3045 Brighton 3 Street
Brooklyn, NY 11235BBL 3-08673-0014Map
Owner of record: Matann INC.
3045 Brighton 3 Street is a walk-up apartment building built in 1930 in Brooklyn, 11235. It has 3 residential units across 2 floors. The owner of record is Matann INC.. HPD has recorded 19 housing violations here, most recently on May 1, 2026.
- HPD violations
- 19
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 5
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of missing electrical outlet cover at south wall in the 4th room from east located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, south wall in the kitchen located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from east at north located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 2nd room from east at north located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation dismissed
Show 9 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, south wall in the 5th room from east located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the 3rd room from east located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall, west wall, 1st window frame from north at east wall in the 2nd room from east at north located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) west wall in the 1st room from east at north located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st wall cabinet from north at east wall, 1st window frame from north at east wall in the kitchen located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from east at south wall in the 4th room from east located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at south wall, baseboard at west wall in the 5th room from east located at apt 2, 1st story, 1st apartment from north at east
Jan 14, 2016 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2015
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 3
Failure to maintain building and all parts thereof in code compliant manner .noted : at time of inspection,observed at front of building the curd was cut approximately 10 feet on the right side, curd cut was ma
Jun 25, 2026 · Penalty $500
Active
Complaints
- Water leak
Slow leak
Jan 5, 2016 · Apt 1
Close - Flooring/stairs
Floor
Jan 5, 2016 · Apt 1
Close - Paint/plaster
Wall
Jan 5, 2016 · Apt 1
Close - Water leak
Slow leak
Jan 5, 2016 · Apt 1
Close - Plumbing
Water supply
May 20, 2004 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1930
- Floors
- 2
- Residential units
- 3
- Building area
- 3,164 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 313
- Council district
- 48
- Block / lot
- 8673 / 14
- Assessed value
- $76,380
- Landmark / historic district
- No
HPD registration #327539, last renewed Oct 10, 2025.
Questions about 3045 Brighton 3 Street
Who owns 3045 Brighton 3 Street?
The owner of record in NYC Department of City Planning PLUTO data is Matann INC..
Does 3045 Brighton 3 Street have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 3045 Brighton 3 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3045 Brighton 3 Street built?
City records list 1930 as the year it was built.
How many apartments are in 3045 Brighton 3 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.