3052 Brighton 5 Street
Brooklyn, NY 11235BBL 3-08674-0023Map
Owner of record: Dmr Holding LLC C/O N
3052 Brighton 5 Street is an elevator apartment building built in 2008 in Brooklyn, 11235. It has 15 residential units across 7 floors. The owner of record is Dmr Holding LLC C/O N. HPD has recorded 38 housing violations here, most recently on May 8, 2026. 32 of the 38 most recent violations are still open.
- HPD violations
- 38
- DOB violations
- 13
- ECB violations
- 43
- HPD complaints
- 30
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 38
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeds the maximum allowable operating temperature of 130f at all hot water fixtures in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Apr 29, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Refit door in the entrance located at apt 2c, 2nd story, 1st apartment from east at south
Apr 29, 2025 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective wire glass pane at door entrance building , 1st story
Apr 29, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at bathtub in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective individual heating system at east wall in the 1st room from east located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out
Show 28 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at hinges , at entrance door in the entrance located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty lockset at apartment entrance door in the entrance located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at hinges , at bulkhead door at public hall stairs, 7th story
Mar 12, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ventilation unit in the kitchen located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective gfci receptacle at south wall in the kitchen located at apt 2c, 2nd story, 1st apartment from east at south
Mar 12, 2025 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at boiler room, at roof
Mar 12, 2025
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing temporarily installed wedge at door leading to 1st story public hall stairs preventing it from being self closing at public hall, 1st story
Mar 7, 2025
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south
Nov 22, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south
Nov 22, 2024 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3c, 3rd story, 1st apartment from east at south
Nov 22, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 9, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .... in the entrance located at apt 3c, 3rd story, 1st apartment from east at south
Jan 9, 2024 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south
Jan 9, 2024 · Apt 3C
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 9, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jan 9, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 9, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Jun 8, 2022 · Apt 4C
Open — Notice of issuance sent to tenant - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 8, 2022
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 5c, 5th story, 1st apartment from south at west
Dec 7, 2014 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 5c, 5th story, 1st apartment from south at west
Dec 7, 2014 · Apt 5C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5c, 5th story, 1st apartment from south at west
Dec 7, 2014 · Apt 5C
Open — Invalid certification - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5c, 5th story, 1st apartment from south at west
Dec 7, 2014 · Apt 5C
Open — Invalid certification - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7; wg to replace = 0; wg to repair = 0; located at apt 6a, 6th story, 1st apartment from south at west
Jul 5, 2014 · Apt 6A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 6a, 6th story, 1st apartment from south at west
Jul 5, 2014 · Apt 6A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector inoperative located at apt 6a, 6th story, 1st apartment from south at west
Jul 5, 2014 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the closet ceiling at east offset # 1 in the 2nd room from north located at apt 6a, 6th story, 1st apartment from south at west
Jul 5, 2014 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 6a, 6th story, 1st apartment from south at west
Jul 5, 2014 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenette located at apt 6a, 6th story, 1st apartment from south at west
Jul 5, 2014 · Apt 6A
Open — Nov sent out
DOB building violations · 13
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Immediate emergency anythingoptional
Install approx. 46 linear dt of sidewalk shed at exp#1 to cover the front yard & sidewalk with a 5 feet overhang at the corner of exp#1 & #4 to safeguard public & property
May 23, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 20, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 19, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2013
