1079 Brighton Beach Ave
Brooklyn, NY 11235BBL 3-08715-0029Map
Owner of record: 1079-1081 Brighton Reatly, INC
1079 Brighton Beach Ave is a store building built in 1926 in Brooklyn, 11235. It has 2 residential units across 3 floors. The owner of record is 1079-1081 Brighton Reatly, INC. HPD has recorded 59 housing violations here, most recently on April 18, 2026. 33 of the 50 most recent violations are still open.
- HPD violations
- 59
- DOB violations
- 3
- ECB violations
- 14
- HPD complaints
- 41
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 59
- CImmediately hazardous
Remove the illegal fastening hasp and eye with key operated lock at hatch to scuttle ladder at public hall, 3rd story
Apr 18, 2026
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective eroded mortar joints at 2nd and 3rd story building front
Apr 18, 2026
Closed — Violation dismissed - BHazardous
Provide heavy duty lockset at building entrance door at public hall, 1st story
Apr 18, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at vestibule south wall and east wall at public hall, 1st story
Apr 18, 2026
Open — Nov sent out - BHazardous
Replace with new the missing glass at skylight at public hall, 3rd story
Apr 18, 2026
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the construction debri at public hall, 2nd story
Apr 18, 2026
Closed — Violation dismissed - BHazardous
Properly secure the loose light fixture at ceiling at public hall, 2nd story
Apr 18, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective less than 30 sq feet unkeyed fire retardant material at ceiling at 3rd story public hall at public hall, 2nd story
Apr 18, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at south wall at public hall, 2nd story
Apr 18, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening electromagnetic locking mechanism at building entrance door at public hall, 1st story
Apr 18, 2026
Open — Nov sent out
Show 40 more ↓
- IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for #3f (3rd story, 1st apartment from north at east). vacate #214601
Oct 31, 2022
Open — Info nov sent out - BHazardous
Remove all encumbrances consisting of household items and gabage at public hall, 3rd story
Oct 31, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east, the 3rd room from north at west located at apt 3f, 3rd story, 1st apartment from north at east
Oct 22, 2022 · Apt 3F
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of large boxes near scuttle ladder at public hall, 3rd story
Oct 21, 2022
Open — Invalid certification - BHazardous
Remove all encumbrances consisting of large garbage and household items located at public hall, 3rd story
Oct 21, 2022
Open — Invalid certification - CImmediately hazardous
Replace with new the missing shut-off valve at gas line at stove in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east
Oct 19, 2022 · Apt 3F
Open — Nov certified late - CImmediately hazardous
Replace with new the missing wood balusters (1) at handrail at public hall, 2nd story
Oct 19, 2022
Closed — Violation closed - BHazardous
§ 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy
Oct 19, 2022
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of illegal plumbing fixtures installed : shower stall, wash basin, water closet & sink located at apt 3, 3rd story, 1st apartment from north at east
Oct 19, 2022 · Apt 3
Open — Invalid certification - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range located at apt 3, 3rd story, 1st apartment from north at east
Oct 19, 2022 · Apt 3
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Jul 26, 2022 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). - missing located at apt 3f, 3rd story, 1st apartment from north at east
Jul 26, 2022 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 3rd room from north at east located at apt 3f, 3rd story, 1st apartment from north at east
Jul 26, 2022 · Apt 3F
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Jul 7, 2022 · Apt 3F
Open — Invalid certification - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Jul 7, 2022 · Apt 3F
Open — Invalid certification - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 5th room from north at east located at apt 3rdflo, 3rd story, 1st apartment from west at north
Jul 27, 2019 · Apt 3RDFLO
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3rdflo, 3rd story, 1st apartment from west at north
Jul 27, 2019 · Apt 3RDFLO
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 3rdflo, 3rd story, 1st apartment from west at north
Jul 27, 2019 · Apt 3RDFLO
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at public hall, 3rd story
Jul 27, 2019
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed bx cable wiring at ceiling and all walls throughout at public hall
Jul 27, 2019
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of 2 eye hooks apt entrance door, 3rd story apt #2.
Apr 22, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective connection water supply to water closet, 3rd story apt #2, bathroom.
Apr 22, 2004
Open — Nov sent out - ANon-hazardous
Refit window sashes southeast and northeast room 3 story apt. 2r.
