roofy

3100 Brighton 3 Street

Brooklyn, NY 11235BBL 3-08685-0010Map

Owner of record: 3100 Owners Corp

3100 Brighton 3 Street is an elevator apartment building built in 1920 in Brooklyn, 11235. It has 65 residential units across 6 floors. The owner of record is 3100 Owners Corp. HPD has recorded 278 housing violations here, most recently on July 30, 2026. 2 of the 50 most recent violations are still open.

HPD violations
278
DOB violations
16
ECB violations
6
HPD complaints
357

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 278

  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 6j, 6th story, 3rd apartment from south at west , section ''north'', 3rd from south at west

    Jul 30, 2026 · Apt 6J

    Open — Nov sent out
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at fire door at public hall, 6th story

    Jul 29, 2026

    Open — Nov certified on time
  • B

    M/d law abate the nuisance consisting of plexiglass at building entrance door , 1st story

    Jun 15, 2026

    Closed — Violation closed
  • B

    Replace with new the missing glass at building entrance door , 1st story

    Jun 15, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch at compactor closet door at compactor closet, 4th story

    Jul 10, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at compactor closet door at compactor closet, 4th story

    Jul 10, 2024

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from east at south located at apt 4e, 4th story, 4th apartment from north at east

    Jun 4, 2024 · Apt 4E

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak over ceiling and east wall in the 1st room from east at south located at apt 4e, 4th story, 4th apartment from north at east

    Jun 4, 2024 · Apt 4E

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling, north and east walls in the 1st room from east at north located at apt 4e, 4th story, 4th apartment from north at east

    Jun 4, 2024 · Apt 4E

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape in the 1st room from east at south located at apt 4e, 4th story, 4th apartment from north at east

    Jun 4, 2024 · Apt 4E

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and east walls in the 1st room from east at north located at apt 4e, 4th story, 4th apartment from north at east

    Jun 4, 2024 · Apt 4E

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at 1st window frame from north at east wall in the kitchen located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, west wall in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at 1st window frame from north at east wall in the 4th room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak the east wall in the 4th room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling in the 1st private hallway from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, east wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from north at east wall in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st private hallway from north, the 4th room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 6th story

    Mar 26, 2024

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, ceiling in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at 2nd window frame from north at east wall in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at 1st window frame from north at east wall in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 6G

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx. 1 sq ft at the east wall in the 4th room from north located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective spring balance lower sash window in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the approx. 1 sq ft of mold at the ceramic tiles around the bathtub in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective base cabinets at the north wall and south wall in the kitchen located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over the ceiling in the 4th room from north located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 4th room from north located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from north located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the kitchen , the 4th room from north, the foyer located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx. 1 sq ft at the 1st window frame from north at east wall in the 4th room from north located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over the ceiling in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north located at apt 6g, 6th story, 2nd apartment from north at east , section at north

    Mar 21, 2024 · Apt 6G

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on door at entrance of boiler room at cellar

    Nov 29, 2023

    Closed — Violation dismissed

DOB building violations · 16

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 7, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 20, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 13, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 11, 2014

    Dob violation - resolved
  • Construction other optional

    Stop all work make site safe contact dob

    Feb 2, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 18, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 22, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 28, 2007

    Dob violation - resolved
Show 6 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 30, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 31, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 30, 2003

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 9, 1989

    Dob violation - resolved

ECB violations · 6

  • Class - 1

    05m07c4-39m07-60x10. cease use.05-m07 cease use item,door zone restrictor missing this is a safety device to ensure elevator passengers safety.remedy: provide restrictor 39-m-07 provide top of car stop switch,6

    Dec 17, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide unobstructed passageway at the time of inspection observed at 6 story elevator bldg exp# 2 (fire corridor) illegal locking hardware installed (double celinder lock) & also fire corridor passa

    Jan 13, 2014 · Penalty $1,200

    Resolve
  • Class - 3

    15m07/70o02. 15m07 replace missing certificate frame.70o02 clean pit.

    Dec 2, 2008 · Penalty $500

    Resolve
  • Non-hazardous

    14m07,15m07,84b10,39p07,24i10,08i10.84-car vent fan

    May 2, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    11q07,74q07,50y14,57o02,58o02. 74q- fan not covered.

    Apr 22, 2000

    Resolve
  • Non-hazardous

    46k.

