story, 3rd apartment from south at west
Jul 6, 2021 · Apt 2D
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2d, 2nd story, 3rd apartment from south at west
Jul 6, 2021 · Apt 2D
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling in the kitchen located at apt 2d, 2nd story, 3rd apartment from south at west
Jul 6, 2021 · Apt 2D
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 29, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 29, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 29, 2018
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jun 29, 2018
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor no access to giant locked cabinet at public hall, 1st story
Jun 29, 2018
Open — Not complied with - ANon-hazardous
Replace with new the missing child safety covers/caps for electrical outlets at south wall, east wall, west wall (six total). at public hall, 1st story
Jun 29, 2018
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at wall at public hall, 1st story
Feb 26, 2018
Open — Not complied with - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at east wall apprx. 4 sq.ft. in the 1st room from north located at apt 1e, 1st story, 2nd apartment from north at east
Apr 12, 2017 · Apt 1E
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Jan 26, 2017
Open — Not complied with - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Jan 26, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Jan 26, 2017
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 26, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 26, 2017
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 26, 2017
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt ph1a, 8th story, 1st apartment from north at east
Aug 5, 2016 · Apt PH1A
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 5, 2016
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 5, 2016
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 5, 2016
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 5, 2016
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 5, 2016
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Aug 5, 2016
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at walls and ceiling in the 3rd room from north at east located at apt 4h, 4th story, 5th apartment from north at east
Aug 18, 2014 · Apt 4H
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at walls and ceiling in the 3rd room from north at west located at apt 4h, 4th story, 5th apartment from north at east
Aug 18, 2014 · Apt 4H
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, south wall and east wall in the 3rd room from north at west located at apt 4h, 4th story, 5th apartment from north at east
Aug 18, 2014 · Apt 4H
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, south wall and east wall in the 3rd room from north at east located at apt 4h, 4th story, 5th apartment from north at east
Aug 18, 2014 · Apt 4H
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water (142 degrees) in the kitchen located at apt 5a, 5th story, 2nd apartment from west at north
Mar 1, 2013 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective bulging west wall in danger of falling about 40 sq.ft. at public hall, 1st story
Oct 31, 2008
Closed — Violation closed
DOB building violations · 30
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2024
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 26, 2019
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active
Show 20 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2016
Dob violation - resolved - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 16, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 6, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 19, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 19, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 19, 2008
Dob violation - resolved
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Slow leak
Feb 12, 2024 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 1, 2021 · Apt PH1A
Close - Door/window
Window frame
Oct 29, 2021 · Apt 2E
Close - Electric
Outlet/switch
Oct 29, 2021 · Apt 2E
Close - Heat/hot water
Apartment only
Oct 18, 2021 · Apt PH1A
Close - Door/window
Door
Jul 1, 2021 · Apt 2E
Close - Door/window
Door
Jul 1, 2021 · Apt 2E
Close - Plumbing
Toilet
Jun 29, 2021 · Apt 2E
Close - Electric
No lighting
Jun 28, 2021 · Apt 2D
Close - Unsanitary condition
Mold
Jun 28, 2021 · Apt 2D
Close
Show 28 more ↓
- Paint/plaster
Ceiling
Jun 28, 2021 · Apt 2D
Close - Water leak
Slow leak
Jun 28, 2021 · Apt 2D
Close - Appliance
Electric/gas range
Jun 27, 2018 · Apt 1F
Close - Appliance
Refrigerator
Jun 27, 2018 · Apt 1F
Close - Safety
Window guard broken/missing
Jun 27, 2018 · Apt 1F
Close - Safety
Window guard broken/missing
Jun 27, 2018 · Apt 1F
Close - Water leak
Slow leak
Jan 30, 2018 · Apt 5B
Close - Heat/hot water
Entire building
May 29, 2017 · Apt 3H
Close - Unsanitary condition
Mold
Apr 10, 2017 · Apt 1E
Close - Heat/hot water
Entire building
Dec 2, 2016 · Apt PH1A
Close - General
Ventilation system
Nov 25, 2016 · Apt PH1A
Close - Unsanitary condition
Pests
Jul 20, 2016 · Apt PH1A
Close - Unsanitary condition
Pests
Jul 20, 2016 · Apt PH1A
Close - Heat/hot water
Entire building
May 9, 2016 · Apt PH1A
Close - General
Ventilation system
Mar 2, 2016 · Apt PH1A
Close - Outside building
Roofing
Aug 13, 2014 · Apt 4H
Close - Water leak
Heavy flow
Aug 13, 2014 · Apt 4H
Close - Unsanitary condition
Mold
Aug 13, 2014 · Apt 4H
Close - Unsanitary condition
Mold
Aug 13, 2014 · Apt 4H
Close - Paint/plaster
Wall
Aug 13, 2014 · Apt 4H
Close - Water leak
Heavy flow
Aug 13, 2014 · Apt 4H
Close - Heating
Heat related
Feb 27, 2013 · Apt 3C
Close - Heating
Heat related
Jan 23, 2013 · Apt NA
Close - Paint/plaster
Wall
Oct 29, 2008 · Apt 1B
Close - Paint/plaster
Wall
Oct 29, 2008 · Apt 1B
Close - Paint/plaster
Wall
Oct 29, 2008 · Apt 1B
Close - Electric
Bell-buzzer/intercom
Oct 25, 2006 · Apt 5A
Close - Electric
Bell-buzzer/intercom
Sep 11, 2006 · Apt 5A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R4)
- Year built
- 2002
- Floors
- 8
- Residential units
- 112
- Building area
- 157,188 ft²
- Lot area
- 83,188 ft²
- Zoning
- R7-1
- Community board
- 313
- Council district
- 48
- Block / lot
- 8720 / 7512
- Assessed value
- $10,618,208
- Landmark / historic district
- No
HPD registration #378546, last renewed Sep 5, 2025.
Questions about 105 Oceana Drive East
Who owns 105 Oceana Drive East?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 105 Oceana Drive East have violations?
Yes. NYC HPD has recorded 53 housing violations at this property.
Is 105 Oceana Drive East rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 105 Oceana Drive East built?
City records list 2002 as the year it was built.
How many apartments are in 105 Oceana Drive East?
It has 112 residential units and 148 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.