Apr 22, 2004
Open — Nov sent out - ANon-hazardous
And department rules and regulations: scrape and remove rust scales and paint with two coats of paint the rear fire escape.
Apr 22, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling 1st. and 2nd. story public hall.
Apr 22, 2004
Open — Nov sent out - ANon-hazardous
Replace with new the missing light bulb ceiling fixture 1st. story public hall.
Apr 22, 2004
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household articles at 3rd story public hall.
Apr 22, 2004
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the wall and ceiling bathroom 2nd. story apt. 2.
Apr 22, 2004
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items 2nd. story public hall.
Apr 22, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass pane skylite at roof.
Apr 22, 2004
Open — Nov sent out - BHazardous
Provide adequate lighting for 2nd. story public hall light fixture.
Apr 22, 2004
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection bathroom water closet 2nd. story apt. 2.
Apr 22, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective shower head bathtub bathroom, 3rd story apt #2, bathroom.
Apr 22, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture kitchen, 3rd story apt #2.
Apr 22, 2004
Open — Nov sent out - BHazardous
Replace with new the missing ceiling fixture 2nd room from front, 3rd story apt #2.
Apr 22, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of evidence of water leak ceiling south east front room, 3rd story apt #2.
Apr 22, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling southeast front room, 3rd story apt #2.
Apr 22, 2004
Open — Nov sent out - BHazardous
Properly secure the loose television or radio antenna southwest front parapet wall.
Apr 22, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass lower sash southwest front room, southwest window, 3rd story apt #2.
Apr 22, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective walls & ceiling fire retarding material public hall, all stories.
Apr 22, 2004
Open — Nov sent out
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - active - Construction other optional
Work without a permit: creating a hazardous condition noted: (1) total interior.demolition, rear interior brick wall brick extension, interio partitions, new store front, new steel security rool down gate remedy: stop all work, obtain a permit & approvals from this dept
Jan 28, 1998
Vw-violation work without permit - active - Construction other optional
Hazardous
Jan 23, 1998
Vw-violation work without permit - active
ECB violations · 14
- Class - 1
Unlawful acts. failure to comply with commissioner's order.for work without a permit for vio#39070420n. no permit on file as of 5/28/2026., comply with commissioner's order
May 28, 2026 · Penalty $2,500
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#35482139r as of 5/28/2026., file a certificate
May 28, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code-compliant manner. at time of inspection observed at exp#1 window lentils is a state of disrepair ,rusted and bending downward at second and third floor. step cracks near win
May 28, 2026 · Penalty $2,500
Active - Class - 1
Occupancy contrary to that allowed by c of o and/or dept of buildings records.private dwelling illegally converted to multiple dwelling.partition erected creating illegal class 'a' apt at 3rd story apt 3.unlawf
Oct 19, 2022 · Penalty $2,500
Active - Class - 1
Work w/o a permit. noted at 3rd flr level: erected full height partition walls w/doors creating 2 rooms & 1 3pc bthrm. installed water & waste lines for (toilet,sink,shower) & residential sink. installed gas li
Sep 20, 2022 · Penalty $2,500
Active - Class - 2
Occupancy contrary to that of the c of o or official records. official records state: 2family dwelling w/store front. illegal occupancy noted at 3rd flr: subdivided 1 class a apt into 2 class a apts. front apt
Sep 20, 2022 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioners order contained in summons/violation#35361426z issued on 09/11/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible certifica
Jul 10, 2019 · Penalty $1,250
Active - Class - 2
Work without permit.remove:illegal structure in rear and gas line as described in nov #35315562x without required permit.rem:obtain permit for renewal of illegal work
Sep 11, 2018 · Penalty $1,250
Active - Class - 1
Work w/out a permit. noted: 1st floor rear added & exterior to bldg structure made of wood & install a gas fire for cooking. stop all work @ a permit. rem: obtain a permit make site safe all this office rear to
Jul 26, 2018 · Penalty $1,600
Active - Class - 2
Work w/o permit. noted: rectangular metal awning approx 16ft wide x 3ft overhang x 4ft high w/illuminated sign inscribed "arkadia" w/russiancharacters below it. 16ft wide adjustable fabric awining installed
Jan 13, 2016
Resolve
Show 4 more ↓
- Class - 2
Outdoor sign on display structure w/out a permit.observed red & yellowilluminated w/neon tubing full width of property for food store,named (arcadia) & also in russian lettering.dob records state "no illuminate
Dec 31, 2015 · Penalty $1,200
Active - Hazardous
Failure to maintain: exterior masonry (brick wall is broken loose and in danger of collapse into adjacent property aka 1081 brighton beach ave. masonry brick door arch with steel roll down gate attached in rear
Jun 15, 1998
Resolve - Hazardous
Work without a permit. creating a hazardous condition. noted: total interior demolition. rear exterior brick wall-rear brick extension. interior partitions. new store front. new steel security roll down gat
Jan 28, 1998 · Penalty $800
Active - Hazardous
Work without a permit. hazardous work noted: gut renovation of 1st flstore front. removal of store front. removal of fire separation (ceiling) between commercial & residential spaces-occupied at 2nd,3rd.