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 22, 2012
Dob violation - dismissed
Show 3 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 22, 2012
Dob violation - dismissed - Construction other optional
Work without permit; remedy: renew permits
Jul 12, 2010
Vw*-violation - work w/o permit dismissed - Construction other optional
Failure to safeguard all persons and property affected by construction operation./remedy; stop all work make site safe, provide protection renew all permit contact dob to rescind swo
Jul 12, 2010
Dob violation - dismissed
ECB violations · 43
- Class - 1
Altered/changed building occupied without a valid certificate of occupancy: at the time of inspection, observed nb erected under job #302300212 for 7-story, 15-family residential building, 2nd - 5th fl. contain
Sep 16, 2026 · Penalty $6,250
Active - Class - 1
Building or open lot occupied without a valid certificate of occupancy; observed 7 story multiple dwelling building being occupied without a valid c of o. no certificate of occupancy has been issued to new buil
Jul 22, 2025 · Penalty $2,500
Active - Class - 2
Failure to comply with commissioner's order contained in summons #39036200m issued on 2/12/2021, and failure to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certif
Mar 19, 2024 · Penalty $1,250
Resolve - Class - 1
Building or open lot occupied without a valid cert. of occupancy. observed 7 story multiple dwelling occupied without a valid c of o - no co issued under nb job#302300212 & all permits expired. repeat violation
Jun 8, 2022 · Penalty $2,500
Active - Class - 2
Failure to comply with the dept of buildings requirement for permit sign-off. respondent obtained permit # 302300212 which expired 05/09/2017 permit has not been signed off within 1 year following its expiratio
Jun 8, 2022 · Penalty $1,250
Active - Class - 2
Unapproved,unsafe,unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use.on 6/7/2022 at 9:30am,i observed in apt4c on balcony missing fixture,live exposed wiring.in kitchen,rece
Jun 7, 2022 · Penalty $400
Resolve - Class - 1
At front of building, balcony at 5th floor has finished side panel detaching,also noted underside finish also detaching and water stained., maintain exterior building wall
Jun 2, 2022 · Penalty $2,500
Resolve - Class - 2
Work without permit. door lock monitoring ( chip 2k s/c version v2.25 on controller was replaced with an updated chip 2k s/c v2.37 that contains door lock monitoring software )and part was installed without per
Feb 12, 2021 · Penalty $1,250
Resolve - Class - 1
Noted; observed balconies at 5th and 6th floors in disrepair with with holes, cracks and sections of stucco missing. there is the potential for stucco to collapse., maintain exterior building wall
May 22, 2019
Resolve - Class - 2
Sec: 28-118.1. occupancy w/out a valid c of o. noted: the job# 3023002k-nb is not signed off. observed: partial occupancy @ 3rd, 4th, & 5th flrs. rem: discontinue illegal use or obtain a valid c of o.
Dec 16, 2016 · Penalty $2,000
Resolve
Show 33 more ↓
- Class - 1
Sec. 3314.5.5 failure to have planks tied down. note at time of inspection i observed wood supported scaffold in place at exp#2 w/o having planks of scaffold tied down to prevent dislodgement. remedy: comply w/
Sep 28, 2016 · Penalty $1,600
Resolve - Class - 1
Sec. 3314.12 pswo failure to have built according to code specifications. work allowed on supported scaffold to make safe only. note at time of inspection i observed supported scaffold in place at exp#2. not
Sep 28, 2016 · Penalty $4,000
Resolve - Class - 1
Sec. 3314.4.4.8 failure to use non combustible materials. note: at time of inspection i observed wooden supported scaffold in place at exp#2w/one working level made of 2'x4' & plywood & others not fully decked
Sep 28, 2016 · Penalty $4,000
Resolve - Class - 1
Failure to maintain facade and appurtenances.noted: at south exposure the entire south exp stucco surface has dislodged and fallen off facade from 2st up to 4th flr.alsopcs of east #1 exp balcony slab trim has
Jan 15, 2016 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at 6th fl in stairwell sofa partially obstructs stairs,also noted at 7th fl mattress & box spring stanf on landing & stairs. on landing boxes & furnishi
Nov 10, 2014
Resolve - Class - 1
3314.1failed to notify dobprior to installation of suspended scaffolding(outrigger beams)noted:outrigger beams have been installed on roof @exp #2 w/scaffolding hanging & men working @ time of insp.rem:notify d
Dec 1, 2011 · Penalty $800
Resolve - Class - 1
Supervision or use of rigging without a special rigger's license on site. noted:two worker on sustended scaffold at exposure#2 installing new facade w/o a special rigger on site.remedy:obtain special rigger's l
Dec 1, 2011 · Penalty $4,800
Resolve - Class - 2
Sidewalk shed does not meet code specifications. noted: shed erected under job 310139187 does not extend 5 lf onto adjoining property sidewalk and bldg is above 40' in height. remedy: conform to code specs.