    Sep 26, 1995 · Penalty $100

    Resolve

Complaints

  • Plumbing

    Bathtub/shower

    Aug 20, 2026 · Apt 6J

    Close
  • Plumbing

    Toilet

    Aug 20, 2026 · Apt 6J

    Close
  • Electric

    Power outage

    Jul 28, 2026 · Apt 6J

    Close
  • Electric

    Power outage

    Jul 28, 2026 · Apt 6J

    Close
  • Water leak

    Heavy flow

    Jun 23, 2026 · Apt 1G

    Close
  • Unsanitary condition

    Pests

    Jun 9, 2026 · Apt 6E

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    May 31, 2024 · Apt 4E

    Close
  • Paint/plaster

    Ceiling

    Apr 26, 2024 · Apt 4E

    Close
Show 40 more ↓
  • Water leak

    Heavy flow

    Mar 23, 2024 · Apt 6G

    Close
  • Plumbing

    Radiator

    Mar 19, 2024 · Apt 6G

    Close
  • Electric

    Wiring

    Mar 19, 2024 · Apt 6G

    Close
  • Unsanitary condition

    Mold

    Mar 19, 2024 · Apt 6G

    Close
  • Paint/plaster

    Wall

    Mar 19, 2024 · Apt 6G

    Close
  • Unsanitary condition

    Pests

    Mar 19, 2024 · Apt 6G

    Close
  • General

    Cabinet

    Mar 19, 2024 · Apt 6G

    Close
  • Unsanitary condition

    Pests

    Mar 19, 2024 · Apt 6G

    Close
  • Water leak

    Heavy flow

    Mar 19, 2024 · Apt 6G

    Close
  • Paint/plaster

    Ceiling

    Dec 19, 2023 · Apt 4E

    Close
  • Water leak

    Damp spot

    Dec 19, 2023 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 25, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2023 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Oct 15, 2023 · Apt 5E

    Close
  • Paint/plaster

    Ceiling

    Oct 9, 2023 · Apt 4D

    Close
  • Unsanitary condition

    Mold

    Oct 9, 2023 · Apt 4D

    Close
  • Water leak

    Slow leak

    Oct 9, 2023 · Apt 4D

    Close
  • Paint/plaster

    Ceiling

    Oct 9, 2023 · Apt 4D

    Close
  • Water leak

    Damp spot

    Oct 9, 2023 · Apt 4D

    Close
  • Water leak

    Slow leak

    Oct 3, 2023 · Apt 4E

    Close
  • Electric

    Lighting

    Sep 29, 2023 · Apt 6E

    Close
  • Outside building

    Roofing

    Sep 29, 2023 · Apt 6E

    Close
  • Unsanitary condition

    Mold

    Sep 27, 2023 · Apt 6E

    Close
  • Water leak

    Heavy flow

    Sep 27, 2023 · Apt 6E

    Close
  • Water leak

    Heavy flow

    Sep 25, 2023 · Apt 4E

    Close
  • Water leak

    Slow leak

    Sep 25, 2023 · Apt 6E

    Close
  • Unsanitary condition

    Mold

    Sep 24, 2023 · Apt 6G

    Close
  • Paint/plaster

    Ceiling

    Sep 24, 2023 · Apt 6G

    Close
  • Outside building

    Roofing

    Sep 24, 2023 · Apt 6G

    Close
  • Electric

    Outlet/switch

    Jun 20, 2023 · Apt 6E

    Close
  • Unsanitary condition

    Mold

    Jun 20, 2023 · Apt 6E

    Close
  • Paint/plaster

    Ceiling

    Jun 20, 2023 · Apt 6E

    Close
  • Paint/plaster

    Wall

    Jun 20, 2023 · Apt 6E

    Close
  • Water leak

    Slow leak

    Jun 20, 2023 · Apt 6E

    Close
  • Unsanitary condition

    Mold

    May 24, 2023 · Apt 6G

    Close
  • Water leak

    Heavy flow

    May 24, 2023 · Apt 6G

    Close

Sales history

DatePriceTypeUnits
Jul 21, 2026$305,000Coops - elevator apartments—
Jun 3, 2026$230,000Coops - elevator apartments—
Apr 28, 2026$300,000Coops - elevator apartments—
Mar 9, 2026$300,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1920
Floors
6
Residential units
65
Building area
59,640 ft²
Lot area
14,000 ft²
Zoning
R7-1
Community board
313
Council district
48
Block / lot
8685 / 10
Assessed value
$3,230,100
Landmark / historic district
No

HPD registration #339782, last renewed Sep 16, 2025.

Questions about 3100 Brighton 3 Street

Who owns 3100 Brighton 3 Street?

The owner of record in NYC Department of City Planning PLUTO data is 3100 Owners Corp.

Does 3100 Brighton 3 Street have violations?

Yes. NYC HPD has recorded 278 housing violations at this property.

Is 3100 Brighton 3 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 3100 Brighton 3 Street built?

City records list 1920 as the year it was built.

How many apartments are in 3100 Brighton 3 Street?

It has 65 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.