Jan 23, 1998 · Penalty $800
Active
Complaints
- Appliance
Electric/gas range
Dec 30, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 30, 2025 · Apt 2B
Close - General
Cooking gas
Dec 30, 2025 · Apt 2B
Close - Plumbing
Water supply
Dec 22, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 2B
Close - Plumbing
Basin/sink
Oct 28, 2022 · Apt 3F
Close - Appliance
Electric/gas range
Oct 28, 2022 · Apt 3F
Close - General
Ventilation system
Oct 28, 2022 · Apt 3F
Close - General
Ventilation system
Oct 28, 2022 · Apt 3F
Close
Show 31 more ↓
- Unsanitary condition
Pests
Oct 28, 2022 · Apt 3F
Close - Paint/plaster
Wall
Oct 28, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Oct 17, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Oct 17, 2022 · Apt 3F
Close - Plumbing
Basin/sink
Oct 6, 2022 · Apt 3F
Close - Plumbing
Basin/sink
Oct 6, 2022 · Apt 3F
Close - General
Ventilation system
Oct 6, 2022 · Apt 3F
Close - Appliance
Electric/gas range
Oct 6, 2022 · Apt 3F
Close - General
Ventilation system
Oct 6, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Oct 6, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Oct 6, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Jul 21, 2022 · Apt 3F
Close - General
Ventilation system
Jul 21, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Jul 21, 2022 · Apt 3F
Close - Safety
Smoke detector
Jul 21, 2022 · Apt 3F
Close - Safety
Window guard broken/missing
Jul 21, 2022 · Apt 3F
Close - Safety
Carbon monoxide detector
Jul 8, 2022 · Apt 3F
Close - Safety
Window guard broken/missing
Jul 8, 2022 · Apt 3F
Close - Unsanitary condition
Mold
Jul 8, 2022 · Apt 3F
Close - Safety
Smoke detector
Jul 8, 2022 · Apt 3F
Close - Door/window
Door
Jul 8, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Jul 8, 2022 · Apt 3F
Close - General
Signage missing
Jul 6, 2022 · Apt 3F3FL
Close - Door/window
Window frame
Jul 6, 2022 · Apt 3F3FL
Close - Unsanitary condition
Garbage/recycling storage
Jun 6, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Jun 6, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Jun 6, 2022 · Apt 3F
Close - Unsanitary condition
Pests
May 20, 2022 · Apt 3F
Close - Unsanitary condition
Pests
May 20, 2022 · Apt 3F
Close - Water leak
Heavy flow
Jul 23, 2019 · Apt 3RDFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1926
- Floors
- 3
- Residential units
- 2
- Building area
- 3,600 ft²
- Lot area
- 2,329 ft²
- Zoning
- R6
- Community board
- 313
- Council district
- 48
- Block / lot
- 8715 / 29
- Assessed value
- $277,200
- Landmark / historic district
- No
Questions about 1079 Brighton Beach Ave
Who owns 1079 Brighton Beach Ave?
The owner of record in NYC Department of City Planning PLUTO data is 1079-1081 Brighton Reatly, INC.
Does 1079 Brighton Beach Ave have violations?
Yes. NYC HPD has recorded 59 housing violations at this property.
Is 1079 Brighton Beach Ave rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1079 Brighton Beach Ave built?
City records list 1926 as the year it was built.
How many apartments are in 1079 Brighton Beach Ave?
It has 2 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.