Oct 30, 2010 · Penalty $2,400
Resolve - Class - 2
Work w/o a permit expired permit #310139187 for sidewalk shed expired 05/07/10 rem: renew permit
Oct 30, 2010 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a certificate of correction for ecb notice of violation #34841250k,issued 4/22/10. for failure to safeguard all persons & property affected by const operatio
Sep 11, 2010 · Penalty $800
Resolve - Class - 2
Work w.o a permit. noted: permit for sidewalk shed 310139187 has been expired on 5/7/2010. dob records shows no shed permit has been renewedremedy: renew shed permit
May 28, 2010 · Penalty $4,000
Resolve - Class - 2
Work w/o a permit. expired permit for job #302300212-01-nb permit had expired on 5.7.10. remedy: renew permit. stop all work until permit was renewed.
May 14, 2010 · Penalty $4,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: cont/owner for new const failed to provide out rigger protection to adjoining properties at exposures 2 & 4. at exposure 4
Apr 22, 2010 · Penalty $12,000
Resolve - Class - 2
Failure to maintain defect is in that construction site is doing exterior stucco pieces of mortar & stucco is falling onto adjacent roof at 3048 brighton 5th street. remedy: maintain building make all necessary
Apr 7, 2010 · Penalty $2,500
Resolve - Class - 2
Failed to notify dept obtain permit prior to use installation off outrigger beams in connection w/ suspended scaffold noted no outrigger beams notification for suspended scaffold at exp #4 rem: notify the dept
Dec 16, 2009 · Penalty $800
Resolve - Class - 2
Work w/o a permit expired permit noted expired permit #310139187 exp 3/27/09 for sidewalk shed rem: renew permit
Dec 16, 2009 · Penalty $800
Resolve - Class - 1
Failure to comply w/ an order of the comms noted failure comply w/ swo #2880 supported scaffold was removed off job site history of non compliance rem: comply w/ comms order
Dec 16, 2009 · Penalty $25,000
Resolve - Class - 1
Stop all work. was at construction site to perform gas test inspection& observed that construction site had no temp siames connection for proper for protection. building has no water service piping from street
Nov 19, 2009 · Penalty $1,000
Resolve - Class - 1
Failed to comply w/an order of the commissioner's. noted: failure to comply w/swo #2880 for unsafe condition for supported scaffold over 40'in height, exterior of bldg was completed. remedy: comply w/comm's
Sep 9, 2009 · Penalty $12,000
Resolve - Class - 2
Failed to obtain a temporary construction permit prior to installation/use of sidewalk shed. noted: violation was written on 7.16.09 for no permit for sidewalk shed, gc has not complied w/cure date of 8.25.09.
Sep 9, 2009 · Penalty $500
Resolve - Class - 1
Sec. 3314.6 the footings & anchorage for every scaffold shall be sound& rigid,capable of carrying the maximum load w/o excessive settlement or deformation & secured against movement in any direction. noted: scr
Jul 16, 2009 · Penalty $1,600
Resolve - Class - 1
No record of daily inspection of supported scaffold performed by authorized person on site. noted: no daily log for supported scaffold,sidewalk shed for 7/16/09. remedy: maintain daily inspection records on sit
Jul 16, 2009 · Penalty $2,400
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: no approved plans on site for sidewalk shed & supported scaffold. remedy: provide plans.
Jul 16, 2009 · Penalty $500
Resolve - Class - 2
Work w/o a permit: expired permit noted: no permit for sidewalk shed expired 3/27/09 under filing #310139187 remedy: re-new permit.
Jul 16, 2009 · Penalty $800
Resolve - Class - 1
Sec. 3314.6.1 safe points of anchorage include structural members of abuilding. noted: supported scaffold at a height of 60 + feet,was tied back into window frames with 2x4 wood studs,& #9 wire at exposure #1,#
Jul 16, 2009 · Penalty $1,600
Resolve - Class - 1
Sec. 3314.8 except for scaffolds platforms 6 feet or less above groundthe open side & ends of every scaffold platform shall be provided with a guardrail system & toe board. noted: supported scaffold at a height
Jul 16, 2009 · Penalty $1,600
Resolve - Class - 1
Sec. 3314.5 platforms on all working levels of a scaffold shall be fully planked or decked between the front uprights & the guardrail systemnoted: decks not fully planked at working levels. remedy: comply w/cod
Jul 16, 2009 · Penalty $1,600
Resolve - Class - 2
Fail to maintain sidewalk shed the under sign of shed shall be lightedat all times. noted: inoperable lights under side of shed at time of insp (9:50 pm). remedy: conform to shed.
