roofy

2943 Brighton 7 Street

Brooklyn, NY 11235BBL 3-08667-0735Map

Owner of record: Alfa Seven Realty LLC

2943 Brighton 7 Street is a walk-up apartment building built in 2013 in Brooklyn, 11235. It has 5 residential units across 4 floors. The owner of record is Alfa Seven Realty LLC. HPD has recorded 4 housing violations here, most recently on September 17, 2026. 2 of the 4 most recent violations are still open.

HPD violations
4
DOB violations
3
ECB violations
15
HPD complaints
33

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 4

  • B

    Properly repair or replace the broken or defective lock and assembly installed at the building entrance door , 1st story

    Sep 17, 2026

    Open — Nov certified on time
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Jul 29, 2026 · Apt 2

    Open — Civ14 mailed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 3, wg to repair = 0 in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    May 8, 2026 · Apt 2

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    May 1, 2026 · Apt 2

    Closed — Violation closed

DOB building violations · 3

  • Construction other optional

    4-story incomplete res. bldg. improper construction, design not code compliant. no contact since 3/7/2023. remedy: provid as-built dwgs, ncr table,proposed repairs,details,insp rpts,.calcs&design dwgs by 1/8 file by 1/26,strt wrk by 2/12

    Dec 8, 2023

    Dob violation - active
  • Construction other optional

    Stop all work on joists. submit special inspection report and complete set of structural plans to ceu, no ;ater than 10/17/16 as per frozan sabeh, badge #5053

    Oct 3, 2016

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Oct 15, 2015

    Dob violation - dismissed

ECB violations · 15

  • Class - 1

    Failure to safeguard all persons & property affected by const ops.noted:pipe scaffold erected @exp#1 over 40' in height-safety netting is loose,planks resting against the bldg on top of side walk shed-high wind

    Feb 18, 2016 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to adequately supervise work @ a construction site,so as to maintain a safe construction site & ensure compliance w/ approved construction docs & chap33 following hazardous condition was observed pswo i

    Feb 18, 2016 · Penalty $8,000

    Active
  • Class - 1

    Work w/out a permit.noted:pipe scaffold erected @exp#1 (7 levels up approx 44" in height).ni permit in the bis on site.pswo issued pursuant to 28-207.2 & posted @premises.rem:stop all use of pipe scaffold.obtai

    Feb 18, 2016 · Penalty $8,000

    Resolve
  • Class - 2

    28-104.7 submittal of construction documents. provide to ceu tr-1 forcold form steel joists.provide all field reports and pictures and all concrete tr-2 compression results. rmdy: stop all work on joists.

    Dec 9, 2015 · Penalty $800

    Resolve
  • Class - 1

    Sec. 3301.7 failure to provide design drawing. at the time of my inspection. i observed workers using a remote controlled electric hoist on site. on request for design drawing none was provided. a partial stop

    Jul 16, 2015 · Penalty $1,630

    Resolve
  • Class - 1

    Failure to provide guardrails. at the time of my inspection bldg steelstructure upto 4 sty. i observed no guardrails was provided through the entire 4 sty bldg. a full stop work order was issued pursuant to

    Jul 16, 2015 · Penalty $2,430

    Resolve
  • Class - 2

    Temp const equip on site -expired permit.a const fence 8'high has beenerected around site.the dob permit for this fence #302040841 expired on 8/1/14.rem:renew fence permit.

    Aug 21, 2014

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection.approx 20'of chain link fence w/mesh has been erected @ front of expo 2 adj to 2939 brighton 7 st instead of code required "sailed"fence.rem:replace 20'sect

    Aug 21, 2014

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by construction operations - upon inspect construction of new bldg commenced metal structure erected above 2nd fl approximately 25 ft high as noted the fro

    Apr 19, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Bc3309.10 no roof protection - upon inspection construction of new bldg commenced metal structure erected above 2nd fl approximately 25 ft high. at time of inspection noted roof protection not provided for the