Feb 21, 2009
Resolve - Hazardous
27-1009(c) no contractors sign provided @ site upon insp excavation in progress no (contractors) sign posted or provided @ site runs through to brighton 4th st 5th through to 4th rem: post a contractors sign fr
Jun 19, 2008 · Penalty $250
Resolve - Non-hazardous
Failure to obtain a permit for temp construction. noted: construction fence erected @ perimeter of lot, permit expired 12/07/05 permit #301878172. remedy: obtain a permit.
Jun 30, 2006 · Penalty $2,500
Resolve - Hazardous
Job site fence defective. noted: 16' of 8'-high construction fence hascollapsed into site at south west corner leaving site open to passersby. approx. 24' of 8'-high construction fence has collapsed into site
Feb 28, 2006 · Penalty $5,000
Resolve - Non-hazardous
Failure to maintain: defective plasaer over first story vestibule door(2) an accumulation of rubbish and debris at first story rear apartment. at various location(3)basement rear aparatment entrance steps handr
Sep 2, 1994 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain exterior building wall-defect is: front and rear gutters missing(2) broken and missing windows glass at first story rearapartment rear wall(3) broken missing & defective windows glass at bas
Sep 2, 1994 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Apartment only
Apr 29, 2025 · Apt 2C
Close - Door/window
Door
Apr 29, 2025 · Apt 2C
Close - Door/window
Door
Apr 29, 2025 · Apt BLDG
Close - General
Ventilation system
Mar 12, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Mar 10, 2025 · Apt 2C
Close - Appliance
Electric/gas range
Mar 10, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Mar 6, 2025 · Apt 2C
Close - General
Ventilation system
Mar 6, 2025 · Apt 2C
Close - Water leak
Slow leak
Nov 20, 2024 · Apt 3C
Close - Heat/hot water
Apartment only
Nov 20, 2024 · Apt 3C
Close
Show 20 more ↓
- Heat/hot water
Apartment only
Jan 8, 2024 · Apt 3C
Close - Appliance
Electric/gas range
Dec 19, 2023 · Apt 3C
Close - Appliance
Electric/gas range
Dec 15, 2023 · Apt 3C
Close - Flooring/stairs
Floor
Dec 15, 2023 · Apt 3C
Close - General
Cooking gas
Dec 15, 2023 · Apt 3C
Close - General
Cooking gas
Dec 14, 2023 · Apt 3C
Close - Unsanitary condition
Pests
Jun 4, 2022 · Apt 4C
Close - Unsanitary condition
Pests
Jun 2, 2022 · Apt 4C
Close - Heat/hot water
Entire building
Feb 12, 2021 · Apt 4A
Close - Water leak
Heavy flow
Nov 24, 2014 · Apt 5C
Close - Unsanitary condition
Pests
Jun 21, 2014 · Apt 6A
Close - General
Mold
Oct 24, 2013 · Apt 6A
Close - General
Mold
Oct 24, 2013 · Apt 6A
Close - Plumbing
Water-leaks
Oct 24, 2013 · Apt 6A
Close - Paint/plaster
Ceiling
Oct 24, 2013 · Apt 6A
Close - Electric
Lighting
Oct 24, 2013 · Apt 6A
Close - Heating
Heat related
Apr 12, 2013 · Apt 6A
Close - Electric
Wiring
Mar 25, 2009 · Apt BASEM
Close - Appliance
Sprinker cert
Jul 26, 2004
Close - Appliance
Sprinker cert
Jul 26, 2004
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2008
- Floors
- 7
- Residential units
- 15
- Building area
- 18,000 ft²
- Lot area
- 8,000 ft²
- Zoning
- R6
- Community board
- 313
- Council district
- 48
- Block / lot
- 8674 / 23
- Assessed value
- $881,100
- Landmark / historic district
- No
Questions about 3052 Brighton 5 Street
Who owns 3052 Brighton 5 Street?
The owner of record in NYC Department of City Planning PLUTO data is Dmr Holding LLC C/O N.
Does 3052 Brighton 5 Street have violations?
Yes. NYC HPD has recorded 38 housing violations at this property.
Is 3052 Brighton 5 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3052 Brighton 5 Street built?
City records list 2008 as the year it was built.
How many apartments are in 3052 Brighton 5 Street?
It has 15 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.