    Apr 19, 2014 · Penalty $1,600

    Resolve
Show 5 more ↓
  • Class - 1

    Bc3303.4.5 unsafe storage of materials and equipment - upon inspectionnoted materials and equipment like plywood and pipe scaffoldings are stored and placed at the edge of the bldg on 2nd fl in exposure 2. the

    Apr 19, 2014 · Penalty $1,600

    Resolve
  • Class - 2

    No viewing panel - upon inspection noted viewing panels not provided on the solid construction fence erected at this job site remedy:comply with the code

    Apr 19, 2014

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection. at the time of inspection observed - nb #302040841 under construction missing solid fence at exp 3 & portion of exp 2 have chain link fence at exp 3.

    Dec 24, 2013 · Penalty $800

    Resolve
  • Class - 2

    Sec. 3302.1. failure to safeguard all persons and property during construction operations. sidewalk directly in front of site entrance gate is broken and missing creating a tripping hazard for pedestrations.

    Dec 24, 2013 · Penalty $830

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection. noted: fence erected under permit #302040841 is constructed of steel post & chain link wire fencing contrary to code requirement an active job site should

    Jul 18, 2013

    Resolve

Complaints

  • Paint/plaster

    Wall

    Sep 15, 2026 · Apt WHOLEB

    Close
  • Unsanitary condition

    Pests

    Sep 15, 2026 · Apt WHOLEB

    Close
  • Flooring/stairs

    Floor

    Sep 15, 2026 · Apt WHOLEB

    Close
  • Unsanitary condition

    Pests

    Sep 15, 2026 · Apt WHOLEB

    Close
  • Unsanitary condition

    Mold

    Sep 15, 2026 · Apt WHOLEB

    Close
  • Water leak

    Slow leak

    Sep 15, 2026 · Apt WHOLEB

    Close
  • Electric

    Wiring

    Sep 15, 2026 · Apt WHOLEB

    Close
  • Door/window

    Door

    Sep 5, 2026 · Apt 2C

    Close
  • Door/window

    Window frame

    Sep 5, 2026 · Apt 2C

    Close
  • Water leak

    Slow leak

    Sep 5, 2026 · Apt 2C

    Close
Show 23 more ↓
  • Safety

    Sprinkler

    Aug 31, 2026 · Apt 1

    Close
  • Safety

    Sprinkler

    Aug 31, 2026 · Apt 1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 31, 2026 · Apt 1

    Close
  • General

    Signage missing

    Aug 31, 2026 · Apt 1

    Close
  • General

    Signage missing

    Aug 12, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Jul 29, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Jul 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 29, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jul 29, 2026 · Apt BLDG

    Close
  • General

    Signage missing

    Jul 29, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Mar 30, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt WHOLEB

    Close
  • Water leak

    Heavy flow

    Jan 23, 2026 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Jan 23, 2026 · Apt 2C

    Close
  • Safety

    Fire escape

    Jan 21, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 21, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Jan 21, 2026 · Apt BLDG

    Close
  • Electric

    Wiring

    Dec 31, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Dec 31, 2025 · Apt 2

    Close
  • General

    Bell/buzzer/intercom

    Aug 5, 2025 · Apt BLDG

    Close
  • Door/window

    Door frame

    Apr 3, 2024 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Apr 3, 2024 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Mar 23, 2024 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
2013
Floors
4
Residential units
5
Building area
4,962 ft²
Lot area
1,800 ft²
Zoning
R6
Community board
313
Council district
48
Block / lot
8667 / 735
Assessed value
$502,650
Landmark / historic district
No

Questions about 2943 Brighton 7 Street

Who owns 2943 Brighton 7 Street?

The owner of record in NYC Department of City Planning PLUTO data is Alfa Seven Realty LLC.

Does 2943 Brighton 7 Street have violations?

Yes. NYC HPD has recorded 4 housing violations at this property.

Is 2943 Brighton 7 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2943 Brighton 7 Street built?

City records list 2013 as the year it was built.

How many apartments are in 2943 Brighton 7 Street?

It has 5 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.